Print Statement | | | 5/15/2017 | | DONE |
|
|
|
|
First Notice | | 4/24/2017 | 5/10/2017 | | DONE |
|
|
|
Mailed 5-11
|
BLD-Final | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Jim Storey
|
|
|
Ty Phone #: ###-####
|
Zoning Approval | 4/14/2017 | 4/14/2017 | 4/14/2017 | | PASS |
Sarah Schafer
|
|
|
BND16-00131 can be released.
|
Permanent Occupancy | | | 4/14/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/12/2017 | 4/13/2017 | 4/13/2017 | P | CANC |
Jim Storey
|
|
|
Todd Phone #: ###-####
|
FIRE-Final Inspection | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete.
|
Temporary Occupancy | 4/10/2017 | 7/9/2017 | 4/10/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B-ok to extend Temp C of O to July 4th 2017
|
Telephone call | | | 4/6/2017 | | DONE |
|
|
|
called Robert to let know temp c of o expired yesterday and he will need to call in the final or request an extension
|
BLD-Aging Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | | PASS |
Jim Storey
|
|
|
final ok pending others
|
Temporary Occupancy | 1/6/2017 | 4/6/2017 | 1/6/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Zoning Approval Temp | 1/6/2017 | 1/6/2017 | 1/6/2017 | | PASS |
Josh Wilson
|
|
|
180 day temp occ. Bond in place for landscaping. BND16-00131
|
BLD-Final | 1/4/2017 | 1/5/2017 | 1/5/2017 | A | PART |
Jim Storey
|
|
|
julio Phone #: ###-#### temp ok pending others/ si letter/ ada tank flush handle
|
FIRE-Final Inspection | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | PART |
Jim Page
|
|
|
Partial life fire safety inspection complete, final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place, fire extinguisher are in place with current inspection tags. Building inspector approved TCO at completion of life fire safety (Items for TCO for life safety complete). A final life fire safety inspection will need to be performed before final occupancy, items that need to be verified for final inspection: final sign off for racking permit BLD16-03887, verify completion of comment 21 under storage issues on the fire plan review comments and fire department access when site work is complete.
|
PubWorks Temp Occupancy Appr | 12/21/2016 | 12/21/2016 | 12/21/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Other | 12/7/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Jim Storey
|
|
|
Julilo-one hour wall barrier Phone #: ###-#### gyp ok south wall
|
FIRE-Conference | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | DONE |
Katie Marron
|
|
|
Emailed with Contractor to clarify fire extinguisher requirements. Explained that either eleven 4-A or twenty-two 2-A are required.
|
BLD-Conference | 11/9/2016 | 11/16/2016 | 11/16/2016 | P | PART |
Jim Storey
|
|
|
Julio Phone #: ###-####
|
FIRE-Conference | 11/14/2016 | 11/16/2016 | 11/16/2016 | A | CANC |
Jim Page
|
|
|
Recieved a voicemail from Julio Phone #: ###-#### at 10:48am, tried calling back at 10:56am, no answer, left a voicemail stating that I was on my to job site, checked job shack that is site and no one is in job shack, attempted to call again at 11:07am, called again at 11:15am and left a message stating that if no response was made within 10 minutes then this conference will need to be rescheduled. Nothing was recieved by 11:25am so I proceededto my next inspection, this conference is cancelled and a new conference will need to be requested.
|
BLD-Framing/Rough-in | 11/9/2016 | 11/10/2016 | 11/10/2016 | P | PART |
Mike Jordan
|
|
|
would like call ahead; Julio Phone #: ###-####. steel stud ceilings for office and restrooms.
|
(F) Reprint permit | | | 10/19/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/19/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/18/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 10/10/2016 | 10/10/2016 | 10/18/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 10/14/2016 | | 10/18/2016 | | PASS |
Josh Wilson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/18/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE - plan mod ONLY
|
Routing - PLAN CHECK | 10/10/2016 | | 10/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 10/14/2016 | | 10/17/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 10/14/2016 | 10/14/2016 | 10/14/2016 | | PASS |
Katie Marron
|
|
|
Plan mod reviewed. No change to report required.
|
Routing PW Drainage | 10/14/2016 | | 10/14/2016 | | PASS |
Brian Murphy
|
|
|
|
Plan Modification Accepted | | | 10/10/2016 | | DONE |
|
|
|
started plan mod for Ron Hill-assigned to Carl M
|
BLD-Footing | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Jim Storey
|
|
|
Jeremy Phone #: ###-#### w si
|
OVERRIDE | | | 7/19/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 6/14/2016 | 6/14/2016 | 7/19/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing PW Drainage | 6/14/2016 | | 7/19/2016 | | PASS |
Brian Murphy
|
|
|
|
Issue PAID IN FULL permit | | | 7/19/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/19/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/12/2016 | | 7/19/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/19/2016 | | DONE |
|
|
|
***MET*** Needs; ACHD approval, RP, GC Form, Revised Cert of Value
|
Routing - PLAN CHECK | 7/12/2016 | | 7/19/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 7/12/2016 | 7/12/2016 | 7/12/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Route to Impact Fee Review | 7/11/2016 | 7/14/2016 | 7/11/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 7/11/2016 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/14/2016 | | 7/11/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/14/2016 | | 7/11/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Environmental | 6/14/2016 | | 6/27/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Solid Waste | 6/14/2016 | | 6/24/2016 | | PASS |
Peter J. McCullough
|
|
|
Gates to trash enclosure must open 120 degrees minimum
|
Routing - Design Review | 6/14/2016 | | 6/23/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 6/14/2016 | | 6/17/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 6/14/2016 | | 6/17/2016 | | PASS |
Daryl Spivey
|
|
|
1) mount rp over drain
2) asse 1070 mixing valve at lavs
|
Routing - PLANNING Land Div | 6/14/2016 | | 6/17/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 6/14/2016 | 6/14/2016 | 6/15/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 6/14/2016 | | 6/15/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan and site BMP map approved. Valid Plan Designer, need to designated valid RP from K2 Construction. Site preparation inspection required.
|
Routing PW Street Lights | 6/14/2016 | | 6/14/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 6/14/2016 | | 6/14/2016 | | PASS |
Laura Hunter
|
|
|
Can use same address, unless new wharehouse will be occupied by different company.
|
Routing - PUBLIC WORKS | 6/14/2016 | | 6/14/2016 | | PASS |
Rachael Beierle
|
|
|
|
Pending Assignment by TLW | 6/14/2016 | | 6/14/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 6/10/2016 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/9/2016 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Application received | | | 6/7/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2016 2:07PM
|