BLD-Final | 9/7/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 9/7/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####
|
Plan assigned to (LEG) Tisha | 6/10/2016 | | 6/16/2016 | | DONE |
Tisha Gallop
|
|
|
***walk-in received 6/10; egress window...needs floodplain approval
|
Routing - PLAN CHECK | 6/10/2016 | | 6/16/2016 | | PASS |
Tisha Gallop
|
|
|
|
Routing PW Flood Plain | 6/13/2016 | | 6/16/2016 | | PASS |
Jim Wyllie
|
|
|
This is a Pre FIRM Structure with a basement. Basement has many windows. Contact with FEMA indicates no requirements if Substantial Improvement conditions are not aplicable. Substantial Improvement threshold is not met. No floodplain requirements.
Jim Wyllie / ###-####
|
Inspection Record Card- Bld | | | 6/16/2016 | | DONE |
|
|
|
|
1st review completed | | | 6/16/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/16/2016 | | DONE |
|
|
|
MET
|
Telephone call | | | 6/16/2016 | | DONE |
|
|
|
called Joe to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 6/16/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | CANC |
Tisha Gallop
|
|
|
need floodplain approval, took in as level 2 to route
|
Application received | | 6/10/2016 | | | |
|
|
|
|