BLD-Final | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
Kyle Phone #: ###-####
|
DOC - Permit Finaled | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 8/22/2017 | 8/22/2017 | 8/22/2017 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Final | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PEND |
Dave Hannah
|
|
|
Kelly Phone #: ###-#### needs zoning final
|
BLD-Energy code compliance | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | PASS |
Jim Sly
|
|
|
Kelly Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2016 | 12/9/2016 | 12/12/2016 | P | NR |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Wall Bracing | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Footing | 11/9/2016 | 11/10/2016 | 11/10/2016 | A | PASS |
Dave Hannah
|
|
|
Dave-pour time 12:00 Phone #: ###-####
|
OVERRIDE | | | 6/27/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/27/2016 | 6/27/2016 | 6/27/2016 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/27/2016 | | 6/27/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/27/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/21/2016 | 6/21/2016 | 6/21/2016 | A | PASS |
Jeff Lowe
|
|
|
|
1st review completed | | | 6/21/2016 | | FAIL |
Brian McGowan
|
|
|
Need drawings for hand stack structure. Sections, structural drawings (beams, headers, cinnections), details were not provided.
|
Application received | | 6/21/2016 | | | |
|
|
|
|