Third Notice | | 1/16/2017 | 2/9/2017 | | DONE |
|
|
|
This permit finaled on the web by Curtis Weedop
|
Third Notice | | 12/17/2016 | 1/11/2017 | | DONE |
|
|
|
|
Second Notice | | 11/25/2016 | 12/12/2016 | | DONE |
|
|
|
mailed 12-13-16
|
First Notice | 11/4/2016 | 11/4/2016 | 11/15/2016 | | DONE |
Dave Hannah
|
|
|
Mailed 11-16-16
|
BLD-Final | 11/3/2016 | 11/3/2016 | 11/4/2016 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
DOC - Permit Finaled | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 11/3/2016 | 11/3/2016 | 11/3/2016 | P | PASS |
Katie Marron
|
|
|
Fire Life Safety Pass.
|
BLD-Ceiling Grid Inspection | 10/27/2016 | 10/27/2016 | 10/28/2016 | P | PEND |
Dave Hannah
|
|
|
Kelley Phone #: ###-####
|
BLD-Wall cover | 9/20/2016 | 9/20/2016 | 9/21/2016 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
Inspection Record Card- Bld | | | 9/13/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/13/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/27/2016 | 5/27/2016 | 6/27/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) ST LUKE'S NURSE STATION (Jun 16 - 15 days) Level 3 TI - ePlanReview
|
Routing - PLAN CHECK | 6/20/2016 | | 6/27/2016 | | PASS |
Carl Westfall
|
|
|
Drawings approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan resubmittals received | | | 6/20/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/14/2016 | 6/17/2016 | 6/16/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 5/27/2016 | | 6/14/2016 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
1st review completed | | | 6/14/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/14/2016 | | DONE |
|
|
|
|
Routing - FIRE | 5/27/2016 | 5/27/2016 | 6/1/2016 | | PASS |
Scott Arellano
|
|
|
Modifications to the fire sprinkler system and alarm are required and intended. Separate Fire Permits will be required. Work to be completed per NFPA 13 and 72. PDS Fire Inspector to verify a fire extinguisher within 75 feet of TI area. No further comments required.
|
Routing - PLUMBING | 5/27/2016 | | 5/31/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 5/27/2016 | | 5/27/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/27/2016 | | 5/27/2016 | | PASS |
Rachael Beierle
|
|
|
RELOCATING BAR SINK AND ADDING EYEWASH STATION
|
Intake Approval | | | 5/27/2016 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 5/27/2016 | | 5/27/2016 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 5/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 26 2016 9:47AM
|
Intake Approval | | | 5/26/2016 | | FAIL |
Javier Guzman
|
|
|
Per ePlan review submittal standards (submittals that do not meet these minimum requirements will fail our pre-screen review):
• 520 checklist, Forms 302, 304 and 306 must be uploaded as individual sheets in pdf format not as a packet
• Plan drawings must be uploaded as individual sheets in pdf format not as a packet
• For plan drawing files please reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. (plan sheets A3, M0, M1, P1, F1 and E1)
|