Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberBLD16-02258
StatusFinaled
Name LOUIS JENNIFER
Site Address 2618 S HAYDEN WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit to modify/remove existing stair walls on main floor and replace with new beams above to open up view. Engineering has been provided for structure. Existing windows on the back wall are being replaced with taller windows or sliding glass doors. The actual rough opening is not being increased. New Kitchen will be installed. One Basement window and window well are being infilled to allow door from Living Room. No other improvements are proposed at this time. Plans show a second floor, second stairs being added to upper floor and garage to be constructed. The Louis' have chosen not to do that at this time. A plan modification is required prior to beginning those projects. Separate electrical, mechanical, plumbing permits are required. All work to be done according to plans, notes, review notes and local codes. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/8/20172/8/20172/15/2017 DONE
DetailsJim Storey
BLD-Aging Inspection2/7/20172/7/20172/15/2017 DONE
DetailsJim Storey
BLD-Final2/12/20172/13/20172/13/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by David Louis
DOC - Permit Finaled2/13/20172/13/20172/13/2017PPASS
DetailsJim Storey
BLD-Framing/Rough-in9/23/20169/26/20169/26/2016PPASS
DetailsJim Storey
would like call ahead; Jennifer Phone #: ###-####-please call 20 minutes prior to meet ok to cover upon ele ri
Permit Ready to Issue  9/21/2016 DONE
Issue PAID IN FULL permit  9/21/2016 DONE
Routing - PLAN CHECK9/15/2016 9/20/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  9/20/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  9/20/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/20/2016 DONE
DetailsBrian McGowan
Energy Yes
ESC no
Routing Walk-In (BLD)9/15/20169/15/20169/15/2016APASS
DetailsBrian McGowan
Came in to change scope of work
Routing Walk-In (BLD)9/7/20169/7/20169/15/2016ADONE
DetailsKristal Soland
Routing - PLAN CHECK9/13/2016 9/13/2016 FAIL
DetailsBrian McGowan
Additional sections and details are required
Routing Walk-In (Zoning)9/7/20169/7/20169/7/2016APASS
DetailsJeff Lowe
Application received 6/20/20169/7/2016 DONE
DetailsJeff Lowe
Plan resubmittals received  9/7/2016 DONE
received (2) sets of calculations
Routing Walk-In (BLD)6/20/20166/20/20166/20/2016PFAIL
DetailsDavid Ferguson
Need engineering to look at structural issues in the hand stacked roof system.
1st review completed  6/20/2016 DONE
DetailsAdele J Schaffeld-Griffin