BLD-Final | 6/6/2017 | 6/6/2017 | 6/7/2017 | P | PASS |
Tony Young
|
|
|
scott - call prior Phone #: ###-####
|
DOC - Permit Finaled | 6/7/2017 | 6/7/2017 | 6/7/2017 | A | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/5/2017 | 6/6/2017 | 6/6/2017 | A | PEND |
Tony Young
|
|
|
scott - call prior Phone #: ###-####,, ok pending hill side p/w pass
|
PubWorks Occupancy Approval | 6/6/2017 | 6/6/2017 | 6/6/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | NR |
Dave Hannah
|
|
|
Call to meet // Scott Phone #: ###-#### needs hillside final inside of house ok
|
BLD-Conference | 6/1/2017 | 6/2/2017 | 6/2/2017 | P | CANC |
Tony Young
|
|
|
Scott-as late as possible-please call to meet for access-could possibly need the final as well Phone #: ###-####
|
OVERRIDE | | | 3/1/2017 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/1/2017 | | DONE |
|
|
|
no plan mod fees due
|
Plan assigned to (LEG) Tisha | 2/28/2017 | | 3/1/2017 | | DONE |
Tisha Gallop
|
|
|
Plan Mod
|
Routing - MECHANICAL | 2/28/2017 | | 3/1/2017 | | PASS |
Troy James
|
|
|
new manual j report
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2017 | | DONE |
|
|
|
no plan mod fee for building review
|
Permit Ready to Issue | | | 3/1/2017 | | DONE |
|
|
|
Plan Mod ONLY - DO NOT RE-ISSUE
(no fee due as per Tisha Gallop)
|
Routing - PLAN CHECK | 2/28/2017 | | 2/28/2017 | | PASS |
Tisha Gallop
|
|
|
no change in building; new manual J only
|
Plan Modification Accepted | | | 2/28/2017 | | DONE |
Christina Prado
|
|
|
For mechanical review only - new Manual J for new furnace
|
BLD-Other | 1/26/2017 | 1/27/2017 | 1/28/2017 | P | PASS |
Tony Young
|
|
|
scott,, soffits,, work in progress,, fire rated plywood on patio areas,, sheetrock on other soffits
|
BLD-Conference | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Tony Young
|
|
|
rock wall progression between properties,, rock wall is complete and appears to be stable
|
BLD-Energy code compliance | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Tony Young
|
|
|
ok to cover
|
BLD-Wall cover | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Tony Young
|
|
|
exterior shear// Scott Phone #: ###-####
|
BLD-Energy code compliance | 1/20/2017 | 1/23/2017 | 1/23/2017 | A | PART |
Tony Young
|
|
|
Insulation // Scott Phone #: ###-####,, ok pending sprinkler cover approval
|
BLD-Wall Bracing | 1/18/2017 | 1/19/2017 | 1/19/2017 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 1/18/2017 | 1/19/2017 | 1/19/2017 | A | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, correction posted,, ok to insulate
|
Plan Modification Accepted | | | 1/10/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/10/2017 | | 1/10/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PART |
Tony Young
|
|
|
Derick Phone #: ###-####
|
BLD-Footing | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PART |
Tony Young
|
|
|
Derrick Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 10/11/2016 | 10/11/2016 | 10/11/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | NR |
Jim Sly
|
|
|
Jose Phone #: ###-#### Need Erosion control pre-inspection and approval from Boise City Public Works.
|
OVERRIDE | | | 9/29/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/29/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/29/2016 | | 9/29/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/7/2016 | | 9/29/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 7/29; L2 hillside (need fire rated soffit)
|
Routing - PLAN CHECK | 9/7/2016 | | 9/27/2016 | | FAIL |
Tisha Gallop
|
|
|
need fire rated soffit detail
|
Routing PW Grading-Hillside | 9/27/2016 | | 9/27/2016 | | PASS |
Jason C. Taylor
|
|
|
**NO RETAINING WALLS APPROVED ONSITE**PLANS MUST BE RE-SUBMITTED IF WALLS ARE NEEDED.***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
1st review completed | | | 9/27/2016 | | FAIL |
|
|
|
pending plan check
|
Routing - FIRE | 9/23/2016 | 9/23/2016 | 9/23/2016 | | PASS |
Katie Marron
|
|
|
Per phone conversation with owner, home will be fire sprinklered.
All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space for wildland fire, and are subject to Fire Department inspection.
|
Telephone call | | | 9/23/2016 | | DONE |
Katie Marron
|
|
|
Spoke with Don Flynn of Shadow Mountain Homes and Don accepted the conditions of this building permit requiring the structure to be fire sprinklered in accordance with NFPA 13D; under a separate fire sprinkler permit.
|
Routing - PLANNING | 9/23/2016 | | 9/23/2016 | | PASS |
Celine Acord
|
|
|
rear setbacks 30' side setbacks 5' per CUP08-00099 & CFH08-00026
|
Routing - FIRE | 9/7/2016 | 9/7/2016 | 9/9/2016 | | FAIL |
Katie Marron
|
|
|
Fire Sprinkler System is required. Provide written documentation of intent to comply.
|
Routing PW Grading-Hillside | 9/7/2016 | | 9/9/2016 | | FAIL |
Jason C. Taylor
|
|
|
See notes in eplan. JCT
|
Routing - MECHANICAL | 9/7/2016 | | 9/8/2016 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 9/7/2016 | | 9/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/7/2016 | | 9/7/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 9/7/2016 | | 9/7/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid PD and RP designated. Pre-excavation site preparation inspection is required. Call ###-#### to schedule.
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/7/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2016 | | DONE |
|
|
|
|
Routing - PLANNING | 9/7/2016 | | 9/7/2016 | | FAIL |
Celine Acord
|
|
|
CFH16-00036 - side setbacks must comply with A-1 zoning standards at 10'
|
Intake Approval | | | 8/17/2016 | | FAIL |
Candy A. Nichols
|
|
|
need floor plans labeled with each room including attic and crawl acces, electrical layout plans, structural plans must be stamped by engineer.
|
Application received | | | 6/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2016 4:05PM
|