BLD-Final | 3/17/2017 | 3/20/2017 | 3/20/2017 | A | PASS |
Jim Sly
|
|
|
Please call 30 minutes prior to inspection to coordinate entry Phone #: ###-#### Inspection requested via web by Mike Huttash
|
DOC - Permit Finaled | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/17/2017 | 2/17/2017 | 2/17/2017 | | NR |
Jim Storey
|
|
|
no requist for insp
|
BLD-Framing/Rough-in | 10/4/2016 | 10/6/2016 | 10/6/2016 | A | PASS |
Mike Jordan
|
|
|
Rich Phone #: ###-####. Frasming ok. Contractor has noted that homeowner has decided to change exxterior finish to stucco. Noted to contractor that he will need to provide a new UL listed assembly for the stucco. Also per engineer, only able to put 1/2' stucco layer due to weight.
|
BLD-Conference | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Conference | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | CANC |
Jim Storey
|
|
|
Tom or ###-#### Mike Phone #: ###-####
|
BLD-Footing | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Jim Storey
|
|
|
Tom-would liuke as early as possible Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/24/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/7/2016 | | |
|
|
|
|
Telephone call | | | 7/7/2016 | | DONE |
|
|
|
called Rob to let know permit is ready and how much is owed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/7/2016 | | DONE |
|
|
|
As of 8-17-16 ALL requirements met***need GC and RP
|
Routing - PLAN CHECK | 7/6/2016 | | 7/6/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - FIRE | 6/13/2016 | 6/13/2016 | 6/14/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing - PLAN CHECK | 6/14/2016 | | 6/14/2016 | | FAIL |
Brian McGowan
|
|
|
WUI details need modified
|
1st review completed | | | 6/14/2016 | | FAIL |
Brian McGowan
|
|
|
WUI details need modified
|
Routing Walk-In (Zoning) | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PASS |
Celine Acord
|
|
|
approved. needs fire approval
|
Application received | | 6/13/2016 | | | |
|
|
|
|