Permit Information
Permit NumberBLD16-01759
StatusFinaled
Name RAM CONSTRUCTION
Site Address 501 S CURTIS RD
Project NameCassia Crossing Renovation
Customer Number16-01623 EPLAN,01759-01773
ePlanReview 
Description
(16 PERMITS TOTAL FILED UNDER BLD16-01623 IN EPLANREVIEW) Permit for the replacement of the exterior stairs, and balcony guards with code compliant stairs and gaurds to include new footings and landing at the bottom of the exterior stairs for an existing 4-plex. The existing egress balconies are also being repaired. Work also to include repalcement of interior finishes and replacement of some of the interior fixtures. All work per the approved plans. Thsi building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201610/31/201610/31/2016PPASS
DetailsMike Jordan
DOC - Permit Finaled10/31/201610/31/201610/31/2016PPASS
DetailsMike Jordan
BLD-Framing/Rough-in10/31/201610/31/201610/31/2016PPASS
DetailsMike Jordan
Rob Phone #: ###-####
Override - Parcel Holds10/31/20161/1/190010/31/2016  
frame
BLD-Footing10/24/201610/25/201610/25/2016APASS
DetailsMike Jordan
Cameron-stair case Phone #: ###-####
BLD-Framing/Rough-in9/27/20169/28/20169/28/2016AFAIL
DetailsMike Jordan
would like call ahead; Brian Phone #: ###-####. Tread height from bottom tread to landing exceeds the & inch max height allowed. Correction notice issued.
BLD-Framing/Rough-in9/23/20169/26/20169/27/2016ANR
DetailsJim Sly
Balcony Rob Phone #: ###-####
No plans Talked to Rob....Check rise.
Override - Parcel Holds9/27/20161/1/19009/27/2016  
frame only
BLD-Other9/8/20169/8/20169/8/2016APEND
DetailsBob Archibald
Work in progress (slow). Some patios have had structural elements removed for replacement. No new stairways have been installed. There are three existing stairways at Curtis entrance to site that will have to be verified. Some trade work in progress.
Issue PAID IN FULL permit  7/15/2016 DONE
Inspection Record Card- Bld  7/15/2016 DONE
OVERRIDE  7/8/2016  
OVERRIDE  7/8/2016  
Plan assigned to (CDM)5/18/20165/18/20167/8/2016 PASS
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK7/8/2016 7/8/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/8/2016 DONE
Override - Parcel Holds  7/8/2016  
Permit Ready to Issue  7/8/2016 DONE
Need GC Form and revised certificate of value for issuance.
STOP WORK ORDER IN PLACE - Investigation fee must be added for Final permit fee
DO NOT ISSUE WITHOUT ADDITIONAL 15 PERMITS
1st review completed  6/7/2016 FAIL
Routing - PLAN CHECK5/18/2016 6/7/2016 FAIL
DetailsCarl D Madsen
Routing - Erosion and Sediment5/18/2016 6/1/2016 CANC
DetailsEvan Jenkins
Please Reference ESC16-00731 for coverage
Routing - PLANNING5/18/2016 5/24/2016 PASS
DetailsCeline Acord
Routing - FIRE5/18/20165/18/20165/23/2016 PASS
DetailsScott Arellano
No comments attached.
Routing - PLANNING Land Div5/18/2016 5/19/2016 PASS
DetailsTodd Tucker
Routing - Addressing5/18/2016 5/19/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/18/2016 5/18/2016 PASS
DetailsRachael Beierle
Intake Approval  5/17/2016 PASS
First Notice10/31/201610/31/2016   
DetailsMike Jordan
Application received 5/17/2016   
Application received 5/17/2016