Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-01894
StatusFinaled
Name JH DEVELOPMENT INC
Site Address 3353 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A ** Permit for the construction of a new 3792 sq. ft., two story (below grade 1148 sq. ft., at grade 2644 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 700 sq. ft. of covered patio/porch and a 963 sq. ft. attached garage per the approved plans, and any notations. R-1A/DA zoning and setbacks per planning. **DAF**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/8/20175/9/20175/9/2017APASS
DetailsBrandon Shaw
Eric Phone #: ###-####
DOC - Permit Finaled5/9/20175/9/20175/9/2017PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval5/9/20175/9/20175/9/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Other1/3/20171/4/20171/4/2017APASS
DetailsPhil Shearer
Eric-soffit Phone #: ###-####
BLD-Energy code compliance11/22/201611/23/201611/23/2016APASS
DetailsPhil Shearer
Insulation // Eric Phone #: ###-####
BLD-Framing/Rough-in11/23/201611/23/201611/23/2016PPASS
DetailsPhil Shearer
Insulation // Eric Phone #: ###-####
BLD-Framing/Rough-in11/17/201611/18/201611/18/2016APART
DetailsPhil Shearer
Eric Phone #: ###-####
Plan Modification Accepted  10/4/2016 DONE
new manual j report
Routing - MECHANICAL10/4/2016 10/4/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation7/18/20167/18/20167/18/2016PPASS
DetailsPhil Shearer
Request inspection about 3 Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Foundation7/13/20167/13/20167/13/2016PPASS
DetailsPhil Shearer
Request an early afternoon inspection Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing7/7/20167/7/20167/7/2016PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Sears
PubWorks Subgrade Approval7/5/20167/5/20167/5/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  6/21/2016 DONE
OVERRIDE  6/17/2016  
Plan assigned to (DAF)6/1/20166/1/20166/17/2016 DONE
DetailsDavid Ferguson
due 6/14 L2 hillside - Plan review complete. Jason T. failed grading plan
Inspection Record Card- Bld  6/17/2016 DONE
Telephone call  6/17/2016 DONE
notified customer that permit is ready
PLANS/APPL TAKEN TO FRONT DESK  6/17/2016 DONE
Permit Ready to Issue  6/17/2016 DONE
all requirements met
Routing PW Grading-Hillside6/16/2016 6/16/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS6/16/2016 6/16/2016 PASS
DetailsBeverly Mountain
1st review completed  6/9/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  6/9/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK5/24/2016 6/9/2016 PASS
DetailsDavid Ferguson
Routing - FIRE6/8/2016 6/8/2016 PASS
DetailsScott Arellano
No comments attached.
Routing - Erosion and Sediment6/6/2016 6/7/2016 PASS
DetailsEvan Jenkins
ESC plan submitted and approved. Valid PD and RP designated.
Routing PW Grading-Hillside5/24/2016 6/6/2016 FAIL
DetailsJason C. Taylor
Grading plan needs revised. See email comments dated May 6 2016. JCT
Routing - PUBLIC WORKS6/6/2016 6/6/2016 FAIL
DetailsRachael Beierle
FAILED HILLSIDE. SEE JCT.
Routing - MECHANICAL5/24/2016 6/6/2016 PASS
DetailsTroy James
Routing - PLANNING6/6/2016 6/6/2016 PASS
DetailsCeline Acord
CFH16-00029
Plan assigned to (LEG) Tisha5/24/2016 6/1/2016 DEFR
DetailsTisha Gallop
Routing - Addressing5/24/2016 5/26/2016 PASS
DetailsLaura Hunter
Routing PW Sewer Rating5/26/2016 5/26/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  5/24/2016 DONE
DetailsChristina Prado
Intake Approval  5/24/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/24/2016 DONE
DetailsChristina Prado
Application received 5/24/2016