Second Notice | | 11/24/2016 | 11/24/2016 | | DONE |
|
|
|
This permit finaled on the web by Justin Dauby
|
First Notice | | 10/27/2016 | 11/14/2016 | | DONE |
|
|
|
Mailed 11-15-16
|
Print Occupancy Form | | | 10/17/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/17/2016 | | DONE |
|
|
|
|
BLD-Final | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Phil Shearer
|
|
|
would like call ahead; Mike Phone #: ###-####
|
FIRE-Final Inspection | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags, fire riser room was locked so I could not verify if building fire sprinkler inspection is current. Final life fire safety inspection passed/complete.
|
BLD-Framing/Rough-in | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
Place hold on job | 7/5/2016 | | 7/7/2016 | | DONE |
Candy A. Nichols
|
|
|
DO NOT ISSUE WITHOUT BLD16-02450
|
Print Occupancy Form | | | 7/7/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/7/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/27/2016 | 6/27/2016 | 7/5/2016 | | PASS |
Javier Guzman
|
|
|
7/06 L1 Americana Orthopedics TI ePlan
|
Routing - PLAN CHECK | 6/27/2016 | | 7/5/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/5/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/5/2016 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Routing - Addressing | 6/27/2016 | | 6/27/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2016 | | 6/27/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/27/2016 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 6/24/2016 | | FAIL |
David Ferguson
|
|
|
A # 304 Registered Design Professional form was submitted however the plan sheet is not stamped and signed. Also, because the scope of work is creating a new tenant space, a 2nd application will be required to be submitted for that space. Please fill out a 2nd application for that space and upload it into the same project folder. Internally, we'll route it to our addressing department so that they can assign it a new address (suite#).
|
Application received | | | 6/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 22 2016 11:59AM
|