Permit Information
Permit NumberBLD16-01991
StatusFinaled
Name RRC CONTRACTORS
Site Address 999 W MAIN ST
Project Name1 Capital Cntr 1st Floor Lobby
Customer Number 
ePlanReviewYes
Description
**(ONE CAPITAL CENTER - 1st FLOOR - MAIN ENTRY LOBBY REMODEL)** This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 2,304 sq. ft. main entry lobby area within a 15 story high rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select door/door frame, removal of select interior nonbearing walls, remove and replace select acoustic suspended ceiling, construction of select interior nonbearing new walls, new light fixtures, electrical work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/21/2018 DONE
Telephone call  11/13/2018 DONE
Spoke with Jack to see if we could get the final values for this project. stated he would do some research and call back on Monday 11/19
Third Notice 9/15/201810/12/2018 DONE
mailed 10-15-18
Third Follow up  10/12/2018 DONE
Third Notice 8/12/20189/10/2018 DONE
mailed 9-11-18 sent 2nd letter
Second Follow up  9/10/2018 DONE
Third Notice 7/15/20188/7/2018 DONE
mailed 8-10-18 sent letter
First Follow up  8/7/2018 DONE
Third Notice 6/16/20187/10/2018 DONE
mailed 7-11-18
Third Notice 5/16/20186/11/2018 DONE
mailed 6-12
Second Notice 4/20/20185/11/2018 DONE
mailed 5-14
First Notice4/5/20184/5/20184/10/2018 DONE
DetailsDave Hannah
mailed 4-11-18
BLD-Final4/5/20184/5/20184/5/2018PPASS
DetailsDave Hannah
Zach Phone #: ###-####
DOC - Permit Finaled4/5/20184/5/20184/5/2018PPASS
DetailsDave Hannah
FIRE-Final Inspection4/5/20184/5/20184/5/2018PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.
BLD-Final4/4/20184/5/20184/5/2018APEND
DetailsDave Hannah
Derek-would like late AM Phone #: ###-#### ok after fire finals
BLD-Ceiling Grid Inspection4/17/20174/17/20174/17/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-####
Issue PAID IN FULL permit  9/15/2016 DONE
Inspection Record Card- Bld  9/15/2016 DONE
Plan assigned to (JG)6/8/20166/8/20166/21/2016 PASS
DetailsJavier Guzman
6/21 L2 First Floor Lobby Remodel
Routing - PLAN CHECK6/8/2016 6/21/2016 PASS
DetailsJavier Guzman
1st review completed  6/21/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/21/2016 DONE
Permit Ready to Issue  6/21/2016 DONE
Need GC Form and Revised Cert of Value
Routing - Design Review6/8/2016 6/9/2016 PASS
DetailsSarah Schafer
New main lobby door and glass system approved through building permit.
Intake Approval  6/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing6/8/2016 6/8/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/8/2016 6/8/2016 PASS
DetailsRachael Beierle
Application received  6/1/2016 DONE
Application submitted via PDS Online on Jun 1 2016 4:25PM