Permit Information
Permit NumberBLD16-02075
StatusFinaled
Name K2 CONSTRUCTION
Site Address 833 W DIAMOND ST
Project NameECCO Expansion
Customer Number 
ePlanReviewYes
Description
(ECCO) PLAN MODIFICATION FOR THE RELOCATION OF THE SITE ENTRY GATE. Permit for the construction of a 41,021 sq. ft. prefabricated Butler steel building addition to an existing 49,563 sq. ft. type VB building with work to include site grading and drainage and site utilities as well as general site improvements. All work per the approved plans and the attached engineering. This building will be fully fire sprinklered for unlimited area. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/15/2017 DONE
First Notice 4/24/20175/10/2017 DONE
Mailed 5-11
BLD-Final4/13/20174/14/20174/14/2017PPASS
DetailsJim Storey
Ty Phone #: ###-####
Zoning Approval4/14/20174/14/20174/14/2017 PASS
DetailsSarah Schafer
BND16-00131 can be released.
Permanent Occupancy  4/14/2017 DONE
DetailsChristina Prado
BLD-Final4/12/20174/13/20174/13/2017PCANC
DetailsJim Storey
Todd Phone #: ###-####
FIRE-Final Inspection4/12/20174/13/20174/13/2017APASS
DetailsJim Page
Life fire safety passed/complete.
Temporary Occupancy4/10/20177/9/20174/10/2017 DONE
DetailsCandy A. Nichols
as per Jason B-ok to extend Temp C of O to July 4th 2017
Telephone call  4/6/2017 DONE
called Robert to let know temp c of o expired yesterday and he will need to call in the final or request an extension
BLD-Aging Inspection3/7/20173/7/20173/7/2017 PASS
DetailsJim Storey
final ok pending others
Temporary Occupancy1/6/20174/6/20171/6/2017 DONE
DetailsCandy A. Nichols
Zoning Approval Temp1/6/20171/6/20171/6/2017 PASS
DetailsJosh Wilson
180 day temp occ. Bond in place for landscaping. BND16-00131
BLD-Final1/4/20171/5/20171/5/2017APART
DetailsJim Storey
julio Phone #: ###-#### temp ok pending others/ si letter/ ada tank flush handle
FIRE-Final Inspection1/5/20171/5/20171/5/2017PPART
DetailsJim Page
Partial life fire safety inspection complete, final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place, fire extinguisher are in place with current inspection tags. Building inspector approved TCO at completion of life fire safety (Items for TCO for life safety complete). A final life fire safety inspection will need to be performed before final occupancy, items that need to be verified for final inspection: final sign off for racking permit BLD16-03887, verify completion of comment 21 under storage issues on the fire plan review comments and fire department access when site work is complete.
PubWorks Temp Occupancy Appr12/21/201612/21/201612/21/2016 DONE
DetailsTiffany Lowery
BLD-Other12/7/201612/7/201612/7/2016PPASS
DetailsJim Storey
Julilo-one hour wall barrier Phone #: ###-#### gyp ok south wall
FIRE-Conference11/29/201611/29/201611/29/2016PDONE
DetailsKatie Marron
Emailed with Contractor to clarify fire extinguisher requirements. Explained that either eleven 4-A or twenty-two 2-A are required.
BLD-Conference11/9/201611/16/201611/16/2016PPART
DetailsJim Storey
Julio Phone #: ###-####
FIRE-Conference11/14/201611/16/201611/16/2016ACANC
DetailsJim Page
Recieved a voicemail from Julio Phone #: ###-#### at 10:48am, tried calling back at 10:56am, no answer, left a voicemail stating that I was on my to job site, checked job shack that is site and no one is in job shack, attempted to call again at 11:07am, called again at 11:15am and left a message stating that if no response was made within 10 minutes then this conference will need to be rescheduled. Nothing was recieved by 11:25am so I proceededto my next inspection, this conference is cancelled and a new conference will need to be requested.
BLD-Framing/Rough-in11/9/201611/10/201611/10/2016PPART
DetailsMike Jordan
would like call ahead; Julio Phone #: ###-####. steel stud ceilings for office and restrooms.
(F) Reprint permit  10/19/2016  
CHANGE STATUS TO (ISS)  10/19/2016 DONE
OVERRIDE  10/18/2016  
Plan assigned to (CDM)10/10/201610/10/201610/18/2016 PASS
DetailsCarl D Madsen
Routing - Design Review10/14/2016 10/18/2016 PASS
DetailsJosh Wilson
PLANS/APPL TAKEN TO FRONT DESK  10/18/2016 DONE
Permit Ready to Issue  10/18/2016 DONE
DO NOT RE-ISSUE - plan mod ONLY
Routing - PLAN CHECK10/10/2016 10/17/2016 PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS10/14/2016 10/17/2016 PASS
DetailsRachael Beierle
Routing - FIRE10/14/201610/14/201610/14/2016 PASS
DetailsKatie Marron
Plan mod reviewed. No change to report required.
Routing PW Drainage10/14/2016 10/14/2016 PASS
DetailsBrian Murphy
Plan Modification Accepted  10/10/2016 DONE
started plan mod for Ron Hill-assigned to Carl M
BLD-Footing8/11/20168/11/20168/11/2016PPASS
DetailsJim Storey
Jeremy Phone #: ###-#### w si
OVERRIDE  7/19/2016  
Plan assigned to (CDM)6/14/20166/14/20167/19/2016 PASS
DetailsCarl D Madsen
First review completed
Routing PW Drainage6/14/2016 7/19/2016 PASS
DetailsBrian Murphy
Issue PAID IN FULL permit  7/19/2016 DONE
Print Occupancy Form  7/19/2016 DONE
Routing Off Site - STRUCTURAL7/12/2016 7/19/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/19/2016 DONE
Permit Ready to Issue  7/19/2016 DONE
***MET*** Needs; ACHD approval, RP, GC Form, Revised Cert of Value
Routing - PLAN CHECK7/12/2016 7/19/2016 PASS
DetailsCarl D Madsen
Routing - FIRE7/12/20167/12/20167/12/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Route to Impact Fee Review7/11/20167/14/20167/11/2016 PASS
DetailsCindy M. Gould
1st review completed  7/11/2016 FAIL
Routing Off Site - STRUCTURAL6/14/2016 7/11/2016 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK6/14/2016 7/11/2016 FAIL
DetailsCarl D Madsen
Routing PW Environmental6/14/2016 6/27/2016 PASS
DetailsRick Christenson
Routing PW Solid Waste6/14/2016 6/24/2016 PASS
DetailsPeter J. McCullough
Gates to trash enclosure must open 120 degrees minimum
Routing - Design Review6/14/2016 6/23/2016 PASS
DetailsJosh Wilson
Routing - MECHANICAL6/14/2016 6/17/2016 PASS
DetailsTroy James
Routing - PLUMBING6/14/2016 6/17/2016 PASS
DetailsDaryl Spivey
1) mount rp over drain
2) asse 1070 mixing valve at lavs
Routing - PLANNING Land Div6/14/2016 6/17/2016 PASS
DetailsTodd Tucker
Routing - FIRE6/14/20166/14/20166/15/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing - Erosion and Sediment6/14/2016 6/15/2016 PASS
DetailsAndy J. Long
ESC plan and site BMP map approved. Valid Plan Designer, need to designated valid RP from K2 Construction. Site preparation inspection required.
Routing PW Street Lights6/14/2016 6/14/2016 PASS
DetailsTom Marshall
Routing - Addressing6/14/2016 6/14/2016 PASS
DetailsLaura Hunter
Can use same address, unless new wharehouse will be occupied by different company.
Routing - PUBLIC WORKS6/14/2016 6/14/2016 PASS
DetailsRachael Beierle
Pending Assignment by TLW6/14/2016 6/14/2016 DONE
DetailsTim L. Woodard
Intake Approval  6/10/2016 PASS
Plan Reviewer's activity  6/9/2016 PASS
DetailsCarl Westfall
Plan intake review approved
Application received  6/7/2016 DONE
Application submitted via PDS Online on Jun 7 2016 2:07PM