BLD-Aging Inspection | 4/19/2017 | 4/19/2017 | 4/24/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/18/2017 | 4/18/2017 | 4/19/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 12/2/2016 | 12/5/2016 | 12/5/2016 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/22/2016 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 6/10/2016 | 6/10/2016 | 11/21/2016 | | DONE |
David Ferguson
|
|
|
due 6/17 - Need engineering from Idaho engineer for foundation in hillside.
|
Routing - PLAN CHECK | 11/21/2016 | | 11/21/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 11/21/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/21/2016 | | DONE |
|
|
|
NEED GC form
|
Inspection Record Card- Bld | | | 11/21/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/21/2016 | | DONE |
|
|
|
called Jeff- let him know permit is ready and fees due. Also told him that we need GC form from Julie
|
Routing - PLAN CHECK | | | 10/31/2016 | | FAIL |
David Ferguson
|
|
|
resubmittal on 10/25/16 for engineered foundation. Spoke to Jeff the homeowner to ask for construction details for the pergola and how he's going to comply with WUI.
|
Plan resubmittals received | | | 10/25/2016 | | DONE |
|
|
|
received 3 copies of structural calculations as well as 2 copies of footing drawings and 2 copies of foundation drawings- gave to Dave
|
1st review completed | | | 6/17/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 6/17/2016 | | 6/17/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - Erosion and Sediment | | | 6/17/2016 | | PASS |
Evan Jenkins
|
|
|
Minimal earth disturbance therefore no ESC permit required.
|
Routing PW Grading-Hillside | 6/10/2016 | | 6/13/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | FAIL |
David Ferguson
|
|
|
May need engineering for the foundation because in hillside even though Javier may have said to him that it wasn't needed.
|
Routing Walk-In (Zoning) | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | FAIL |
Javier Guzman
|
|
|
Hillside home requiring engineering for new footings and possible latral for pergola patio cover
|
1st review completed | | | 6/8/2016 | | FAIL |
Javier Guzman
|
|
|
|
Application received | | 6/8/2016 | | | |
|
|
|
|