Telephone call | | | 1/23/2017 | | DONE |
|
|
|
received email from David S with the final values but it wasn't signed so emailed back to him asking him to print and sign and send back
|
Second Notice | | 12/24/2016 | 1/10/2017 | | DONE |
|
|
|
Mailed 1-11
|
First Notice | | 12/2/2016 | 12/14/2016 | | DONE |
|
|
|
Mailed 12-16
|
BLD-Final | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | PASS |
Mike Jordan
|
|
|
would like call ahead; mitch Phone #: ###-####. All issues resolved. Ok for perm occ.
|
Permanent Occupancy | | | 11/22/2016 | | DONE |
|
|
|
|
BLD-Final | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | FAIL |
Jim Storey
|
|
|
Mitch Phone #: ###-####c/n on plan/a2.12 not instaled/904 sales counter need submital reviewed and aproved/door and hardware 105 not per plan
|
FIRE-Final Inspection | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per contractor the internal pocket door is to be disabled permanantly. Per the plan reviewer the door that separates the two tenants is allowed to be locked.
|
FIRE-Final Inspection | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide ADA single action hardware on the doors as discussed.
|
BLD-Final | 11/16/2016 | 11/18/2016 | 11/18/2016 | A | CANC |
Mike Jordan
|
|
|
Call 30 minutes before // Mitch Phone #: ###-####
|
FIRE-Final Inspection | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide small documents/notes, provide ADA compliant hardware (see door schedule) contact plan review about deadbolt on door between tenants.
|
Override - Parcel Holds | | | 8/3/2016 | | |
|
|
|
|
Override - Parcel Holds | | | 8/3/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/3/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/3/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/29/2016 | 6/29/2016 | 7/21/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 7/12 L2 Casa Grande Dental Office ePlan, pend plumb
|
Routing - PLAN CHECK | 7/21/2016 | | 7/21/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 7/21/2016 | | 7/21/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/21/2016 | | DONE |
|
|
|
***all requirments met 8-3-16 /CEV
need GC & rev cert of val
|
Routing - PLAN CHECK | 7/15/2016 | | 7/19/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 7/15/2016 | | 7/19/2016 | | FAIL |
Bill VanDegrift
|
|
|
no corrections made
|
1st review completed | | | 7/7/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLUMBING | 6/29/2016 | | 7/7/2016 | | FAIL |
Bill VanDegrift
|
|
|
provide a plumbing plan showing plumbing and dental air, vacuum and gases stamped by an engineer.
|
Routing - PLAN CHECK | 6/29/2016 | | 7/6/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 6/29/2016 | 6/29/2016 | 6/29/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Environmental | 6/29/2016 | | 6/29/2016 | | PASS |
Rick Christenson
|
|
|
Dental Application has been sent to new owner.
|
Routing - Addressing | 6/29/2016 | | 6/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/29/2016 | | 6/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/29/2016 | | PASS |
David Ferguson
|
|
|
|
Application received | | | 6/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2016 9:06AM
|