(F) Reprint permit | | | 4/12/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/12/2017 | | DONE |
|
|
|
plan mod fees paid
|
FIRE-Final Inspection | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | CANC |
Troy Cobbley
|
|
|
Paul Phone #: ###-####
|
Plan assigned to (JG) | 7/26/2016 | 7/26/2016 | 3/30/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, SARMC BEHAVIORAL HEALTH SERVICES REMODEL, plan mod 180 day letter sent (exp. 12/26/16)
|
Change Expiration Date Only | | | 3/30/2017 | | DONE |
Jason Blais
|
|
|
|
Routing - PLAN CHECK | 3/30/2017 | | 3/30/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/30/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Plan Reviewer's activity | | | 3/27/2017 | | DONE |
Javier Guzman
|
|
|
180 day letter sent
|
Route to Impact Fee Review | 1/15/2017 | 1/18/2017 | 1/17/2017 | | PASS |
Cindy M. Gould
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 7/26/2016 | | DONE |
Christina Prado
|
|
|
to reflect changes made to sheet A0.1 per the Building Inspector
|
Routing - PLAN CHECK | 7/26/2016 | | 7/26/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
BLD-Ceiling Grid Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-####
|
FIRE-Conference | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | DONE |
Troy Cobbley
|
|
|
The project superintendant and I went over life safety requirements. I suggested that he employ a fire alarm contractor to see if the existing fire alarm system needs to be extended into the remodel area.
|
BLD-Framing/Rough-in | 6/28/2016 | 6/29/2016 | 6/29/2016 | A | PART |
Mike Jordan
|
|
|
Paul Phone #: ###-####. Interior steel stud framed wall ok. A correction notice was issued to correct building construction type and for the 1hr. rated corridors.
|
Issue PAID IN FULL permit | | | 5/25/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/20/2016 | 5/20/2016 | 5/24/2016 | | PASS |
Javier Guzman
|
|
|
5/26 L2 SARMC Behavioral Health Remodel, ePlan, Pending DR for 1st rev
|
1st review completed | | | 5/24/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2016 | | DONE |
Christina Prado
|
|
|
***all requirments met 5-25-16 pdf
Need GC Form & Revised Certificate of value for issuance
|
Routing - PLAN CHECK | 5/20/2016 | | 5/23/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 5/23/2016 | | 5/23/2016 | | PASS |
Sarah Schafer
|
|
|
Spoke with Aurora from LCA. They are replacing one window unit with a like kind. The number and location of all window openings will remain the same. No additional exterior work is anticipated for this project.
|
Routing - Addressing | 5/20/2016 | | 5/20/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/20/2016 | | 5/20/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 5/20/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 5/17/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 17 2016 11:57AM
|