Print Statement | | | 7/18/2017 | | DONE |
|
|
|
|
First Notice | 6/12/2017 | 6/12/2017 | 7/12/2017 | | DONE |
Jim Storey
|
|
|
Mailed 7-13-17
|
BLD-Final | 6/9/2017 | 6/12/2017 | 6/12/2017 | A | PASS |
Jim Storey
|
|
|
brent Phone #: ###-#### am appt.
|
DOC - Permit Finaled | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | DEFR |
Jim Storey
|
|
|
brent Phone #: ###-####
|
FIRE-Final Inspection | 6/8/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Framing/Rough-in | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | PASS |
Jim Storey
|
|
|
brent Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | PASS |
Jim Storey
|
|
|
Rusty Phone #: ###-#### firepump rm wall fire chalking at gyp to concrete wall ok plm changed to cast iron ok to cover
|
BLD-Framing/Rough-in | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### fire pump rm ok pending clean outs at final to cast iron
|
BLD-Framing/Rough-in | 2/21/2017 | 2/22/2017 | 2/22/2017 | P | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####. Interior steel stud walls for offices and restrooms, west half. ok to one side east half at roof access ladder.
|
BLD-Framing/Rough-in | 1/30/2017 | 1/31/2017 | 1/31/2017 | A | PASS |
Jim Storey
|
|
|
rusty Phone #: ###-####se exterior framing ok
|
CHANGE STATUS TO (ISS) | | | 1/30/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod fees paid in full, permit changed to ISS for inspection
|
OVERRIDE | | | 10/27/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 10/7/2016 | 10/7/2016 | 10/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod Not recieved yet
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/27/2016 | | DONE |
|
|
|
PLAN MOD ONLY
|
Routing - PLAN CHECK | 10/11/2016 | | 10/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
fire pump room
|
BLD-Foundation | 10/11/2016 | 10/12/2016 | 10/12/2016 | P | PART |
Jim Storey
|
|
|
rebar; Rusty Phone #: ###-#### first panels rebar ok pending si
|
Routing - MECHANICAL | 10/11/2016 | | 10/12/2016 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/11/2016 | | 10/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 10/11/2016 | 10/11/2016 | 10/11/2016 | | PASS |
Katie Marron
|
|
|
Modification to add fire pump room. Revised comments attached.
|
Plan Reviewer's activity | | | 10/11/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Damon, I have deleted the following drawings you submitted for your plan modification. Please reload them as directed below.
Needs correct orientation, read left to right.
ASI#1A-13Sheet B
ASI#1A-13Sheet A
A-9
A-7
A-3
A-2
A-14
A-11
A-10
A-1
Needs versioned
P2.2
Thank you
|
Plan Modification Accepted | | | 10/7/2016 | | DONE |
|
|
|
Plan mod to add fire pump room
|
BLD-Footing | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | PART |
Jim Storey
|
|
|
Brent Phone #: ###-#### si pending
|
Issue PAID IN FULL permit | | | 9/12/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/5/2016 | | |
|
|
|
|
Routing PW Drainage | 8/1/2016 | | 8/5/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 8/1/2016 | | 8/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/5/2016 | | DONE |
|
|
|
Need Revised Cert of Value (Met 9-9-16 GC Form and ACHD)
|
Plan assigned to (TLW) | 6/23/2016 | | 8/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 8/3/2016 | | DONE |
|
|
|
received an O & M agreement from The Land Group- gave to Brian Murphy
|
Plan resubmittals received | | | 8/1/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/1/2016 | | 8/1/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 8/1/2016 | | 8/1/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Solid Waste | 8/1/2016 | | 8/1/2016 | | PASS |
Peter J. McCullough
|
|
|
Gates to enclosure must open 120 degrees minimum.
|
Route to Impact Fee Review | 7/22/2016 | 7/25/2016 | 7/27/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | | 6/23/2016 | 7/22/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing Off Site - STRUCTURAL | 6/23/2016 | | 7/22/2016 | | PASS |
Tim L. Woodard
|
|
|
Failed in E-Plan Review. TLW
|
Routing PW Street Lights | 6/23/2016 | | 7/22/2016 | | FAIL |
Tom Marshall
|
|
|
Failed in E-Plan Review. TLW
|
Routing - Erosion and Sediment | 6/23/2016 | | 7/22/2016 | | PASS |
Andy J. Long
|
|
|
This permit voided, ESC permit ESC16-00843 to be issued with GRD16-00044. No need for duplicate permits. ESC plan submitted with this permit
|
Routing - PLAN CHECK | 6/23/2016 | | 7/22/2016 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/22/2016 | | DONE |
|
|
|
|
Routing PW Drainage | 6/23/2016 | | 7/6/2016 | | FAIL |
Brian Murphy
|
|
|
need perc test apd j ect
|
Routing - PLANNING Land Div | 6/23/2016 | | 7/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 6/23/2016 | | 6/29/2016 | | PASS |
Daryl Spivey
|
|
|
|
Routing - MECHANICAL | 6/23/2016 | | 6/28/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Solid Waste | 6/23/2016 | | 6/24/2016 | | FAIL |
Peter J. McCullough
|
|
|
Trash enclosures must be 12' wide ID and have gates which open 120 degrees minimum. Include detail of enclosure.
###-####
|
Routing PW Sewer Design | 6/23/2016 | | 6/23/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Addressing | 6/23/2016 | | 6/23/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/23/2016 | | 6/23/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 6/23/2016 | | 6/23/2016 | | FAIL |
Andrea Tuning
|
|
|
|
Intake Approval | | | 6/23/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/23/2016 | | 6/23/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 6/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 14 2016 2:26PM
|