BLD-Conference | 5/10/2017 | 5/12/2017 | 5/12/2017 | A | PEND |
Brandon Shaw
|
|
|
Conference with home/permit holder. Needs to get all Geotechs reports and have copies submitted with permit, OK to final after review of reports.
|
BLD-Aging Inspection | 5/2/2017 | 5/2/2017 | 5/10/2017 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Foundation | 5/8/2017 | 5/11/2017 | 5/10/2017 | A | CANC |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 7/13/2016 | 7/13/2016 | 7/13/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall subgrade abd construction is acceptable has been received by Public Works. Jason Taylor ###-####.
|
OVERRIDE | | | 6/17/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/17/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Celine Acord
|
|
|
approved. see attached photos for 'fence' height within side setback
|
Plan assigned to (DAF) | 6/6/2016 | 6/6/2016 | 6/17/2016 | | DONE |
David Ferguson
|
|
|
due 6/13 L2 hillside - held up by Jason T. and may go out for 3rd party review. Also, Andy Long signed off on my task so it wasn't on my task list.
|
Routing - PLAN CHECK | | | 6/17/2016 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 6/17/2016 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 6/17/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2016 | | DONE |
David Ferguson
|
|
|
|
Permit Ready to Issue | | | 6/17/2016 | | DONE |
|
|
|
MET
|
Telephone call | | | 6/17/2016 | | DONE |
|
|
|
called Darin to let know permit is ready and how much is owed-left message on phone
|
Issue PAID IN FULL permit | | | 6/17/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/6/2016 | 6/6/2016 | 6/15/2016 | A | DONE |
Celine Acord
|
|
|
needs further review
|
Routing - Erosion and Sediment | 6/14/2016 | | 6/15/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Homeowner RP. Contractor has training, no cert. Darin ###-####.
|
Routing PW Grading-Hillside | 6/14/2016 | | 6/14/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the final wall construction is approvede must be submitted to Public Works prior to scheduling a final inspection. Call Jason Taylor at ###-####
|
Intake Approval | | | 6/6/2016 | | PASS |
|
|
|
as per Jason Taylor; needs further review
|
Application received | | 6/6/2016 | | | |
|
|
|
|