Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-01799
StatusFinaled
Name JED DILWORTH CONSTRUCTION
Site Address 3304 E ECHO CT
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A - Permit for the construction of a new 3,105 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 353 sq. ft. of covered patio/porch and a 1098 sq. ft. attached garage per the approved plans, and any notations. R-1A/DA zoning and setbacks per planning. **DAF**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/7/201612/9/201612/9/2016PPASS
DetailsPhil Shearer
Please Call prior to coming so I can be there... Thx
Cinnamon Phone #: ###-#### Inspection requested via web by Jed Dilworth-would like you to go as late as possible
DOC - Permit Finaled12/9/201612/9/201612/9/2016PPASS
DetailsPhil Shearer
DOC - Permit Finaled12/9/201612/9/201612/9/2016PPASS
DetailsPhil Shearer
BLD-Final12/7/201612/8/201612/7/2016PCANC
DetailsPhil Shearer
Phil - please call prior to coming up so I can make sure I meet you there.
thanks so much
Cinnamon Phone #: ###-#### >> Inspection requested via web by Jed Dilworth Inspection cancelled from web by: Jed Dilworth
PubWorks Occupancy Approval12/7/201612/7/201612/7/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Other9/28/20169/28/20169/28/2016PPASS
DetailsPhil Shearer
cinnamon - soffit Phone #: ###-####
BLD-Other9/27/20169/27/20169/27/2016PCANC
DetailsPhil Shearer
This is for inspection on the patio area
Thanks
Cinnamon Dilworth Phone #: ###-#### >> Inspection requested via web by Jed Dilworth
BLD-Other9/26/20169/26/20169/26/2016AFAIL
DetailsPhil Shearer
This is for the inspection showing I have sheet rock in the sofffit.
Thanks
Cinnamon Dilworth Phone #: ###-#### Inspection requested via web by Jed Dilworth
BLD-Energy code compliance9/2/20169/8/20169/8/2016PPASS
DetailsJim Sly
everything is on the fire place // cinnamen Phone #: ###-####
BLD-Framing/Rough-in9/1/20169/2/20169/2/2016PPART
DetailsPhil Shearer
Cinnamon Phone #: ###-####.
Provide Engineered fix for t46 truss, missing hangers on j5 trusses, Fire blocking.
BLD-Wall Bracing8/8/20168/9/20168/9/2016APASS
DetailsJim Storey
I have the information in regards to the nailing pattern. If you call me when you are headed up that direction I will call the framer and let him know and we will meet you there. Thanks so much Phone #: ###-#### Inspection requested via web by Jed Dilworth
BLD-Wall Bracing8/5/20168/8/20168/8/2016AFAIL
DetailsPhil Shearer
Call Cinnamon ###-#### and I can meet you at the site. Phone #: ###-#### Inspection requested via web by Jed Dilworth
Inspection Record Card- Bld  7/6/2016 DONE
BLD-Foundation6/27/20166/28/20166/28/2016APASS
DetailsPhil Shearer
Kevin-wall Phone #: ###-####
BLD-Footing6/23/20166/24/20166/24/2016PPASS
DetailsPhil Shearer
Keith Phone #: ###-####
PubWorks Subgrade Approval6/23/20166/23/20166/23/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  6/7/2016  
Plan assigned to (DAF)5/23/20165/23/20166/7/2016 DONE
DetailsDavid Ferguson
due 6/7 L2 hillside - Plan Review complete - Troy needs to approve Manual J
Routing - MECHANICAL6/7/2016 6/7/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  6/7/2016 DONE
Permit Ready to Issue  6/7/2016 DONE
All Met
Inspection Record Card- Bld  6/7/2016 DONE
Telephone call  6/7/2016 DONE
called Jed- told Cinnamon that permit is ready and fees due
Issue PAID IN FULL permit  6/7/2016 DONE
Routing - MECHANICAL5/23/2016 6/6/2016 FAIL
DetailsTroy James
emailed 4 seasons
Routing - PLAN CHECK5/27/2016 6/3/2016 PASS
DetailsDavid Ferguson
1st review completed  6/3/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  6/3/2016 DONE
DetailsDavid Ferguson
Routing - FIRE5/27/20165/17/20165/27/2016 PASS
DetailsScott Arellano
This home has been evaluated for FD vehicle access and defensible space. East Birdsong street is being constructed behind this structure.
Routing - Erosion and Sediment  5/27/2016 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Valid RP and PD designated. ESC site preparation inspection required, call ###-####
Routing - PUBLIC WORKS5/19/2016 5/23/2016 PASS
DetailsJennifer Bruner
Routing - PLANNING5/23/2016 5/23/2016 PASS
DetailsBrent Moore
Plan assigned to (LEG) Tisha5/17/2016 5/23/2016 DEFR
DetailsTisha Gallop
Routing PW Grading-Hillside5/19/2016 5/23/2016 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing PW Sewer Rating5/19/2016 5/19/2016 PASS
DetailsJennifer Bruner
Routing - Addressing5/17/2016 5/19/2016 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  5/17/2016 DONE
Intake Approval  5/17/2016 PASS
Recd Pcfee & Taken To Pln CK  5/17/2016 DONE
Application received 5/17/2016