BLD-Final | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | NR |
Jim Storey
|
|
|
Eric// please call before Phone #: ###-#### need ele final insp.
|
BLD-Framing/Rough-in | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Dave Hannah
|
|
|
Call half hour before // Eric Phone #: ###-####
|
Routing - PLAN CHECK | 5/27/2016 | | 5/27/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/27/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2016 | | DONE |
Brian McGowan
|
|
|
ESC - No Energy - Yes
|
Permit Ready to Issue | | | 5/27/2016 | | DONE |
|
|
|
all requirements met
|
Telephone call | | | 5/27/2016 | | DONE |
|
|
|
called GC let them know fees due and that permit is ready
|
Issue PAID IN FULL permit | | | 5/27/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/24/2016 | | DONE |
|
|
|
Two copies of Main level floor plan and engineering. Brian Mc
|
Routing Walk-In (Zoning) | 5/23/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Celine Acord
|
|
|
|
1st review completed | | | 5/23/2016 | | FAIL |
Brian McGowan
|
|
|
Engineering for hand stacked area was not provided. Will be emailed to me asap.
|
Routing - PLAN CHECK | 5/23/2016 | | 5/23/2016 | | FAIL |
Brian McGowan
|
|
|
Engineering for hand stacked area was not provided. Will be emailed to me asap.
|
Application received | | 5/23/2016 | | | |
|
|
|
|