PubWorks Occupancy Approval | 6/6/2017 | 6/6/2017 | 6/6/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Letter of compliance/Occupancy | | | 6/2/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/2/2017 | | DONE |
|
|
|
per Diane's request-i emailed her the C of O
|
BLD-Final | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | DONE |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 1/23/2017 | 1/23/2017 | 1/23/2017 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
DOC - Permit Finaled | | | 1/23/2017 | | DONE |
|
|
|
per Bob Archibald- okay to final- bond was placed for grading and revegetation BND17-00007// KRS
|
Letter of compliance/Occupancy | | | 1/23/2017 | | DONE |
|
|
|
|
BLD-Conference | 1/18/2017 | 1/19/2017 | 1/19/2017 | P | PART |
Tony Young
|
|
|
Building inspection- final, consulation Phone #: ###-#### Inspection requested via web by John Johnston,, needs hillside ,, fire caulking,, front cover finished,, soffit
|
BLD-Conference | 1/17/2017 | 1/18/2017 | 1/18/2017 | P | PEND |
Tony Young
|
|
|
Building inspection- final, consulation Phone #: ###-#### Inspection requested via web by John Johnston,, ?s
|
BLD-Energy code compliance | 9/23/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Tony Young
|
|
|
Insulation // John Phone #: ###-####
|
Plan Modification Accepted | | | 9/20/2016 | | PASS |
Tisha Gallop
|
|
|
Plan modification per phone call with contractor John Johnston to change fire-rated eave to 3/4" cement stucco or (1) layer 5/8" Type X gypsum board with 1/2" cement stucco exterior. Ok'd by Ron Johnson, Asst. Fire Marshal.
|
Routing - PLAN CHECK | 9/20/2016 | | 9/20/2016 | | PASS |
Tisha Gallop
|
|
|
Redlined detail sheet with new soffit construction and re-batch stamped. Told contractor to print out new sheet 7.
|
CHANGE STATUS TO (ISS) | | | 9/20/2016 | | DONE |
|
|
|
minor plan mod approved, not fees
|
BLD-Framing/Rough-in | 9/12/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by John Johnston
|
BLD-Wall Bracing | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####,, work in progress
|
Plan Modification Accepted | | | 9/8/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 9/8/2016 | | 9/8/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 7/27/2016 | 7/28/2016 | 7/28/2016 | P | PART |
Tony Young
|
|
|
Elvaro Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Tony Young
|
|
|
As early as possible Phone #: 9656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Conference | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | CANC |
Mike Jordan
|
|
|
As early as possible Phone #: 9656103 >> Inspection requested via mobile web by Alvaro. Inspection was cancelled and moved to tomorrow in the am.
|
PubWorks Subgrade Approval | 7/18/2016 | 7/18/2016 | 7/18/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/6/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/29/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 6/13/2016 | 6/13/2016 | 6/29/2016 | | DONE |
Brian McGowan
|
|
|
due 6/29 L2 hillside
|
1st review completed | | | 6/29/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/29/2016 | | DONE |
|
|
|
Needs; Responsible Person
|
Routing - PLAN CHECK | 6/9/2016 | | 6/29/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 6/9/2016 | | 6/17/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 6/9/2016 | | 6/14/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/9/2016 | | 6/13/2016 | | PASS |
Ted Vanegas
|
|
|
CFH16-00024
|
Plan assigned to (LEG) Tisha | 6/9/2016 | | 6/13/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - FIRE | 6/9/2016 | 6/9/2016 | 6/10/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD Access and water availability. No comments required.
|
Plans ACCEPTED BY PLAN TECH | | | 6/9/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/9/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/9/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 6/9/2016 | | 6/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/9/2016 | | 6/9/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/9/2016 | | 6/9/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Valid RP and PD designated. ESC site preparation inspection is required.
|
Application received | | | 6/7/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2016 10:09PM
|