Print Statement | | | 3/6/2017 | | DONE |
|
|
|
|
Second Notice | | 1/20/2017 | 2/13/2017 | | DONE |
|
|
|
Mailed 2-14-17
|
First Notice | | 12/19/2016 | 1/10/2017 | | DONE |
|
|
|
Mailed 1-11
|
Permanent Occupancy | | | 12/9/2016 | | DONE |
|
|
|
|
BLD-Final | 12/7/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Jim Sly
|
|
|
Lloyd Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 12/6/2016 | 12/7/2016 | 12/7/2016 | P | NR |
Jim Sly
|
|
|
Lloyd Phone #: ###-#### Need Fire final and permit and final inspection of hood.
|
FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide tagged and mounted fire extinguisher as discussed.
|
CHANGE STATUS TO (ISS) | | | 12/6/2016 | | DONE |
|
|
|
plan mod fees paid
|
Plan assigned to (AJS) | | | 11/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod not submitted yet
|
Routing - PLAN CHECK | 11/9/2016 | | 11/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing - Design Review | 11/9/2016 | | 11/14/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 11/9/2016 | 11/9/2016 | 11/9/2016 | | PASS |
Katie Marron
|
|
|
Modifications remove portion of work to construct a new picnic area. No comments attached. Basic Life Safety requirements apply.
|
Routing - MECHANICAL | 11/9/2016 | | 11/9/2016 | | PASS |
Troy James
|
|
|
The mechanical design has been approved to be design by architect. The new kitchen equipment with exhaust and make up air shall be verified for compliance by the mechanical inspector.
|
Plan Modification Accepted | | | 9/16/2016 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Jim Storey
|
|
|
Loyd Phone #: ###-####
|
BLD-Footing | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Jim Storey
|
|
|
Loyd Phone #: ###-####
|
Print Occupancy Form | | | 7/22/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/22/2016 | | DONE |
|
|
|
|
Routing - FIRE | 7/20/2016 | 7/20/2016 | 7/20/2016 | | PASS |
Katie Marron
|
|
|
Removed Picnic Shelter. Plans were reviewed. No comments requried.
|
Routing PW Environmental | 7/20/2016 | | 7/20/2016 | | PASS |
Rick Christenson
|
|
|
Met with owner on-site for proper grease abatement.
|
Routing PW Sewer Rating | 7/20/2016 | | 7/20/2016 | | PASS |
Rachael Beierle
|
|
|
$3,603 impact fee owed to West Boise Sewer District
|
Routing - PUBLIC WORKS | 7/20/2016 | | 7/20/2016 | | PASS |
Rachael Beierle
|
|
|
Removed Picnic Shelter. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2016 | | DONE |
|
|
|
need gc and rev cert of val
|
Plan resubmittals received | | | 7/20/2016 | | DONE |
|
|
|
|
Routing - Design Review | 7/20/2016 | | 7/20/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 7/20/2016 | | 7/20/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 6/29/2016 | | 7/20/2016 | | PASS |
Tim L. Woodard
|
|
|
Pesto's Pizza
|
1st review completed | | | 7/18/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/29/2016 | | 7/18/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 6/29/2016 | | 7/12/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 7/5/2016 | | 7/5/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING Land Div | 6/29/2016 | | 7/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 6/29/2016 | 6/29/2016 | 6/29/2016 | | PASS |
Katie Marron
|
|
|
No comments attached.
|
Intake Approval | | | 6/29/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Environmental | 6/29/2016 | | 6/29/2016 | | FAIL |
Terry Alber
|
|
|
No plumbing shown on plans.
All food service operations require “suitable and adequate” grease abatement equipment and must follow established Fat/Oil & Grease Best Management Practices.
|
Routing - Design Review | 6/29/2016 | | 6/29/2016 | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to provide 3 Class II or Class III street trees. The trees proposed did have identify the species and the spacing was innapropriate. The applicant is also required to provide 3 bicycle parking spaces.
|
Routing - Addressing | 6/29/2016 | | 6/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/29/2016 | | 6/29/2016 | | FAIL |
Rachael Beierle
|
|
|
need occupancy for pizza. currently under coffee shop. need more information in order to rate for impact. need plans for enviromental.
|
Routing - Erosion and Sediment | 6/29/2016 | | 6/29/2016 | | CANC |
Evan Jenkins
|
|
|
No ESC Permit Required due to small size of project/disturbance.
|
Plan Reviewer's activity | | | 6/29/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
email architect 6-29-16
Victor, you submitted this project as a minor TI. I have routed this project as a new building and assigned it to Tim Woodard. Please be aware that this project will fall under the new building and addition time frame for plan review.
New structures will require you to provide documentation from ACHD when you pick up the permit indicating that all fees have been paid or the balance due to be collected at permit issuance.
Thank you
|
Intake Approval | | | 6/17/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
This a new structure. Please complete the 502 check list and upload add additional drawings/documents required.
|
Intake Approval | | | 6/17/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
See mark ups on 502 check list for missing submittal documents.
|
Application received | | | 6/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2016 3:38PM
|