BLD-Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 7/18/2017 | | DONE |
|
|
|
|
BLD-Final | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | CANC |
Jim Sly
|
|
|
Colby Phone #: ###-#### need zoning
|
Zoning Approval | 7/17/2017 | 7/17/2017 | 7/17/2017 | | DONE |
Todd Tucker
|
|
|
|
PubWorks Occupancy Approval | 7/14/2017 | 7/14/2017 | 7/14/2017 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of evacution guides as discussed, provide closers on exterior doors, provide 3' minimum clearance from smoke alarms to bathroom doors with tub or shower.
|
BLD-Energy code compliance | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | PASS |
Jim Sly
|
|
|
West-End ONLY; Colby Phone #: ###-#### All energy code....passed.
|
BLD-Energy code compliance | 3/15/2017 | 3/16/2017 | 3/16/2017 | A | PART |
Jim Sly
|
|
|
Colby Phone #: ###-#### East 1/2 f
|
BLD-Framing/Rough-in | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PASS |
Jim Sly
|
|
|
Colby partial framing Phone #: ###-####
|
BLD-Conference | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | DONE |
Jim Sly
|
|
|
Colby Phone #: ###-#### Discussed Firestopping with Colby.
|
BLD-Conference | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | DONE |
Mike Jordan
|
|
|
Colby Phone #: ###-####. Went over firestoping.
|
BLD-Wall Bracing | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Jim Sly
|
|
|
colby Phone #: ###-####
|
BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PART |
Jim Sly
|
|
|
Breez way shear // Colby Phone #: ###-#### Breezway at E. and W. ends.....OK
|
BLD-Wall Bracing | 2/1/2017 | 2/2/2017 | 2/2/2017 | P | NR |
Jim Storey
|
|
|
Shear // Colby Phone #: ###-#### missing blk. over drinen as well as un nailed
|
BLD-Conference | 12/19/2016 | 12/20/2016 | 12/20/2016 | A | DONE |
Jim Sly
|
|
|
colby Phone #: ###-#### Met with Colby and Mech Contractor.
|
BLD-Footing | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Jim Sly
|
|
|
Colby this is ready for the Am If possible Phone #: ###-####
|
OVERRIDE | | | 11/7/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/7/2016 | | DONE |
|
|
|
plan mod only - no fees due as per Carl Madsen
|
Permit Ready to Issue | | | 11/7/2016 | | DONE |
|
|
|
plan mod - no fees due as per Carl Madsen
|
Plan assigned to (CDM) | 10/27/2016 | 10/27/2016 | 11/5/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/27/2016 | | 11/5/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 10/27/2016 | | 11/5/2016 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2016 | | DONE |
|
|
|
|
BLD-Foundation | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PART |
Jim Sly
|
|
|
Colby Phone #: ###-#### Ridgid Foam OK.
|
BLD-Foundation | 10/28/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
Routing - PLANNING | 10/27/2016 | | 10/28/2016 | | PASS |
Cody Riddle
|
|
|
|
Print Occupancy Form | | | 10/13/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/13/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/6/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 8/12/2016 | 8/12/2016 | 10/6/2016 | | PASS |
Carl D Madsen
|
|
|
first review completed
|
Routing - MECHANICAL | 9/20/2016 | | 10/6/2016 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2016 | | DONE |
|
|
|
Needs: GC Form, Revised Cert of Value, ACHD
|
Routing - PLAN CHECK | 9/20/2016 | | 9/24/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 9/20/2016 | | 9/21/2016 | | PASS |
Bill VanDegrift
|
|
|
|
Routing Off Site - STRUCTURAL | 9/20/2016 | | 9/20/2016 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 9/1/2016 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 8/12/2016 | | 9/1/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 8/12/2016 | | 9/1/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 8/12/2016 | | 9/1/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 8/12/2016 | | 9/1/2016 | | FAIL |
Bill VanDegrift
|
|
|
|
Routing - PLANNING | 8/12/2016 | | 8/29/2016 | | PASS |
Cody Riddle
|
|
|
|
Routing - PLANNING Land Div | 8/12/2016 | | 8/29/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Drainage | 8/12/2016 | | 8/29/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 8/12/2016 | | 8/29/2016 | | PASS |
Peter J. McCullough
|
|
|
3- yard only
|
Routing - FIRE | 8/12/2016 | 8/12/2016 | 8/15/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 8/12/2016 | | 8/15/2016 | | PASS |
Evan Jenkins
|
|
|
(Site prep inspection and approval required prior to earth disturbance)
(DROPZONE APARTMENTS) 32 UNITS 4 BUILDINGS.
|
Routing - Addressing | 8/12/2016 | | 8/15/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/12/2016 | | 8/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/12/2016 | | PASS |
|
|
|
|
Application received | | | 5/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2016 9:42AM
|