First Notice | | 9/30/2016 | 10/7/2016 | | DONE |
|
|
|
This permit finaled on the web by Kevin Slazas
|
First Notice | 9/14/2016 | 9/14/2016 | 10/7/2016 | | DONE |
Mike Jordan
|
|
|
This permit finaled on the web by Kevin Slazas
|
Permanent Occupancy | | | 9/20/2016 | | |
|
|
|
|
Print Occupancy Form | | | 9/15/2016 | | DONE |
|
|
|
|
BLD-Final | 9/12/2016 | 9/13/2016 | 9/14/2016 | P | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 9/14/2016 | 9/14/2016 | 9/14/2016 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is in place and will be getting a current inspection tag. Final life fire safety inspection passed/complete.
|
Issue PAID IN FULL permit | | | 9/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/12/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/7/2016 | 9/7/2016 | 9/7/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PUBLIC WORKS | 9/7/2016 | | 9/7/2016 | | PASS |
Rachael Beierle
|
|
|
PLAN MOD. NO NEW PLUMBING.
|
Plan Modification Accepted | | | 9/7/2016 | | DONE |
|
|
|
Modification to reduce scope of work
|
Plan assigned to (JG) | 8/24/2016 | 8/24/2016 | 8/30/2016 | | PASS |
Javier Guzman
|
|
|
Treasure Valley IT - Suite 120 pending fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2016 | | DONE |
|
|
|
|
Meeting | | | 8/30/2016 | | DONE |
|
|
|
e plan review plan mod was done on 8-24-16-the permit is not issued so it was a resubmittal-batch stamp was done on 8-31-16
|
Permit Ready to Issue | | | 8/30/2016 | | DONE |
|
|
|
***MET***need GC form
|
Routing - FIRE | 8/24/2016 | 8/24/2016 | 8/29/2016 | | PASS |
Katie Marron
|
|
|
Plan modification reviewed. No longer completing interior remodel, work is only new exterior door at storage area.
|
Routing - PLAN CHECK | 8/24/2016 | | 8/29/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 6/30/2016 | 6/30/2016 | 7/5/2016 | | PASS |
Katie Marron
|
|
|
Plan modification to floor plan layout. No changes to report required.
|
Plan assigned to (JG) | 6/8/2016 | 6/8/2016 | 7/5/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 6/21 L2 Treasure Valley IT, pend Fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/5/2016 | | DONE |
|
|
|
NEED GC form
|
Routing - PLAN CHECK | 6/30/2016 | | 7/1/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 6/20/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 6/8/2016 | | 6/20/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - Design Review | 6/8/2016 | | 6/20/2016 | | PASS |
Sarah Schafer
|
|
|
Signed off in ePlan review by Sarah Schafer
|
Routing - FIRE | 6/8/2016 | 6/8/2016 | 6/9/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Intake Approval | | | 6/8/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 6/8/2016 | | 6/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/8/2016 | | 6/8/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 5/25/2016 | | FAIL |
David Ferguson
|
|
|
Modify cover page to include a key plan.
|
Application received | | | 5/24/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 24 2016 3:40PM
|