BLD-Final | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 4/21/2017 | 4/21/2017 | 4/21/2017 | | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Aging Inspection | 12/8/2016 | 12/8/2016 | 12/8/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Footing | 6/22/2016 | 6/24/2016 | 6/24/2016 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Plan assigned to (BJM) | 6/13/2016 | 6/13/2016 | 6/17/2016 | | DONE |
Brian McGowan
|
|
|
Failed, piers did not meet min. standards, no section, missing beam sizes
|
Routing - PLAN CHECK | 6/17/2016 | | 6/17/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2016 | | DONE |
|
|
|
Esc - No, Energy - No
|
Permit Ready to Issue | | | 6/17/2016 | | DONE |
|
|
|
all requirements met
|
Issue PAID IN FULL permit | | | 6/17/2016 | | DONE |
|
|
|
|
Application received | | | 6/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 13 2016 9:24AM
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/13/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/13/2016 | | 6/13/2016 | | FAIL |
Brian McGowan
|
|
|
Shed does not meet minimum structure requirements.
|
Routing - PLANNING | 6/13/2016 | | 6/13/2016 | | PASS |
Celine Acord
|
|
|
approved. setbacks are met, but the shed can be placed 3' from side property line and 9' from property line if applicant would like to.
|
1st review completed | | | 6/13/2016 | | FAIL |
Brian McGowan
|
|
|
Shed does not meet minimum structure requirements.
|