Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-01847
StatusFinaled
Name CBH HOMES
Site Address 2671 N FASTWATER AVE
Project NameDropzone Apartments
Customer Number16-1848 - 1850
ePlanReviewYes
Description
(DROPZONE APARTMENTS)PLAN MODIFICATION TO CHENGE THE TYPE AND LOCATION OF THE HVAC UNITS. Building 2 - To construct a new 9,770 square foot, two story, wood framed, eight unit apartment building and related site improvements. First Floor: 5,070 sq. ft., Second Floor: 4700 sq. ft. This building has a 13R sprinkler system. This building has the required type A accessible unit required for this project. All construction per the approved plans and attached comment list. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20177/18/20177/18/2017APASS
DetailsJim Sly
Colby Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  7/18/2017 DONE
BLD-Final7/14/20177/17/20177/17/2017ACANC
DetailsJim Sly
Colby Phone #: ###-#### need zoning
Zoning Approval7/17/20177/17/20177/17/2017 DONE
DetailsTodd Tucker
PubWorks Occupancy Approval7/14/20177/14/20177/14/2017 DONE
DetailsTiffany Lowery
FIRE-Final Inspection7/10/20177/11/20177/11/2017APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/28/20176/29/20176/29/2017AFAIL
DetailsTroy Cobbley
Provide verification of evacution guides as discussed, provide closers on exterior doors, provide 3' minimum clearance from smoke alarms to bathroom doors with tub or shower.
BLD-Energy code compliance4/5/20174/6/20174/6/2017APASS
DetailsJim Sly
south end; Colby Phone #: ###-####
BLD-Energy code compliance4/5/20174/5/20174/5/2017PPART
DetailsJim Sly
Colby Phone #: ###-####
N 1/2 f
BLD-Framing/Rough-in3/31/20174/3/20174/3/2017APASS
DetailsJim Sly
Colby Phone #: ###-####
BLD-Other3/14/20173/15/20173/15/2017APASS
DetailsJim Sly
fire caulking; Colby Phone #: ###-####
BLD-Framing/Rough-in3/14/20173/15/20173/15/2017APASS
DetailsJim Sly
Colby Phone #: ###-####
BLD-Wall Bracing2/16/20172/17/20172/17/2017APASS
DetailsJim Sly
Shear // Colby Phone #: ###-####
BLD-Wall Bracing2/15/20172/16/20172/16/2017PPART
DetailsJim Sly
partial shear on breezeways-Colby Phone #: ###-####
Breezways only.....OK.
BLD-Foundation11/15/201611/16/201611/16/2016APASS
DetailsJim Sly
Rebar // Colby Phone #: ###-####
BLD-Footing11/15/201611/16/201611/16/2016APASS
DetailsJim Sly
Colby Phone #: ###-####
BLD-Foundation11/7/201611/8/201611/8/2016PCANC
DetailsJim Sly
Colby Phone #: ###-####
Ridgid insulation at foundation....OK.
BLD-Foundation11/3/201611/4/201611/7/2016PPASS
DetailsDave Hannah
Dane Phone #: ###-####
OVERRIDE  11/7/2016  
CHANGE STATUS TO (ISS)  11/7/2016 DONE
Plan Mod
(F) Reprint permit  11/7/2016 DONE
Permit Ready to Issue  11/7/2016 DONE
DO NOT RE ISSUE PLAN MOD
Plan assigned to (CDM)10/21/201610/21/201611/5/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/27/2016 11/5/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/5/2016 DONE
BLD-Footing11/2/201611/3/201611/3/2016PPASS
DetailsJim Sly
Dane Phone #: ###-####
Routing - MECHANICAL10/27/2016 10/28/2016 PASS
DetailsTroy James
Routing - PLANNING10/27/2016 10/28/2016 PASS
DetailsCody Riddle
Plan Modification Accepted  10/21/2016 DONE
DetailsChristina Prado
Plan mod to update mechanical HVAC from roof mounted to wall mount units
Print Occupancy Form  10/13/2016 DONE
Issue PAID IN FULL permit  10/13/2016 DONE
OVERRIDE  10/6/2016  
Plan assigned to (CDM)8/12/20168/12/201610/6/2016 PASS
DetailsCarl D Madsen
first review completed
Routing - PLAN CHECK10/6/2016 10/6/2016 PASS
DetailsCarl D Madsen
Routing - MECHANICAL10/6/2016 10/6/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  10/6/2016 DONE
Permit Ready to Issue  10/6/2016 DONE
Needs: GC Form, Revised Cert of Value, ACHD
Routing - PLAN CHECK9/20/2016 9/24/2016 PASS
DetailsCarl D Madsen
Routing - MECHANICAL9/20/2016 9/22/2016 FAIL
DetailsTroy James
Routing - PLUMBING9/21/2016 9/21/2016 PASS
DetailsBill VanDegrift
water heaters resized ok, should have had a typical piping plan
Routing Off Site - STRUCTURAL9/20/2016 9/20/2016 PASS
DetailsCarl D Madsen
1st review completed  9/1/2016 FAIL
Routing - PLAN CHECK8/12/2016 9/1/2016 FAIL
DetailsCarl D Madsen
Routing - PLANNING Land Div8/12/2016 8/18/2016 PASS
DetailsTodd Tucker
Routing - PLANNING8/17/2016 8/17/2016 PASS
DetailsCody Riddle
Site inspection confirmed the landscaping along Cloverdale Road was installed with the subdivision.
Routing PW Drainage8/12/2016 8/17/2016 PASS
DetailsBrian Murphy
Routing - PLUMBING8/12/2016 8/16/2016 FAIL
DetailsBill VanDegrift
Water heaters spec'd for job doesn't meet 1st hour rating requirements of ISPC.
Routing - FIRE8/12/20168/12/20168/15/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Erosion and Sediment8/12/2016 8/15/2016 PASS
DetailsEvan Jenkins
(Site prep inspection and approval required prior to earth disturbance)

(DROPZONE APARTMENTS) 32 unit apartment project, (4) 2 story, 8 unit apartment buildings.
Routing PW Sewer Design8/12/2016 8/15/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste8/12/2016 8/15/2016 PASS
DetailsPeter J. McCullough
Approved for 3-yard container only.
Routing - PLANNING8/12/2016 8/15/2016 FAIL
DetailsCody Riddle
A number of plantings between the buildings and Cloverdale Road have not been included. Emailed applicant today. CER 8/15/16
Routing - Addressing8/12/2016 8/15/2016 PASS
DetailsLaura Hunter
Routing - MECHANICAL8/12/2016 8/15/2016 FAIL
DetailsTroy James
Routing - PUBLIC WORKS8/12/2016 8/12/2016 PASS
DetailsRachael Beierle
Intake Approval  8/12/2016 PASS
Intake Approval  5/23/2016 FAIL
DetailsAdele J Schaffeld-Griffin
see mark ups on check list for outstanding items.
Application received  5/20/2016 DONE
Application submitted via PDS Online on May 20 2016 9:35AM