Permit Information
Permit NumberBLD16-01850
StatusFinaled
Name CBH HOMES
Site Address 2663 N FASTWATER AVE
Project NameDropzone Apartments
Customer Number16-01847 - 01849
ePlanReview 
Description
(DROPZONE APARTMENTS)PLAN MODIFICATION TO CHENGE THE TYPE AND LOCATION OF THE HVAC UNITS. Building 3 - To construct a new 9,770 square foot, two story, wood framed, eight unit apartment building and related site improvements. First Floor: 5,070 sq. ft., Second Floor: 4700 sq. ft. This building has a 13R sprinkler system. All construction per the approved plans and attached comment list. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20177/18/20177/18/2017APASS
DetailsJim Sly
Colby Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  7/18/2017 DONE
BLD-Final7/14/20177/17/20177/17/2017ACANC
DetailsJim Sly
Colby Phone #: ###-#### need zoning
Zoning Approval7/17/20177/17/20177/17/2017 DONE
DetailsTodd Tucker
PubWorks Occupancy Approval7/14/20177/14/20177/14/2017 DONE
DetailsTiffany Lowery
FIRE-Final Inspection7/10/20177/11/20177/11/2017APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection6/28/20176/29/20176/29/2017AFAIL
DetailsTroy Cobbley
Provide verification of evacution guides as discussed, provide closers on exterior doors, provide 3' minimum clearance from smoke alarms to bathroom doors with tub or shower.
BLD-Energy code compliance4/13/20174/14/20174/14/2017APASS
DetailsJim Sly
south side - Colby Phone #: ###-####
BLD-Energy code compliance4/12/20174/13/20174/13/2017APART
DetailsJim Sly
Colby Phone #: ###-####-north end of building only
North end only....OK.
BLD-Framing/Rough-in4/10/20174/11/20174/11/2017APASS
DetailsJim Sly
Colby Phone #: ###-####
BLD-Framing/Rough-in3/22/20173/23/20173/23/2017APASS
DetailsJim Sly
Phone #: ###-####
BLD-Framing/Rough-in2/24/20172/24/20172/24/2017PPART
DetailsJim Sly
Colby would like a shear inspection. Phone #: ###-####
Wall Bracing ...OK
BLD-Wall Bracing2/22/20172/23/20172/23/2017APART
DetailsJim Sly
Colby-partial shear on breezeways only Phone #: ###-#### OK
BLD-Other11/16/201611/17/201611/17/2016PPASS
DetailsJim Sly
colby - underslab rebar Phone #: ###-####
BLD-Foundation11/9/201611/10/201611/10/2016PPASS
DetailsJim Sly
colby Phone #: ###-####
Interior footings....OK.
BLD-Foundation11/7/201611/8/201611/8/2016PNR
DetailsJim Sly
Colby Phone #: ###-####
OVERRIDE  11/7/2016  
CHANGE STATUS TO (ISS)  11/7/2016 DONE
plan mod only - no fees due as per Carl Madsen
Permit Ready to Issue  11/7/2016 DONE
plan mod only - no fees due as per Carl Madsen
Plan assigned to (CDM)10/27/201610/27/201611/5/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/27/2016 11/5/2016 PASS
DetailsCarl D Madsen
Routing - MECHANICAL10/27/2016 11/5/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  11/5/2016 DONE
BLD-Foundation11/1/201611/2/201611/2/2016PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing10/31/201611/1/201611/1/2016PPASS
DetailsJim Sly
Dane Phone #: ###-####
Routing - PLANNING10/27/2016 10/28/2016 PASS
DetailsCody Riddle
Issue PAID IN FULL permit  10/13/2016 DONE
Print Occupancy Form  10/13/2016 DONE
OVERRIDE  10/6/2016  
Plan assigned to (CDM)8/12/20168/12/201610/6/2016 PASS
DetailsCarl D Madsen
first review completed
Routing - MECHANICAL9/20/2016 10/6/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  10/6/2016 DONE
Permit Ready to Issue  10/6/2016 DONE
Needs: GC Form, Revised Cert of Value, ACHD
Routing - PLAN CHECK9/20/2016 9/24/2016 PASS
DetailsCarl D Madsen
Routing - PLUMBING9/20/2016 9/21/2016 PASS
DetailsBill VanDegrift
Routing Off Site - STRUCTURAL9/20/2016 9/20/2016 PASS
DetailsCarl D Madsen
1st review completed  9/1/2016 FAIL
Routing PW Sewer Design8/12/2016 9/1/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - MECHANICAL8/12/2016 9/1/2016 FAIL
DetailsTroy James
Routing - PLUMBING8/12/2016 9/1/2016 FAIL
DetailsBill VanDegrift
Routing - PLAN CHECK8/12/2016 9/1/2016 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL8/12/2016 9/1/2016 FAIL
DetailsCarl D Madsen
Routing - PLANNING Land Div8/12/2016 8/29/2016 PASS
DetailsTodd Tucker
Routing - PLANNING8/12/2016 8/29/2016 PASS
DetailsCody Riddle
Routing PW Solid Waste8/12/2016 8/29/2016 PASS
DetailsPeter J. McCullough
3-yard only
Routing PW Drainage8/12/2016 8/29/2016 PASS
DetailsBrian Murphy
Routing - FIRE8/12/20168/12/20168/15/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Erosion and Sediment8/12/2016 8/15/2016 PASS
DetailsEvan Jenkins
(site prep inspection and approval required prior to earth disturbance)

(DROPZONE APARTMENTS) 32 UNITS 4 BUILDINGS
Routing - Addressing8/12/2016 8/15/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS8/12/2016 8/12/2016 PASS
DetailsRachael Beierle
Intake Approval  8/12/2016 PASS
Application received  5/20/2016 DONE
Application submitted via PDS Online on May 20 2016 9:53AM