Print Statement | | | 9/27/2017 | | DONE |
|
|
|
|
First Notice | | 8/13/2017 | 9/19/2017 | | DONE |
|
|
|
Mailed 9-20-17
|
BLD-Final | 8/2/2017 | 8/3/2017 | 8/3/2017 | P | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Ok for perm occ.
|
Zoning Approval | 8/3/2017 | 8/3/2017 | 8/3/2017 | | PASS |
Sarah Schafer
|
|
|
|
Permanent Occupancy | | | 8/3/2017 | | DONE |
|
|
|
|
BLD-Final | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | NR |
Mike Jordan
|
|
|
Rob Phone #: ###-####. Needs zoning final first.
|
FIRE-Supply Line Hydro | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 7/21/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
PubWorks Occupancy Approval | 7/20/2017 | 7/20/2017 | 7/20/2017 | | DONE |
Tiffany Lowery
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/5/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 4/19/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 4/14/2017 | 4/14/2017 | 4/19/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/17/2017 | | 4/19/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
process change for PW only not buidling review
|
Permit Ready to Issue | | | 4/19/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
Routing - PUBLIC WORKS | 4/17/2017 | | 4/17/2017 | | PASS |
Rachael Beierle
|
|
|
Modifications to the seapage bed
|
Routing PW Drainage | 4/17/2017 | | 4/17/2017 | | PASS |
Brian Murphy
|
|
|
Mod for new seepage beds.
|
Plan Modification Accepted | | | 4/14/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to relocate previously approved drain field
|
BLD-Energy code compliance | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 3/15/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Roof ok.
|
BLD-Conference | 1/25/2017 | 1/27/2017 | 1/27/2017 | A | DONE |
Mike Jordan
|
|
|
Bill Phone #: ###-#### reviewed all special inspection reports to date for concrete, reinforcement, soils and geo-grid. Also discussed bolting inspection moving foward.
|
BLD-Footing | 1/13/2017 | 1/17/2017 | 1/17/2017 | A | CANC |
Mike Jordan
|
|
|
Request call ahead for access, for rebar/footings - Bill Phone #: ###-####
|
Plan Reviewer's activity | | | 1/13/2017 | | DONE |
Jason Blais
|
|
|
Received engineer letter from ABCO and Allwest special inspection testing for subgrade, placement of geogrid reinforcement, and compaction of structural fill. To be uploaded into the ePlanReview case for record.
|
Plan Reviewer's activity | | | 1/4/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
recieved revised detail for pouring method due to weather stamped by engineer.
. They are just changing from a monolithic pour to a separate pour on the footing as shown in the detail to be able to better work in these weather conditions.
|
BLD-Footing | 12/14/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Mike Jordan
|
|
|
rebar - Bill Phone #: ###-####. Will have special inspection. Stemwalls covered with blankets, will have supplemental heat after placement. Appears that cold weather conc. standards being followed.
|
BLD-Foundation | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####. footings are constructed. No one no approved plans on site. Called Bill and left message. Appears that footing subgrade may be frozen.
|
OVERRIDE | | | 12/7/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 12/6/2016 | 12/6/2016 | 12/7/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/6/2016 | | 12/7/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
change to geo tech see uploaded documents. emailed all correspondence to engineer and uploaded into e plan system.
|
Routing Off Site - STRUCTURAL | 12/6/2016 | | 12/7/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
No structural review required based on confirmation of geotech engineer of record that the original allowable bearing pressures remain the same. signed off in e plan
|
Routing PW Drainage | 12/6/2016 | | 12/7/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Permit Ready to Issue | | | 12/7/2016 | | DONE |
|
|
|
please do not re issue
|
CHANGE STATUS TO (ISS) | | | 12/7/2016 | | DONE |
|
|
|
plan mod fees paid
|
Plan Modification Accepted | | | 12/6/2016 | | DONE |
Christina Prado
|
|
|
Plan Modification to update existing GeoTech report
|
BLD-Footing | 12/1/2016 | 12/5/2016 | 12/5/2016 | P | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####. Needs to resubmit plan mod for engineering on changes to foundation system. Called Bill to advise him.
|
Print Occupancy Form | | | 10/11/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/11/2016 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 8/24/2016 | 8/24/2016 | 10/5/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Aerial Building Addition 1st review completed by Tim
|
Routing PW Drainage | 10/3/2016 | | 10/5/2016 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2016 | | DONE |
|
|
|
need ACHD, RP, GC and rev cert of val
|
Routing PW Drainage | 9/16/2016 | | 9/21/2016 | | FAIL |
|
|
|
NEE NEW DRAINAGE PLAN ORIGINAL APDX J
|
Routing Off Site - STRUCTURAL | 9/16/2016 | | 9/20/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (TLW) | 6/7/2016 | | 8/24/2016 | | DEFR |
Tim L. Woodard
|
|
|
1st review completed.
|
Meeting | | | 8/12/2016 | | DONE |
|
|
|
Bill Meier came in and spoke with Brian Murphy. Brian Murphy has the appendix J in his office
|
Routing Off Site - STRUCTURAL | 8/1/2016 | | 8/10/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/1/2016 | | 8/10/2016 | | PASS |
Tim L. Woodard
|
|
|
signed off in e plan
|
Routing PW Drainage | 8/1/2016 | | 8/9/2016 | | FAIL |
Brian Murphy
|
|
|
NEED JIM W. OK APDX J ECT
|
Plan resubmittals received | | | 8/2/2016 | | DONE |
|
|
|
received storm drainage calculations
|
Routing - FIRE | 8/1/2016 | 8/1/2016 | 8/1/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Plan resubmittals received | | | 8/1/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/9/2016 | 7/12/2016 | 7/11/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 7/8/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/7/2016 | | 7/8/2016 | | PASS |
Evan Jenkins
|
|
|
Approved in E-Plan. TLW
|
Routing Off Site - STRUCTURAL | 6/7/2016 | | 7/8/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/7/2016 | | 7/8/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 6/7/2016 | | 7/8/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-plan. TLW
|
Routing PW Drainage | 6/7/2016 | | 6/21/2016 | | FAIL |
Brian Murphy
|
|
|
change to seepage beds o and m agreement bgeotech
|
Routing - MECHANICAL | 6/21/2016 | | 6/21/2016 | | PASS |
Troy James
|
|
|
Building is not being heating at this time per owner. No mechanical to review.
|
Routing - MECHANICAL | 6/7/2016 | | 6/15/2016 | | FAIL |
Troy James
|
|
|
Spoke Jerrod Wallgren about no heating design shown on plans. Waiting for response on how and if building is being heated.
|
Routing - Design Review | 6/7/2016 | | 6/10/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 6/7/2016 | 6/7/2016 | 6/9/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Intake Approval | | | 6/7/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/7/2016 | | 6/7/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 6/7/2016 | | 6/7/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/7/2016 | | 6/7/2016 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 6/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2016 12:34PM
|