BLD-Aging Inspection | 12/6/2017 | 12/6/2017 | 12/6/2017 | | PASS |
Jim Storey
|
|
|
9/8/17 exp ncfi
|
BLD-Aging Inspection | 12/5/2017 | 12/5/2017 | 12/6/2017 | | PASS |
Jim Storey
|
|
|
9/8/17 exp ncfi
|
DOC - Permit Expired | 12/6/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Jim Storey
|
|
|
9/8/17 exp ncfi
|
BLD-Aging Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | | PASS |
Jim Storey
|
|
|
9/8/17 exp ncfi
|
Issue PAID IN FULL permit | | | 9/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2016 | | DONE |
Christina Prado
|
|
|
***MET*** Need GC Form & Revised Certificate of value for issuance
|
Plan assigned to (JG) | 7/12/2016 | 7/12/2016 | 7/15/2016 | | PASS |
Javier Guzman
|
|
|
7/18 L1 BOI Train Depot ePlan
|
Routing - PLAN CHECK | 7/12/2016 | | 7/15/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/15/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/12/2016 | | PASS |
|
|
|
|
Routing - PLANNING | 7/12/2016 | | 7/12/2016 | | PASS |
Celine Acord
|
|
|
|
Intake Approval | | | 6/6/2016 | | FAIL |
David Ferguson
|
|
|
1) A completed #518 Checklist.
2) A completed #304 Registered Design Professional form.
3) The plan sheets have been uploaded vertically. Please upload them horizontally.
4) Use the proper naming convention for each large plan sheet. Use the Sheet Index located on the cover page as your guide.
5) Provide a Zoning Certificate from our Zoning Department showing approval for this work.
6) Upload all of the engineering pages into one folder and not individually as you have done.
7) Provide engineering calcs for the tower capacity.
|
Application received | | | 6/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2016 3:45PM
|