Permit Information
Permit NumberBLD16-02213
StatusFinaled
Name HCD INC
Site Address 9050 W OVERLAND RD Unit: 130
Project NameSmall Cakes Cupcakery - Ste130
Customer Number 
ePlanReviewYes
Description
**(SMALL CAKES CUPCAKERY - ANDERSON BLACK EAGLE BLDG – SUITE 130)** Permit is to remodel an existing 1,410 sq. ft. assembly tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing wall, removal of select millwork, construction of select interior nonbearing walls, new millwork, adding a light fixture, electrical work plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/27/20161/10/2017 DONE
Mailed 1-11
First Notice 12/25/201612/16/2016 DONE
Mailed 12-19-16
Print Occupancy Form  12/15/2016 DONE
Print Occupancy Form  12/15/2016 DONE
Permanent Occupancy  12/15/2016 DONE
BLD-Final12/13/201612/14/201612/14/2016APASS
DetailsMike Jordan
randy Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection11/29/201611/30/201611/30/2016APASS
DetailsTroy Cobbley
Life safety passed. A baffle has been provided
FIRE-Final Inspection11/28/201611/29/201611/29/2016PFAIL
DetailsTroy Cobbley
Provide sprinkler modifications or baffle as discussed, provide documentation that the emergency light in the kitchen can be deleted. Exit discharge lights repaired as I waited.
CHANGE STATUS TO (ISS)  10/21/2016 DONE
Should not have been finaled per Mike J. See notes in doc final
First Notice10/6/201610/6/201610/17/2016 DONE
DetailsMike Jordan
Mailed 10-18-16
DOC - Permit Finaled  10/17/2016 DONE
Final passes 10-6-16
BLD-Framing/Rough-in10/5/201610/6/201610/6/2016APASS
DetailsMike Jordan
DOC - Permit Finaled10/6/201610/6/201610/6/2016PPASS
DetailsMike Jordan
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Framing/Rough-in10/5/201610/5/201610/5/2016PNR
DetailsMike Jordan
Randy Phone #: ###-####. Needs MEP;s
Print Occupancy Form  9/23/2016 DONE
Issue PAID IN FULL permit  9/23/2016 DONE
OVERRIDE  8/19/2016  
Plan assigned to (JG)6/21/20166/21/20168/19/2016 PASS
DetailsJavier Guzman
1st review completed, 7/04 L2 Small Cakes Cupcakery TI ePlan, Pend Mech
Routing - MECHANICAL8/17/2016 8/19/2016 PASS
DetailsTroy James
Routing Off Site - C.D.H8/17/2016 8/19/2016 PASS
DetailsJavier Guzman
signed off in ePlan by Brent Copes of central district health
PLANS/APPL TAKEN TO FRONT DESK  8/19/2016 DONE
Permit Ready to Issue  8/19/2016 DONE
***All MET*** Needs; RP, GC Form, Revised Cert of Value
Routing - FIRE8/17/20168/17/20168/17/2016 PASS
DetailsKatie Marron
Modifications reviewed. No comments required.
Routing - PLAN CHECK8/17/2016 8/17/2016 PASS
DetailsJavier Guzman
Routing - MECHANICAL8/4/2016 8/8/2016 FAIL
DetailsTroy James
Talked to mechanical engineer requirements for type 2 hood.
Routing - PLAN CHECK8/4/2016 8/4/2016 PASS
DetailsJavier Guzman
1st review completed  7/6/2016 FAIL
DetailsJavier Guzman
CDH review delayed making 1st review go over
Routing Off Site - C.D.H6/21/2016 7/6/2016 PASS
DetailsJavier Guzman
Signed off in ePlan By Brent Copes of Central District Health
Plan Reviewer's activity  7/5/2016 DONE
DetailsJavier Guzman
emailed Brent w/CDH and he said he was waiting for a site visit with architect on 7/6/16 at which point he would do his review on project following the site visit
Routing - PLAN CHECK6/21/2016 7/5/2016 PASS
DetailsJavier Guzman
Routing - FIRE6/21/20166/21/20166/22/2016 PASS
DetailsKatie Marron
No comments attached.
Routing - Addressing6/21/2016 6/22/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/21/2016 6/22/2016 PASS
DetailsRachael Beierle
Routing - PLUMBING6/21/2016 6/22/2016 PASS
DetailsBill VanDegrift
additional cross connection protection may be required
Routing PW Environmental6/22/2016 6/22/2016 PASS
DetailsTerry Alber
Contractor to verify connection of kitchen floor sinks to Grease Interceptor located in parking spot on north side of building. Floor sink being relocated must be connected to GI.
Routing - Erosion and Sediment6/21/2016 6/21/2016 PASS
DetailsEvan Jenkins
Remodel of existing coffee shop for new coffee and cup cake shop. Non-bearing wall demo, new non-bearing wall, equipment connection to existing plumbing, electrical, light replacement, cabinets.
Routing - MECHANICAL6/21/2016 6/21/2016 FAIL
DetailsTroy James
Intake Approval  6/21/2016 PASS
DetailsDavid Ferguson
Intake Approval  6/18/2016 FAIL
DetailsDavid Ferguson
Please upload the large plan sheets so that they we can view them in their entirety. Three of the four sheets were cut off at both sides. The cover sheet was the only sheet that was not affected.
Application received  6/16/2016 DONE
Application submitted via PDS Online on Jun 16 2016 4:17PM