Print Statement | | | 2/6/2019 | | DONE |
|
|
|
sent 2nd late notice
|
Print Statement | | | 11/28/2018 | | DONE |
|
|
|
|
Print Statement | | | 11/23/2018 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 7/30/2018 | | DONE |
|
|
|
|
Second Notice | | 6/21/2018 | 7/10/2018 | | DONE |
|
|
|
MAILED 7-11-18
|
First Notice | | 6/4/2018 | 6/11/2018 | | DONE |
|
|
|
Mailed 6-12
|
BLD-Aging Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | | PASS |
Jim Storey
|
|
|
|
Print Occupancy Form | | | 5/25/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/25/2018 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 | | PASS |
Jim Storey
|
|
|
talked to nate he said he would look in to cert. of occ.
|
BLD-Aging Inspection | 1/10/2018 | 1/10/2018 | 1/10/2018 | | PART |
Jim Storey
|
|
|
talked to nate he said he would look in to cert. of occ.
|
BLD-Aging Inspection | 8/29/2017 | 8/29/2017 | 8/29/2017 | | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 4/21/2017 | 4/21/2017 | 4/21/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Nathan Shute
|
BLD-Final | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Nathan Shute si/ada/landing
|
FIRE-Final Inspection | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Conference | 3/10/2017 | 3/14/2017 | 3/14/2017 | A | DONE |
Troy Cobbley
|
|
|
I went over basic life safety requirements with Nathan Shute
|
BLD-Framing/Rough-in | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Jim Storey
|
|
|
Stair framing Phone #: ###-#### Inspection requested via web by Nathan Shute
|
BLD-Wall cover | 2/20/2017 | 2/21/2017 | 2/21/2017 | A | PASS |
Jim Sly
|
|
|
OK to cover inspection request. Phone #: ###-#### Inspection requested via web by Nathan Shute
|
BLD-Framing/Rough-in | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Jim Storey
|
|
|
nathan Phone #: ###-####
|
OVERRIDE | | | 2/6/2017 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/6/2017 | | DONE |
|
|
|
plan mod fees paid
|
Permit Ready to Issue | | | 2/6/2017 | | DONE |
Christina Prado
|
|
|
All met for Plan Mod
DO NOT RE-ISSUE, CHANGE STATUS TO ISS ONCE FEES PAID IN FULL
|
Plan assigned to (CDM) | 2/3/2017 | 2/3/2017 | 2/4/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/4/2017 | | 2/4/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/3/2017 | | |
Christina Prado
|
|
|
Plan Mod to remove proposed rear stair, balcony & associated doors and lights from approved plans
|
BLD-Foundation | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Jim Storey
|
|
|
Nathan Phone #: ###-####
|
Override - Parcel Holds | 11/28/2016 | 1/1/1900 | 11/28/2016 | | |
|
|
|
this permit has been approved and issued
|
Meeting | | | 11/28/2016 | | DONE |
|
|
|
there was a parcel hold on this permit but it was removed per Sarah Schafer-this was the note that was attached in the pacel hold tag: 11-28-16 see email in documents from Sarah S CAN-Per Carl M - No Inspections allowed until BLD16-02207 has been approved and issued. There is a hold on the Idaho Power easement - refer calls to Sarah S and/or Carl M.
|
CHANGE STATUS TO (ISS) | | | 11/28/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/28/2016 | | DONE |
|
|
|
|
BLD-Footing | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PART |
Jim Storey
|
|
|
pipe in ft to address blockout/si on site no aproved plans genral conformance ok
|
OVERRIDE | | | 11/17/2016 | | |
|
|
|
|
BLD-Footing | 11/16/2016 | 11/17/2016 | 11/17/2016 | P | CANC |
Jim Storey
|
|
|
Nathan Phone #: ###-####
|
Plan assigned to (CDM) | 11/4/2016 | 11/4/2016 | 11/17/2016 | | PASS |
Carl D Madsen
|
|
|
Plan Mod Boise Bicycle Project
|
Routing - PLAN CHECK | 11/17/2016 | | 11/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Override - Parcel Holds | | | 11/17/2016 | | |
|
|
|
as per Bob Archibald- okay to schedule inspection while plans are in review
|
Routing - Design Review | 11/5/2016 | | 11/17/2016 | | PASS |
Sarah Schafer
|
|
|
Per e-mail from Idaho Power (Bolander) and phone call from Wewers, power line concerns are resolved.
Rear elevations and a site plan showing setbacks and building location are needed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2016 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/17/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 11/17/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE-- THIS IS A PLAN MOD
|
Routing - PLANNING | 11/5/2016 | | 11/7/2016 | | PASS |
Cody Riddle
|
|
|
Design Review only.
|
Routing - PLAN CHECK | 11/4/2016 | | 11/5/2016 | | PASS |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 11/4/2016 | | DONE |
|
|
|
modifications to stair design
|
Issue PAID IN FULL permit | | | 9/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/2/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 6/28/2016 | 6/28/2016 | 9/2/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing Off Site - STRUCTURAL | 9/2/2016 | | 9/2/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/2/2016 | | 9/2/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/2/2016 | | DONE |
Christina Prado
|
|
|
***All requirements met 9/2/16 C_P** NEED RP, GC form, and certificate of value
|
Routing - PLAN CHECK | 8/23/2016 | | 8/30/2016 | | FAIL |
Carl D Madsen
|
|
|
Failed pending approval of structural design.
|
Routing Off Site - STRUCTURAL | 8/23/2016 | | 8/30/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 8/23/2016 | | 8/23/2016 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 7/22/2016 | 7/25/2016 | 7/27/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 6/28/2016 | | 7/22/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 6/28/2016 | | 7/22/2016 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 7/22/2016 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 6/28/2016 | | 7/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 6/28/2016 | | 6/30/2016 | | PASS |
Daryl Spivey
|
|
|
verify existing sewer piping material. must be approved for inside the building.
|
Routing - FIRE | 6/28/2016 | 6/28/2016 | 6/29/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Drainage | 6/29/2016 | | 6/29/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 6/28/2016 | | 6/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/28/2016 | | 6/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/28/2016 | | 6/29/2016 | | PASS |
Evan Jenkins
|
|
|
(BOISE BICYCLE POJECT - Addition) An addition to the back of the building and adding a second story. This will add office/conference, new bathrooms, and adding additional work space/storage.
|
Routing - MECHANICAL | 6/28/2016 | | 6/29/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 6/28/2016 | | 6/29/2016 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 6/28/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/28/2016 | | 6/28/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 6/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 16 2016 8:38AM
|