Print Statement | | | 1/9/2018 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 8/31/2017 | | DONE |
|
|
|
|
First Notice | | 8/7/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
Permanent Occupancy | | | 7/28/2017 | | DONE |
|
|
|
|
BLD-Final | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Brandon Shaw
|
|
|
correct remote annunciators should be installed by noon. FLS called in. Andy should have ESC finaled, and Pictures of trash gates are sent to Katelyn. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
DOC - Permit Finaled | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Jim Page
|
|
|
Previously noted items have been repaired. No fire sprinklers, only fire alarms are in-duct detection with stand alone annunciators (not monitored), fire extinguishers are in place with current inspection tags. Final life fire safey inspection passed/complete.
|
Zoning Approval | 7/26/2017 | 7/26/2017 | 7/26/2017 | | PASS |
Katelyn Menuge
|
|
|
Design Review
|
BLD-Final | 7/24/2017 | 7/25/2017 | 7/24/2017 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by J.C. Murray Inspection cancelled from web by: J.C. Murray
|
FIRE-Final Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | FAIL |
Troy Cobbley
|
|
|
remote annunciators are not the correct ones. No testing performed.
|
FIRE-Final Inspection | 7/21/2017 | 7/21/2017 | 7/21/2017 | A | CANC |
Troy Cobbley
|
|
|
request 11am inspection. remote annunciators should be delivered, installed and functional by 11am. Phone #: ###-#### >> Inspection requested via web by J.C. Murray Inspection cancelled from web by: J.C. Murray
|
BLD-Final | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | NR |
Brandon Shaw
|
|
|
mid morning OK. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | FAIL |
Troy Cobbley
|
|
|
FD vehicle access is approved for building "B" only with two available fire hydrants. The second required hydrant will be accessed from east Barber Valley Dr. until the parking lots have been completed servicing future buildings "A & C". *SJA*
For life safety to be finaled remote annunciators are required for the two duct smoke detectors and testing of the detectors.
|
BLD-Framing/Rough-in | 6/15/2017 | 6/15/2017 | 6/15/2017 | P | PASS |
Brandon Shaw
|
|
|
electrical cover scheduled for this afternoon Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 6/15/2017 | 6/15/2017 | 6/15/2017 | P | PASS |
Brandon Shaw
|
|
|
remaining exterior walls Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 6/13/2017 | 6/13/2017 | 6/13/2017 | P | PART |
Brandon Shaw
|
|
|
exterior walls Phone #: ###-#### Inspection requested via web by J.C. Murray Studios 1, 2, & 3- exterior walls only
|
BLD-Conference | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | DONE |
Brandon Shaw
|
|
|
Pre-framing inspection. No issues, pending other trades rough in.
|
BLD-Framing/Rough-in | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Wall Bracing | 5/11/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Brandon Shaw
|
|
|
JC Phone #: ###-####
|
BLD-Foundation | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Jim Storey
|
|
|
Rebar // Paul Phone #: ###-####
|
BLD-Footing | 4/5/2017 | 4/6/2017 | 4/6/2017 | P | PART |
Jim Storey
|
|
|
mud is scheduled at 3pm Strata will be on site for rebar and concrete test. Phone #: ###-#### Inspection requested via web by J.C. Murray placed w si report to bshaw
|
Issue PAID IN FULL permit | | | 3/21/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/21/2017 | | DONE |
|
|
|
|
Extend Review Timeline | | | 12/8/2016 | | DONE |
|
|
|
1st Approved Extension Per Adele. See documents
|
Telephone call | | | 12/7/2016 | | DONE |
|
|
|
Spoke with Cornel informing him this permit is going to expire in ten days. He stated he will speak to the customers again and let them know. Made the comment that he recieved the letter I sent out (I, blh, never recieved the green card back signed)
|
Expiration Notice | 11/22/2016 | 12/14/2016 | 11/22/2016 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 9/9/2016 | | |
|
|
|
|
Plan assigned to (JG) | 8/23/2016 | 8/23/2016 | 9/9/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, Boise Dance Alliance pending PW drainage
|
Routing PW Drainage | 9/8/2016 | | 9/9/2016 | | PASS |
Jason C. Taylor
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/9/2016 | | DONE |
Christina Prado
|
|
|
Need RP only 3/10/17 C_P /// Need RP, GC Form and Revised Cert of Value
|
Routing PW Drainage | 9/3/2016 | | 9/8/2016 | | FAIL |
Jason C. Taylor
|
|
|
O&M Manual needs revised and uploaded. JCT
|
Routing - PLAN CHECK | 9/8/2016 | | 9/8/2016 | | PASS |
Javier Guzman
|
|
|
Previously signed off in ePlan by Tim Woodard, Project given to me so that i may manage the project
|
Routing - PLAN CHECK | 9/3/2016 | | 9/3/2016 | | PASS |
Javier Guzman
|
|
|
Previously signed off in ePlan by Tim Woodard, Project given to me so that i may manage the project
|
Plan assigned to (TLW) | 6/27/2016 | | 8/23/2016 | | DEFR |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Design | 8/9/2016 | | 8/22/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing Off Site - STRUCTURAL | 8/9/2016 | | 8/22/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 8/9/2016 | | 8/18/2016 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in eplan. JCT
|
Routing - PLUMBING | 8/9/2016 | | 8/15/2016 | | PASS |
Daryl Spivey
|
|
|
Install per red line markups and ISPC.
|
Plan resubmittals received | | | 8/9/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/9/2016 | | 8/9/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved with attached signed alternate. TLW
|
Routing - MECHANICAL | 8/9/2016 | | 8/9/2016 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/26/2016 | 7/29/2016 | 7/27/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 7/26/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/27/2016 | | 7/26/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Flood Plain | 6/27/2016 | | 7/26/2016 | | PASS |
Jim Wyllie
|
|
|
|
Routing Off Site - STRUCTURAL | 6/27/2016 | | 7/15/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 6/27/2016 | | 7/13/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Design Review | 6/27/2016 | | 7/7/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Sewer Design | 6/27/2016 | | 7/5/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Separate review period required for public sewer extension from the Public Works Department. I'll mark up the sheets submitted and return to the Land Group with comments. - Kyle Rosenmeyer
|
Routing - PLANNING Land Div | 6/27/2016 | | 7/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - MECHANICAL | 6/27/2016 | | 6/29/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 6/27/2016 | | 6/29/2016 | | FAIL |
Daryl Spivey
|
|
|
1) provide approved sewer plans
2) increase venting for minimum cross sectional area
|
Routing PW Drainage | 6/27/2016 | | 6/29/2016 | | FAIL |
Brian Murphy
|
|
|
See changemarks in ePlan. JCT
|
Routing - FIRE | 6/27/2016 | 6/27/2016 | 6/28/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Addressing | 6/27/2016 | | 6/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Erosion and Sediment | 6/27/2016 | | 6/28/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(BOISE DANCE ALLIANCE) Permit to build a new 5,700 square foot dance studio.
|
Routing PW Street Lights | 6/27/2016 | | 6/28/2016 | | PASS |
Tom Marshall
|
|
|
|
Pending Assignment by TLW | 6/27/2016 | | 6/27/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2016 | | 6/27/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/23/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 6/21/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see mark ups on intake check list.
|
Intake Approval | | | 6/21/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
I revised the check list, however there as still some outstanding items.
|
Application received | | | 6/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 20 2016 8:43AM
|