Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-02209
StatusFinaled
Name R & S CONSTRUCTORS
Site Address 3210 E AMITY RD
Project NameDIXON CONTAINER ADDITION
Customer Number 
ePlanReviewYes
Description
(DIXON CONTAINERS – Loading Dock Addition) Permit is to add 4,320 square feet to an existing 50,740 square foot office / manufacturing building. This building is fully sprinklered for unlimited area building provisions. Note: Foundation permit pulled under BLD16-02634. Approval contingent upon adhering to the approved plans on file. Work to include: erect a new prefabricated steel structure, new accessible door, new overhead doors, exterior finishes, new electrical, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  5/30/2017 DONE
called Jay again to see what the final vaules were for the sub permits-GC said they only did the structural side of it. They said the owners hired all the subs-left message on his phone
Print Statement  5/25/2017 DONE
Telephone call  5/25/2017 DONE
called Jay Washburn @ ###-####-we need final values on the sub permits. GC said he didn't do the hiring of the subs so he has no idea who or what was done there-left him a message
Second Notice 4/21/20175/10/2017 DONE
Mailed 5-11
First Notice 4/7/20174/11/2017 DONE
Mailed 4-12-17
PubWorks Occupancy Approval3/28/20173/28/20173/28/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  3/28/2017 DONE
BLD-Final3/17/20173/21/20173/23/2017ADEFR
DetailsJim Storey
Clint Phone #: ###-####
BLD-Final3/21/20173/22/20173/23/2017APASS
DetailsJim Storey
Clint Phone #: ###-####
FIRE-Final Inspection3/17/20173/20/20173/20/2017PPASS
DetailsTroy Cobbley
Life safety passed per Scott Arellano
BLD-Final2/28/20172/28/20172/28/2017PFAIL
DetailsJim Storey
Clint Phone #: ###-#### need landing at exit door/ fire final/ hvac permit and sign off/ pw/achd
BLD-Aging Inspection2/15/20172/15/20172/15/2017PFAIL
DetailsJim Storey
occupance w/o framing or final from building
BLD-Footing9/19/20169/20/20169/20/2016APASS
DetailsJim Storey
Clint Phone #: ###-####
Issue PAID IN FULL permit  8/16/2016 DONE
Print Occupancy Form  8/16/2016 DONE
OVERRIDE  8/15/2016  
Plan assigned to (JG)8/10/20168/10/20168/15/2016 PASS
DetailsJavier Guzman
1st review completed, Dixion Container Tim already approved pending offsite structural
PLANS/APPL TAKEN TO FRONT DESK  8/15/2016 DONE
Permit Ready to Issue  8/15/2016 DONE
NEED RP, GC form, and certificate of value
Routing Off Site - STRUCTURAL8/10/2016 8/15/2016 PASS
DetailsJavier Guzman
signed off in ePlan by Chris Holiday of AHJ Engineers
Pending Assignment by TLW7/6/2016 8/15/2016 PASS
DetailsTim L. Woodard
Route to Impact Fee Review8/5/20168/8/20168/11/2016 PASS
DetailsCindy M. Gould
Plan assigned to (TLW)7/6/2016 8/10/2016 DEFR
DetailsTim L. Woodard
Routing - PLAN CHECK8/10/2016 8/10/2016 PASS
DetailsJavier Guzman
1st review completed  8/5/2016 DONE
Routing - PLAN CHECK7/6/2016 8/5/2016 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL7/6/2016 8/5/2016 FAIL
DetailsTim L. Woodard
Routing PW Drainage7/6/2016 7/15/2016 PASS
DetailsBrian Murphy
need geo tech and apdx j
Routing PW Environmental7/6/2016 7/12/2016 PASS
DetailsRick Christenson
Routing - Addressing7/6/2016 7/8/2016 PASS
DetailsLaura Hunter
Routing - Erosion and Sediment7/6/2016 7/7/2016 PASS
DetailsAndy J. Long
ESC plan and site map submitted and approved. Valid RP designated. Operator Clint with R &S expired
Routing - Design Review7/6/2016 7/7/2016 PASS
DetailsJosh Wilson
Approved per DRH16-00200.
Routing - FIRE7/6/20167/6/20167/6/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PUBLIC WORKS7/6/2016 7/6/2016 PASS
DetailsRachael Beierle
Routing - PLANNING Land Div7/6/2016 7/6/2016 PASS
DetailsTodd Tucker
Intake Approval  6/30/2016 FAIL
DetailsAdele J Schaffeld-Griffin
6-30-16 One item remaining for pre screen- Please provide an Idaho engineer stamp on the structural calculations for the steel building.
Intake Approval  6/30/2016 PASS
DetailsTim L. Woodard
Intake Approval  6/28/2016 FAIL
DetailsAdele J Schaffeld-Griffin
6-28-16 Please see updated mark ups on check list. Not all items were addressed. Please make sure all drawings read left to right.

6-20-16 Please see mark ups on check list for additional items needed.

6-17-16Before I can begin a pre screen please complete and upload the 502 check list. Upload all documents required by checklist.
Please make sure all drawings read left to right.
Intake Approval  6/20/2016 FAIL
DetailsAdele J Schaffeld-Griffin
6-20-16 Please see mark ups on check list for additional items needed.
Intake Approval  6/17/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Before I can begin a pre screen please complete and upload the 502 check list. Upload all documents required by checklist.
Please make sure all drawings read left to right.
Application received  6/16/2016 DONE
Application submitted via PDS Online on Jun 16 2016 10:44AM