Permit Information
Permit NumberBLD16-02039
StatusIssued
Name WAITE BONNIE KIM
Site Address 3247 E BIRDSONG CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Retaining walls located in the hillside district. Work will be performed per the approved plans, stamped engineering and local codes. **DAF** A letter from the applicant’s geotechnical engineer indicating that the final wall construction is approvede must be submitted to Public Works prior to scheduling a final inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference5/10/20175/12/20175/12/2017APEND
DetailsBrandon Shaw
Conference with home/permit holder. Needs to get all Geotechs reports and have copies submitted with permit, OK to final after review of reports.
BLD-Aging Inspection5/2/20175/2/20175/10/2017 CANC
DetailsBrandon Shaw
BLD-Foundation5/8/20175/11/20175/10/2017ACANC
DetailsBrandon Shaw
PubWorks Occupancy Approval7/13/20167/13/20167/13/2016 DONE
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the retaining wall subgrade abd construction is acceptable has been received by Public Works. Jason Taylor ###-####.
OVERRIDE  6/17/2016  
Routing Walk-In (Zoning)6/17/20166/17/20166/17/2016APASS
DetailsCeline Acord
approved. see attached photos for 'fence' height within side setback
Plan assigned to (DAF)6/6/20166/6/20166/17/2016 DONE
DetailsDavid Ferguson
due 6/13 L2 hillside - held up by Jason T. and may go out for 3rd party review. Also, Andy Long signed off on my task so it wasn't on my task list.
Routing - PLAN CHECK  6/17/2016 PASS
DetailsDavid Ferguson
1st review completed  6/17/2016 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  6/17/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  6/17/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  6/17/2016 DONE
DetailsDavid Ferguson
Permit Ready to Issue  6/17/2016 DONE
MET
Telephone call  6/17/2016 DONE
called Darin to let know permit is ready and how much is owed-left message on phone
Issue PAID IN FULL permit  6/17/2016 DONE
Routing Walk-In (Zoning)6/6/20166/6/20166/15/2016ADONE
DetailsCeline Acord
needs further review
Routing - Erosion and Sediment6/14/2016 6/15/2016 PASS
DetailsAndy J. Long
ESC plan submitted and approved. Homeowner RP. Contractor has training, no cert. Darin ###-####.
Routing PW Grading-Hillside6/14/2016 6/14/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the final wall construction is approvede must be submitted to Public Works prior to scheduling a final inspection. Call Jason Taylor at ###-####
Intake Approval  6/6/2016 PASS
as per Jason Taylor; needs further review
Application received 6/6/2016