Meeting | | | 4/26/2018 | | DONE |
|
|
|
after talking with the GC Ken Nunn-he said there was no mech work that the 250000.00 was for the replacement of the belts in the luggae area. Jim Story signed off on the final with no mech as well. As per Rita ok to complete the final values
|
Second Notice | | 3/23/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
First Notice | 3/7/2018 | 3/7/2018 | 3/13/2018 | | DONE |
Jim Storey
|
|
|
Mailed 3-14-18
|
BLD-Final | 3/6/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Jim Storey
|
|
|
Call for escort - Ken Phone #: ###-####
|
DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Other | 12/14/2017 | 12/18/2017 | 12/18/2017 | A | FAIL |
Jim Storey
|
|
|
Fire proofing // Ken Phone #: ###-#### ele conduit blocking covrage of fire prooffing/ patches needed// si required need reports/ handrails required both exit stairs.
|
BLD-Aging Inspection | 8/25/2017 | 8/25/2017 | 8/25/2017 | | NR |
Jim Storey
|
|
|
ncfi exp 101017
|
Plan assigned to (AJS) | 10/20/2016 | 10/20/2016 | 11/14/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 11/10/2016 | | 11/14/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 11/14/2016 | | 11/14/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
deferred strucutral items passed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2016 | | DONE |
|
|
|
PLAN MOD- DO NOT RE-ISSUE
|
CHANGE STATUS TO (ISS) | | | 11/14/2016 | | DONE |
Christina Prado
|
|
|
Deferred submittals approved
|
Pending Assignment by AJS | 10/11/2016 | | 11/14/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 11/4/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
deleted all new drawings submitted that did not version, emailed applicant.
|
Routing Off Site - STRUCTURAL | 10/20/2016 | | 10/27/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/20/2016 | | 10/27/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending structural review
|
Routing - FIRE | 10/20/2016 | 10/20/2016 | 10/20/2016 | | PASS |
Katie Marron
|
|
|
Plan Mod to take push part of the system to a deferred submittal for additional review. No report required, previous sign off comments still apply.
|
Plan Modification Accepted | | | 10/11/2016 | | DONE |
|
|
|
plan mod accepted in e plan review
|
Issue PAID IN FULL permit | | | 10/10/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/10/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2016 | | DONE |
|
|
|
|
Routing - FIRE | | 9/21/2016 | 10/5/2016 | | PASS |
Scott Arellano
|
|
|
No separate report attached. Final approval will be subject to verification of existing basic life safety devices (i.e. Fire extinguisher locations, egress lighting, exit signs etc.) by the PD/fire inspector. Separate permits will be required for any modifications to the existing fire protection systems in the airport building.
|
Plan assigned to (AJS) | 8/29/2016 | 8/29/2016 | 10/5/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
BOI Baggage claim
|
Routing - PLAN CHECK | 9/21/2016 | | 10/5/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 9/21/2016 | | 10/5/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2016 | | DONE |
|
|
|
***MET***NEED GC form and certificate of value
|
Plan Reviewer's activity | | | 9/20/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
called Ken as the sheets uploaded for re submittal were not versioned nor names similar. He is emailing me a list of drawigns to delete.
|
Routing - PLAN CHECK | 8/29/2016 | | 8/29/2016 | | FAIL |
Tim L. Woodard
|
|
|
Tim did not route as to many items were missing. Please address the change marks and send back for review.
|
Intake Approval | | | 8/29/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
approved by Dave 6/27/16
|
1st review completed | | | 8/29/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 8/26/2016 | 7/11/2016 | 8/26/2016 | | FAIL |
Katie Marron
|
|
|
Failed intake approval by IBC plan reviewer. However, assigned to FIRE in eplan review.
|
Intake Approval | | | 6/13/2016 | | FAIL |
David Ferguson
|
|
|
1) Submit a completed #518 Minor Tenant Improvement Checklist
2) Submit a completed #304 Registered Design Professional form
3) Follow the proper naming convention when upload each plan sheet. All sheets have been deleted so that you can upload them again using the proper format. The names on the sheets are typically taken off of the Table of Contents or Sheet Index located on the cover page of the plans.
4) Minimum plan sheet size is 18x24. You have plan sheets that are smaller than that.
|
Application received | | | 6/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2016 7:46AM
|