BLD-Final | 5/18/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Shawn Dulin
|
DOC - Permit Finaled | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/11/2017 | 1/11/2017 | 1/17/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/10/2017 | 1/10/2017 | 1/17/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 9/21/2016 | 9/23/2016 | 9/26/2016 | P | PASS |
Dave Hannah
|
|
|
BLD-Framing/Rough-in
Electrical rough-in is complete and passed per ELE16-02873 Insulation being installed on Thursday Sept 22 by G;G Insulation. Phone #: ###-#### Inspection requested via web by Shawn Dulin
|
BLD-Framing/Rough-in | 8/24/2016 | 8/26/2016 | 8/29/2016 | P | PART |
Dave Hannah
|
|
|
Shawn Phone #: ###-#### deck ok
|
BLD-Footing | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | PASS |
Phil Shearer
|
|
|
Shawn Phone #: ###-####
|
PubWorks Subgrade Approval | 8/1/2016 | 8/1/2016 | 8/1/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/1/2016 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 7/27/2016 | 7/27/2016 | 7/29/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 7/28/2016 | | 7/29/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 7/29/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/29/2016 | | DONE |
|
|
|
|
Telephone call | | | 7/29/2016 | | DONE |
|
|
|
called Shawn to let know permit is ready and how much is owed-left message on cell phone
|
Routing PW Grading-Hillside | 7/27/2016 | | 7/28/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | DONE |
David Ferguson
|
|
|
|
Routing Walk-In (Zoning) | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 5/26/2016 | 5/26/2016 | 5/26/2016 | A | FAIL |
David Ferguson
|
|
|
Needs engineering for foundation of illegal deck in the hillside, REScheck, Planning approval for the deck.
|
1st review completed | | | 5/26/2016 | | DONE |
David Ferguson
|
|
|
|
Application received | | 5/26/2016 | | | |
|
|
|
Needs to routed as a level 2 due to hillside lot.
|