First Notice | | 3/10/2017 | 4/12/2017 | | DONE |
|
|
|
mailed 4-13-17
|
Permanent Occupancy | | | 2/28/2017 | | DONE |
|
|
|
|
BLD-Final | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PASS |
Jim Sly
|
|
|
Please call 30-40 minutes ahead for access - Randy Phone #: ###-####
|
FIRE-Final Inspection | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 12/19/2016 | 1/20/2017 | 1/20/2017 | A | DONE |
Jim Sly
|
|
|
Call dennis Harmon ###-####. Need to check to see if Corson is still occupying space. (or go by). No cars, no humans, no lights.........It appears that they have moved out.
|
BLD-Conference | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PEND |
Jim Sly
|
|
|
Got ahold of Dennis Harmon....reminded him of previous correction notice pending.
|
BLD-Aging Inspection | 12/14/2016 | 12/14/2016 | 12/19/2016 | | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 12/15/2016 | 12/15/2016 | 12/19/2016 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 11/18/2016 | 11/21/2016 | 11/21/2016 | A | PEND |
Jim Sly
|
|
|
Check for final. All other trades appear completed. Issued correction notice. CN.......Complete fire corrections. call for fire final, then bldg. final.
|
Plan assigned to (JG) | 8/11/2016 | 8/11/2016 | 8/12/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/11/2016 | | 8/12/2016 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 8/12/2016 | | DONE |
Javier Guzman
|
|
|
|
Print Occupancy Form | | | 8/12/2016 | | DONE |
|
|
|
|
Telephone call | | | 8/12/2016 | | DONE |
|
|
|
Spoke with Dennis informing him that the plan mod is ready and the fees due. Also told him that the Value sheet with the plan mod application needs to be filled out
|
(F) Reprint permit | | | 8/12/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/12/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/11/2016 | | DONE |
|
|
|
modification to the floor plan (A-2)
|
FIRE-Final Inspection | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for all fire extinguishers, resubmit plans showing storage and ladder access to mezzanine above the office area, a fire extinguisher is required on the mezzanine, repair the existing fire alarm system (A manual pull station has been removed from wall near office door to warehouse.
|
BLD-Framing/Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Jim Sly
|
|
|
Please call Randy with results@###-#### Thanknyou Phone #: ###-#### Inspection requested via web by Dennis Harmon
|
Plan assigned to (JG) | 6/28/2016 | 6/28/2016 | 7/1/2016 | | PASS |
Javier Guzman
|
|
|
Plan Mod Corson Distilling Bathroom Add
|
Routing - PLAN CHECK | 6/28/2016 | | 7/1/2016 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/1/2016 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 7/1/2016 | | DONE |
|
|
|
DO NOT ISSUE PLAN MOD
|
Telephone call | | | 7/1/2016 | | DONE |
|
|
|
Spoke with Denis informing him the plan modifications are ready to be picked up and the fee amount that is due
|
CHANGE STATUS TO (ISS) | | | 7/1/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/1/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/1/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/28/2016 | | DONE |
|
|
|
modification to plan sheets; M-1, A-1
|
Issue PAID IN FULL permit | | | 6/24/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/17/2016 | 5/17/2016 | 6/22/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 5/30 L2 Corson bathroom addition paper
|
Routing - PLAN CHECK | 6/9/2016 | | 6/22/2016 | | FAIL |
Javier Guzman
|
|
|
resubmittals came back in with a ne exterior wall opening so i routed to DR
|
Routing - PLAN CHECK | 6/22/2016 | | 6/22/2016 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 6/22/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2016 | | DONE |
|
|
|
requirments met
|
Print Occupancy Form | | | 6/22/2016 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2016 | | DONE |
|
|
|
called Dennis to let know permit is ready and how much is owed-he requested an email for the fees due so i emailed him fees due
|
Routing - Design Review | 6/9/2016 | | 6/13/2016 | | PASS |
Sarah Schafer
|
|
|
|
Plan resubmittals received | | | 6/9/2016 | | DONE |
|
|
|
received 2 copies of sheet G-1 and A-1. Also received a plan review report and response letter- put on JG's desk
|
Routing - PLAN CHECK | | | 5/31/2016 | | FAIL |
Javier Guzman
|
|
|
review report emailed
|
Routing - FIRE | 5/26/2016 | | 5/27/2016 | | PASS |
Scott Arellano
|
|
|
No separate comments attached. However, a separate fire sprinkler permit will be required.
|
1st review completed | | | 5/27/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 5/20/2016 | | 5/26/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC, ASSE 1070 mixing valve at the public lav.
|
Routing - PUBLIC WORKS | | | 5/20/2016 | | PASS |
|
|
|
Musgrove Engineering says bathroom only. They were not hired to design distillery. bam
|
Routing - Addressing | 5/17/2016 | | 5/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2016 | | DONE |
|
|
|
|
Intake Approval | | | 5/17/2016 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2016 | | DONE |
|
|
|
|
Application received | | 5/17/2016 | | | |
|
|
|
|