BLD-Footing | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | DONE |
Tony Young
|
|
|
Pat Phone #: ###-####,, was redone,, poured,, looks ok
|
DOC - Permit Finaled | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
Case Summary (BLD) | | | 6/20/2018 | | DONE |
Rita DeYoung
|
|
|
Received letter from Property owner that he was taking the job over. Pat Coopi provided letter terminating his relationship with the GC
|
BLD-Conference | 7/5/2017 | 7/6/2017 | 7/11/2017 | P | DONE |
Bob Archibald
|
|
|
Evaluation of deck. CN issued for footings and stair ledger.
|
BLD-Final | 6/21/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Tony Young
|
|
|
Alex Phone #: ###-####
|
DOC - Permit Finaled | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/21/2017 | 6/21/2017 | 6/21/2017 | P | PART |
Tony Young
|
|
|
Alex Phone #: ###-####,, ok after returning lower hand rail to side
|
(F) Reprint permit | | | 6/20/2017 | | DONE |
|
|
|
customer asked us to email him a copy of the permit
|
BLD-Conference | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, ?s on deck construction/ requirments
|
BLD-Final | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | NR |
Jim Sly
|
|
|
Alex Phone #: ###-#### No one at home.......Peeked around corner .....Noticed deck had no handrail or risers filled in to less than 4". called contr.
|
Issue PAID IN FULL permit | | | 6/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/14/2016 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/24/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/24/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/24/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (LEG) Tisha | 5/24/2016 | | 5/24/2016 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 5/24/2016 | | 5/24/2016 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 5/24/2016 | | 5/24/2016 | | PASS |
Colleen T Carroll
|
|
|
|
1st review completed | | | 5/24/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2016 | | DONE |
|
|
|
n/a esc, n/a energy
|
Permit Ready to Issue | | | 5/24/2016 | | DONE |
|
|
|
All Met
|
Application received | | | 5/23/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 23 2016 6:34AM
|