(BOISE BICYCLE PROJECT - Addition) *** PLAN MODIFICATIN #2 TO ADDRESS PENETRATIONS OF THE NORTH AND SOUTH 2 HOUR EXTERIOR WALLS""" ""PLAN MODIFICATION TO REMOVE THE EXTERIOR STAIRS AND BALCONY FROM THE WEST SIDE OF THE BUILDING."" permit for a 2,311 sq. ft. 2 story addition (first story 1,295, second story 1,106) to the back of an existing 2,512 sq. ft. The addition will accomodate office/conference, new bathrooms, and additional work and storage space. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/6/2019 DONE
sent 2nd late notice
Print Statement  11/28/2018 DONE
Print Statement  11/23/2018 DONE
sent 1st late notice
Print Statement  7/30/2018 DONE
Second Notice 6/21/20187/10/2018 DONE
MAILED 7-11-18
First Notice 6/4/20186/11/2018 DONE
Mailed 6-12
BLD-Aging Inspection5/25/20185/25/20185/25/2018 PASS
DetailsJim Storey
Print Occupancy Form  5/25/2018 DONE
Permanent Occupancy  5/25/2018 DONE
BLD-Aging Inspection1/11/20181/11/20181/11/2018 PASS
DetailsJim Storey
talked to nate he said he would look in to cert. of occ.
BLD-Aging Inspection1/10/20181/10/20181/10/2018 PART
DetailsJim Storey
talked to nate he said he would look in to cert. of occ.
BLD-Aging Inspection8/29/20178/29/20178/29/2017 PASS
DetailsJim Storey
Zoning Approval4/21/20174/21/20174/21/2017 DONE
DetailsAndrea Tuning
BLD-Final4/17/20174/17/20174/17/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Nathan Shute
BLD-Final4/13/20174/14/20174/14/2017PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Nathan Shute si/ada/landing
FIRE-Final Inspection4/13/20174/14/20174/14/2017PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference3/10/20173/14/20173/14/2017ADONE
DetailsTroy Cobbley
I went over basic life safety requirements with Nathan Shute
BLD-Framing/Rough-in2/27/20172/27/20172/27/2017PPASS
DetailsJim Storey
Stair framing Phone #: ###-#### Inspection requested via web by Nathan Shute
BLD-Wall cover2/20/20172/21/20172/21/2017APASS
DetailsJim Sly
OK to cover inspection request. Phone #: ###-#### Inspection requested via web by Nathan Shute
BLD-Framing/Rough-in2/6/20172/7/20172/7/2017APASS
DetailsJim Storey
nathan Phone #: ###-####
OVERRIDE  2/6/2017  
CHANGE STATUS TO (ISS)  2/6/2017 DONE
plan mod fees paid
Permit Ready to Issue  2/6/2017 DONE
DetailsChristina Prado
All met for Plan Mod

DO NOT RE-ISSUE, CHANGE STATUS TO ISS ONCE FEES PAID IN FULL
Plan assigned to (CDM)2/3/20172/3/20172/4/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK2/4/2017 2/4/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  2/4/2017 DONE
Plan Modification Accepted  2/3/2017  
DetailsChristina Prado
Plan Mod to remove proposed rear stair, balcony & associated doors and lights from approved plans
BLD-Foundation11/28/201611/29/201611/29/2016APASS
DetailsJim Storey
Nathan Phone #: ###-####
Override - Parcel Holds11/28/20161/1/190011/28/2016  
this permit has been approved and issued
Meeting  11/28/2016 DONE
there was a parcel hold on this permit but it was removed per Sarah Schafer-this was the note that was attached in the pacel hold tag: 11-28-16 see email in documents from Sarah S CAN-Per Carl M - No Inspections allowed until BLD16-02207 has been approved and issued. There is a hold on the Idaho Power easement - refer calls to Sarah S and/or Carl M.
CHANGE STATUS TO (ISS)  11/28/2016 DONE
(F) Reprint permit  11/28/2016 DONE
BLD-Footing11/17/201611/17/201611/17/2016PPART
DetailsJim Storey
pipe in ft to address blockout/si on site no aproved plans genral conformance ok
OVERRIDE  11/17/2016  
BLD-Footing11/16/201611/17/201611/17/2016PCANC
DetailsJim Storey
Nathan Phone #: ###-####
Plan assigned to (CDM)11/4/201611/4/201611/17/2016 PASS
DetailsCarl D Madsen
Plan Mod Boise Bicycle Project
Routing - PLAN CHECK11/17/2016 11/17/2016 PASS
DetailsCarl D Madsen
Override - Parcel Holds  11/17/2016  
as per Bob Archibald- okay to schedule inspection while plans are in review
Routing - Design Review11/5/2016 11/17/2016 PASS
DetailsSarah Schafer
Per e-mail from Idaho Power (Bolander) and phone call from Wewers, power line concerns are resolved.

Rear elevations and a site plan showing setbacks and building location are needed.
PLANS/APPL TAKEN TO FRONT DESK  11/17/2016 DONE
Override - Parcel Holds  11/17/2016  
Permit Ready to Issue  11/17/2016 DONE
DO NOT RE-ISSUE-- THIS IS A PLAN MOD
Routing - PLANNING11/5/2016 11/7/2016 PASS
DetailsCody Riddle
Design Review only.
Routing - PLAN CHECK11/4/2016 11/5/2016 PASS
DetailsCarl D Madsen
Plan Modification Accepted  11/4/2016 DONE
modifications to stair design
Issue PAID IN FULL permit  9/6/2016 DONE
Print Occupancy Form  9/6/2016 DONE
OVERRIDE  9/2/2016  
Plan assigned to (CDM)6/28/20166/28/20169/2/2016 PASS
DetailsCarl D Madsen
First review completed
Routing Off Site - STRUCTURAL9/2/2016 9/2/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK9/2/2016 9/2/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/2/2016 DONE
Permit Ready to Issue  9/2/2016 DONE
DetailsChristina Prado
***All requirements met 9/2/16 C_P** NEED RP, GC form, and certificate of value
Routing - PLAN CHECK8/23/2016 8/30/2016 FAIL
DetailsCarl D Madsen
Failed pending approval of structural design.
Routing Off Site - STRUCTURAL8/23/2016 8/30/2016 FAIL
DetailsCarl D Madsen
Routing - Design Review8/23/2016 8/23/2016 PASS
DetailsAndrea Tuning
Route to Impact Fee Review7/22/20167/25/20167/27/2016 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK6/28/2016 7/22/2016 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL6/28/2016 7/22/2016 FAIL
DetailsCarl D Madsen
1st review completed  7/22/2016 FAIL
Routing - PLANNING Land Div6/28/2016 7/1/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING6/28/2016 6/30/2016 PASS
DetailsDaryl Spivey
verify existing sewer piping material. must be approved for inside the building.
Routing - FIRE6/28/20166/28/20166/29/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing PW Drainage6/29/2016 6/29/2016 PASS
DetailsBrian Murphy
Routing - Addressing6/28/2016 6/29/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/28/2016 6/29/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment6/28/2016 6/29/2016 PASS
DetailsEvan Jenkins
(BOISE BICYCLE POJECT - Addition) An addition to the back of the building and adding a second story. This will add office/conference, new bathrooms, and adding additional work space/storage.
Routing - MECHANICAL6/28/2016 6/29/2016 PASS
DetailsTroy James
Routing - Design Review6/28/2016 6/29/2016 PASS
DetailsAndrea Tuning
Intake Approval  6/28/2016 PASS
Pending Assignment by TLW6/28/2016 6/28/2016 DONE
DetailsTim L. Woodard
Application received  6/16/2016 DONE
Application submitted via PDS Online on Jun 16 2016 8:38AM