Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-02122
StatusFinaled
Name DENNIS L PARROTT
Site Address 7802 W GODDARD RD
Project NamePesto's Pizza Shop
Customer Number 
ePlanReviewYes
Description
(PESTO’S PIZZA SHOP) **PLAN MODIFICATION FOR MECHANICAL EQUIPMENT** 11-16-16 AJSPermit to remodel an existing 620 square foot coffee shop into a drive thru pizza company. Note: originally a new structure was going to be constructed with this permit; however, that part of the project has been deferred unitl a later date. This building is not fire sprinklered. Scope of work includes: new electrical, new plumbing, new mechanical, new exterior 14 ft by 6 ft storage shed, new interior finishes and related site work. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/6/2017 DONE
Second Notice 1/20/20172/13/2017 DONE
Mailed 2-14-17
First Notice 12/19/20161/10/2017 DONE
Mailed 1-11
Permanent Occupancy  12/9/2016 DONE
BLD-Final12/7/201612/8/201612/8/2016PPASS
DetailsJim Sly
Lloyd Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection12/7/201612/8/201612/8/2016APASS
DetailsTroy Cobbley
life safety passed
BLD-Final12/6/201612/7/201612/7/2016PNR
DetailsJim Sly
Lloyd Phone #: ###-####
Need Fire final and permit and final inspection of hood.
FIRE-Final Inspection12/6/201612/7/201612/7/2016AFAIL
DetailsTroy Cobbley
Provide tagged and mounted fire extinguisher as discussed.
CHANGE STATUS TO (ISS)  12/6/2016 DONE
plan mod fees paid
Plan assigned to (AJS)  11/16/2016 PASS
DetailsAdele J Schaffeld-Griffin
Plan Mod not submitted yet
Routing - PLAN CHECK11/9/2016 11/16/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/16/2016 DONE
Permit Ready to Issue  11/16/2016 DONE
DO NOT REISSUE PLAN MOD
Routing - Design Review11/9/2016 11/14/2016 PASS
DetailsAndrea Tuning
Routing - FIRE11/9/201611/9/201611/9/2016 PASS
DetailsKatie Marron
Modifications remove portion of work to construct a new picnic area. No comments attached. Basic Life Safety requirements apply.
Routing - MECHANICAL11/9/2016 11/9/2016 PASS
DetailsTroy James
The mechanical design has been approved to be design by architect. The new kitchen equipment with exhaust and make up air shall be verified for compliance by the mechanical inspector.
Plan Modification Accepted  9/16/2016 DONE
BLD-Framing/Rough-in8/23/20168/23/20168/23/2016PPASS
DetailsJim Storey
Loyd Phone #: ###-####
BLD-Footing8/23/20168/23/20168/23/2016PPASS
DetailsJim Storey
Loyd Phone #: ###-####
Print Occupancy Form  7/22/2016 DONE
Issue PAID IN FULL permit  7/22/2016 DONE
Routing - FIRE7/20/20167/20/20167/20/2016 PASS
DetailsKatie Marron
Removed Picnic Shelter. Plans were reviewed. No comments requried.
Routing PW Environmental7/20/2016 7/20/2016 PASS
DetailsRick Christenson
Met with owner on-site for proper grease abatement.
Routing PW Sewer Rating7/20/2016 7/20/2016 PASS
DetailsRachael Beierle
$3,603 impact fee owed to West Boise Sewer District
Routing - PUBLIC WORKS7/20/2016 7/20/2016 PASS
DetailsRachael Beierle
Removed Picnic Shelter. TLW
PLANS/APPL TAKEN TO FRONT DESK  7/20/2016 DONE
Permit Ready to Issue  7/20/2016 DONE
need gc and rev cert of val
Plan resubmittals received  7/20/2016 DONE
Routing - Design Review7/20/2016 7/20/2016 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK7/20/2016 7/20/2016 PASS
DetailsTim L. Woodard
Plan assigned to (TLW)6/29/2016 7/20/2016 PASS
DetailsTim L. Woodard
Pesto's Pizza
1st review completed  7/18/2016 DONE
Routing - PLAN CHECK6/29/2016 7/18/2016 FAIL
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL6/29/2016 7/12/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Rating7/5/2016 7/5/2016 PASS
DetailsRachael Beierle
Routing - PLANNING Land Div6/29/2016 7/1/2016 PASS
DetailsTodd Tucker
Routing - FIRE6/29/20166/29/20166/29/2016 PASS
DetailsKatie Marron
No comments attached.
Intake Approval  6/29/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Environmental6/29/2016 6/29/2016 FAIL
DetailsTerry Alber
No plumbing shown on plans.

All food service operations require “suitable and adequate” grease abatement equipment and must follow established Fat/Oil & Grease Best Management Practices.
Routing - Design Review6/29/2016 6/29/2016 FAIL
DetailsAndrea Tuning
The applicant is required to provide 3 Class II or Class III street trees. The trees proposed did have identify the species and the spacing was innapropriate. The applicant is also required to provide 3 bicycle parking spaces.
Routing - Addressing6/29/2016 6/29/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/29/2016 6/29/2016 FAIL
DetailsRachael Beierle
need occupancy for pizza. currently under coffee shop. need more information in order to rate for impact. need plans for enviromental.
Routing - Erosion and Sediment6/29/2016 6/29/2016 CANC
DetailsEvan Jenkins
No ESC Permit Required due to small size of project/disturbance.
Plan Reviewer's activity  6/29/2016 DONE
DetailsAdele J Schaffeld-Griffin
email architect 6-29-16

Victor, you submitted this project as a minor TI. I have routed this project as a new building and assigned it to Tim Woodard. Please be aware that this project will fall under the new building and addition time frame for plan review.

New structures will require you to provide documentation from ACHD when you pick up the permit indicating that all fees have been paid or the balance due to be collected at permit issuance.


Thank you

Intake Approval  6/17/2016 FAIL
DetailsAdele J Schaffeld-Griffin
This a new structure. Please complete the 502 check list and upload add additional drawings/documents required.
Intake Approval  6/17/2016 FAIL
DetailsAdele J Schaffeld-Griffin
See mark ups on 502 check list for missing submittal documents.
Application received  6/9/2016 DONE
Application submitted via PDS Online on Jun 9 2016 3:38PM