Telephone call | | | 5/30/2017 | | DONE |
|
|
|
called Jay again to see what the final vaules were for the sub permits-GC said they only did the structural side of it. They said the owners hired all the subs-left message on his phone
|
Print Statement | | | 5/25/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/25/2017 | | DONE |
|
|
|
called Jay Washburn @ ###-####-we need final values on the sub permits. GC said he didn't do the hiring of the subs so he has no idea who or what was done there-left him a message
|
Second Notice | | 4/21/2017 | 5/10/2017 | | DONE |
|
|
|
Mailed 5-11
|
First Notice | | 4/7/2017 | 4/11/2017 | | DONE |
|
|
|
Mailed 4-12-17
|
PubWorks Occupancy Approval | 3/28/2017 | 3/28/2017 | 3/28/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 3/28/2017 | | DONE |
|
|
|
|
BLD-Final | 3/17/2017 | 3/21/2017 | 3/23/2017 | A | DEFR |
Jim Storey
|
|
|
Clint Phone #: ###-####
|
BLD-Final | 3/21/2017 | 3/22/2017 | 3/23/2017 | A | PASS |
Jim Storey
|
|
|
Clint Phone #: ###-####
|
FIRE-Final Inspection | 3/17/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed per Scott Arellano
|
BLD-Final | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | FAIL |
Jim Storey
|
|
|
Clint Phone #: ###-#### need landing at exit door/ fire final/ hvac permit and sign off/ pw/achd
|
BLD-Aging Inspection | 2/15/2017 | 2/15/2017 | 2/15/2017 | P | FAIL |
Jim Storey
|
|
|
occupance w/o framing or final from building
|
BLD-Footing | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | PASS |
Jim Storey
|
|
|
Clint Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/16/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/15/2016 | | |
|
|
|
|
Plan assigned to (JG) | 8/10/2016 | 8/10/2016 | 8/15/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, Dixion Container Tim already approved pending offsite structural
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/15/2016 | | DONE |
|
|
|
NEED RP, GC form, and certificate of value
|
Routing Off Site - STRUCTURAL | 8/10/2016 | | 8/15/2016 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by Chris Holiday of AHJ Engineers
|
Pending Assignment by TLW | 7/6/2016 | | 8/15/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 8/5/2016 | 8/8/2016 | 8/11/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (TLW) | 7/6/2016 | | 8/10/2016 | | DEFR |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/10/2016 | | 8/10/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/5/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/6/2016 | | 8/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 7/6/2016 | | 8/5/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 7/6/2016 | | 7/15/2016 | | PASS |
Brian Murphy
|
|
|
need geo tech and apdx j
|
Routing PW Environmental | 7/6/2016 | | 7/12/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 7/6/2016 | | 7/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Erosion and Sediment | 7/6/2016 | | 7/7/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan and site map submitted and approved. Valid RP designated. Operator Clint with R &S expired
|
Routing - Design Review | 7/6/2016 | | 7/7/2016 | | PASS |
Josh Wilson
|
|
|
Approved per DRH16-00200.
|
Routing - FIRE | 7/6/2016 | 7/6/2016 | 7/6/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PUBLIC WORKS | 7/6/2016 | | 7/6/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING Land Div | 7/6/2016 | | 7/6/2016 | | PASS |
Todd Tucker
|
|
|
|
Intake Approval | | | 6/30/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
6-30-16 One item remaining for pre screen- Please provide an Idaho engineer stamp on the structural calculations for the steel building.
|
Intake Approval | | | 6/30/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 6/28/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
6-28-16 Please see updated mark ups on check list. Not all items were addressed. Please make sure all drawings read left to right.
6-20-16 Please see mark ups on check list for additional items needed.
6-17-16Before I can begin a pre screen please complete and upload the 502 check list. Upload all documents required by checklist.
Please make sure all drawings read left to right.
|
Intake Approval | | | 6/20/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
6-20-16 Please see mark ups on check list for additional items needed.
|
Intake Approval | | | 6/17/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Before I can begin a pre screen please complete and upload the 502 check list. Upload all documents required by checklist.
Please make sure all drawings read left to right.
|
Application received | | | 6/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 16 2016 10:44AM
|