Permit Information
Permit NumberBLD16-02260
StatusFinaled
Name KIMBERLY HUFFMAN
Site Address 8073 W FAIRVIEW AVE
Project NameWood Expressions
Customer Number 
ePlanReviewNo
Description
**(WOOD EXPRESSIONS)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 2,367 sq ft existing retail shop. This space was previously approved as a “Computer Renaissance” under BLD96-03351. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/28/20167/28/20167/28/2016PPASS
DetailsMike Jordan
Ok for perm occ.
FIRE-Final Inspection7/27/20167/28/20167/28/2016APASS
DetailsTroy Cobbley
Life safety passed
Print Occupancy Form  7/28/2016 DONE
Permanent Occupancy  7/28/2016 DONE
FIRE-Final Inspection7/25/20167/26/20167/26/2016AFAIL
DetailsTroy Cobbley
All life safety items have been addressed. However per direction of the Boise Fire Dept. there can be no sign off as per letter.
BLD-Final6/29/20166/30/20166/30/2016ANR
DetailsMike Jordan
would like call ahead; Kim Phone #: ###-####. Fire/life/safety final failed.
FIRE-Final Inspection6/29/20166/29/20166/29/2016PFAIL
DetailsTroy Cobbley
See the city approved plans for list of required corrections that include: sprinkler permit for required modifications, repair all exit signs/emergency lights, provide sticker at main exit, remove deadbolts from office and rear exit doors, resubmit plans with corrected wall layout (plans show island restrooms shared with another tenant but door no longer exists.
Permit Ready to Issue  6/29/2016 DONE
Print Occupancy Form  6/29/2016 DONE
Telephone call  6/29/2016 DONE
Spoke with Kim informing her that this permit is ready to be picked up and which ever tech she sees will go over the required inspections for occupancy
Issue PAID IN FULL permit  6/29/2016 DONE
Plan assigned to (TLW)6/21/2016 6/28/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/21/2016 6/28/2016 PASS
DetailsTim L. Woodard
1st review completed  6/28/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/28/2016 DONE
Case Summary (BLD)  6/28/2016 DONE
Plans ACCEPTED BY PLAN TECH  6/21/2016 DONE
Intake Approval  6/21/2016 PASS
Recd Pcfee & Taken To Pln CK  6/21/2016 DONE
First Notice 8/7/2016   
Application received 6/20/2016