Case Summary (BLD) | | | 7/27/2016 | | DONE |
|
|
|
|
BLD-Final | 6/22/2016 | 6/22/2016 | 6/23/2016 | P | PASS |
Phil Shearer
|
|
|
Dave-would like as early as possible and can you call to meet Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Phil Shearer
|
|
|
|
Routing Walk-In (Zoning) | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | CANC |
Colleen T Carroll
|
|
|
historic property, All interior. Not needed
|
Routing Walk-In (BLD) | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 6/9/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/9/2016 | | 6/9/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/9/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/9/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 6/9/2016 | | DONE |
|
|
|
|
Application received | | 6/9/2016 | | | |
|
|
|
|