Permit Information
Permit NumberBLD16-01918
StatusFinaled
Name DULIN SHAWN M
Site Address 1427 E HAYS ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Turn space above existing garage into a bonus room with a storage/closet. Not adding bathroom at this time. The owner/contractor built a deck and stair structure to access the room above the garage without a permit. The work will be performed per the approved plans, stamped engineered drawings and local codes. An electrical permit will be pulled separately. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/18/20175/19/20175/19/2017PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Shawn Dulin
DOC - Permit Finaled5/19/20175/19/20175/19/2017PPASS
DetailsDave Hannah
BLD-Aging Inspection1/11/20171/11/20171/17/2017 PASS
DetailsDave Hannah
BLD-Aging Inspection1/10/20171/10/20171/17/2017 PASS
DetailsDave Hannah
BLD-Other9/21/20169/23/20169/26/2016PPASS
DetailsDave Hannah
BLD-Framing/Rough-in

Electrical rough-in is complete and passed per ELE16-02873
Insulation being installed on Thursday Sept 22 by G;G Insulation.
Phone #: ###-#### Inspection requested via web by Shawn Dulin
BLD-Framing/Rough-in8/24/20168/26/20168/29/2016PPART
DetailsDave Hannah
Shawn Phone #: ###-#### deck ok
BLD-Footing8/1/20168/2/20168/2/2016PPASS
DetailsPhil Shearer
Shawn Phone #: ###-####
PubWorks Subgrade Approval8/1/20168/1/20168/1/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  8/1/2016 DONE
Plan assigned to (DAF)7/27/20167/27/20167/29/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK7/28/2016 7/29/2016 PASS
DetailsDavid Ferguson
Inspection Record Card- Bld  7/29/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  7/29/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  7/29/2016 DONE
Permit Ready to Issue  7/29/2016 DONE
Telephone call  7/29/2016 DONE
called Shawn to let know permit is ready and how much is owed-left message on cell phone
Routing PW Grading-Hillside7/27/2016 7/28/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (BLD)7/27/20167/27/20167/27/2016PDONE
DetailsDavid Ferguson
Routing Walk-In (Zoning)7/27/20167/27/20167/27/2016PPASS
DetailsJeff Lowe
Routing Walk-In (BLD)5/26/20165/26/20165/26/2016AFAIL
DetailsDavid Ferguson
Needs engineering for foundation of illegal deck in the hillside, REScheck, Planning approval for the deck.
1st review completed  5/26/2016 DONE
DetailsDavid Ferguson
Application received 5/26/2016   
Needs to routed as a level 2 due to hillside lot.