Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-02135
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameSARMC Dishwashing Room
Customer Number 
ePlanReviewYes
Description
(ST. ALPHONSUS – DISHWASHING ROOM REMODEL - 2ND STORY – SOUTH TOWER) The fire sprinkler system is required because this is a high-rise building and because it is an I-2 Occupancy. To expand the dishwashing area by about 300 square feet from 574 square feet to 874 square feet. The expansion area was formerly a circulation hallway having no occupant load. The occupant load of the adjacent dining room or the adjacent kitchen will not change. Ceiling tiles, gypsum board ceilings, and light fixtures on the 1st story will be removed to accommodate the 2nd story plumbing work. After the work is completed, ceiling tiles will be reinstalled, gypsum board ceilings will be patched and repaired, and light fixtures will be reinstalled. Work on the 2nd story includes 1-hr fire-resistance-rated smoke barrier walls, interior nonbearing non-rated walls, a framed opening in a non-rated wall, a re-located 20 minute automatic-closing double leaf smoke barrier door (hold opens release by smoke detectors), suspended acoustical ceilings, new dishwashing equipment, and finishes. The existing 1-hr smoke barrier walls are required to be maintained or restored if deficient. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/23/20176/30/2017 DONE
This permit finaled on the web by Brandon Byington
First Notice 5/29/20176/13/2017 DONE
sent in mail
BLD-Final5/18/20175/19/20175/19/2017APASS
DetailsMike Jordan
Cecil Phone #: ###-####
Permanent Occupancy  5/19/2017 DONE
FIRE-Final Inspection5/4/20175/5/20175/5/2017PPASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  12/12/2016 DONE
Print Occupancy Form  12/12/2016 DONE
Extend Review Timeline  12/5/2016 DONE
1st approved 180 day extension per Adele. See documents
Telephone call  11/28/2016 DONE
Spoke with Aurora informing her that this permit is going to expire in 10 days. She stated that the GC should be in sometime this week to pick it up.
Expiration Notice11/15/201612/7/201611/15/2016 DONE
DetailsBrittany Hill
OVERRIDE  7/13/2016  
Plan assigned to (CJW)7/6/20167/6/20167/13/2016 PASS
DetailsCarl Westfall
(July 26 - 15 days) Level 3 SARMC Dish Room Remodel
Routing - PLAN CHECK7/6/2016 7/13/2016 PASS
DetailsCarl Westfall
1st review completed  7/13/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/13/2016 DONE
Permit Ready to Issue  7/13/2016 DONE
DetailsChristina Prado
Need RP, GC Form & Revised certificate of value for issuance
Routing PW Environmental7/6/2016 7/12/2016 PASS
DetailsRick Christenson
Routing - PLUMBING7/6/2016 7/11/2016 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing7/6/2016 7/8/2016 PASS
DetailsLaura Hunter
Routing - FIRE7/6/20167/6/20167/7/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PUBLIC WORKS7/6/2016 7/7/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment7/6/2016 7/7/2016 PASS
DetailsAndy J. Long
ESC plan waiver approved for Major TI (level 3).
Routing - MECHANICAL7/6/2016 7/7/2016 PASS
DetailsTroy James
Intake Approval  7/6/2016 PASS
DetailsDavid Ferguson
Intake Approval  6/16/2016 FAIL
DetailsDavid Ferguson
Since this is considered and "I" occupancy, we consider this a Major TI and therefore must be submitted with a completed #520 Major Tenant Improvement checklist and all documents indicated on that checklist.

Also, we need an ESC Waiver Letter in your submittal. Your checklist actually states that you've submitted one but I didn't see it in there.
Intake Approval  6/16/2016 FAIL
DetailsDavid Ferguson
Since this TI is associated with a space that prepares, manufactures or stores food, it must have prior approval from Central District Health Department (CDHD). They also regulate placement of hand sinks which this space has two of. Once you receive approval from CDHD, please resubmit your application.
Application received  6/10/2016 DONE
Application submitted via PDS Online on Jun 10 2016 1:53PM