BLD-Final | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
DOC - Permit Finaled | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 11/15/2017 | 11/15/2017 | 11/15/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor 208 ###-####.
|
BLD-Conference | 11/9/2017 | 11/13/2017 | 11/13/2017 | P | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, ?s on final,, walk through
|
BLD-Wall Bracing | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PART |
Tony Young
|
|
|
james Phone #: ###-####,, soffits ok,, work in progress,, one layer of 5/8",, hardie soffit and fire vents
|
BLD-Energy code compliance | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | PART |
Tony Young
|
|
|
James Phone #: ###-####,, ok to cover,, need to resolve egress issue by the final
|
BLD-Framing/Rough-in | 6/23/2017 | 6/26/2017 | 6/27/2017 | P | PART |
Dave Hannah
|
|
|
James Phone #: ###-#### ok to insulate c/n on site
|
BLD-Conference | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | PASS |
Tony Young
|
|
|
James Phone #: ###-####,, frame walk through,, see James for list
|
BLD-Wall Bracing | 5/3/2017 | 5/4/2017 | 5/4/2017 | P | PART |
Brandon Shaw
|
|
|
James Vogel Phone #: ###-#### Tighten all hold down bolts, Special inpection report needed for missing hold down/Straps. Ok to cover exterior only.
|
BLD-Wall Bracing | 5/1/2017 | 5/2/2017 | 5/2/2017 | P | FAIL |
Dave Hannah
|
|
|
James Phone #: ###-#### c/n with plans do not cover
|
Plan Modification Accepted | | | 4/6/2017 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 4/6/2017 | | 4/6/2017 | | PASS |
Troy James
|
|
|
Resubmitted manual j report due to the basement design deleted.
|
BLD-Foundation | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PASS |
Tony Young
|
|
|
Request inspection about 1 Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 2/27/2017 | 2/27/2017 | 2/27/2017 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears// same area as soils approval
|
PubWorks Subgrade Approval | 2/27/2017 | 2/27/2017 | 2/27/2017 | | DONE |
Jason C. Taylor
|
|
|
**retaining wall around existing tree only***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, needs hillside approval
|
BLD-Foundation | 1/9/2017 | 1/9/2017 | 1/9/2017 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, ok
|
PubWorks Subgrade Approval | 1/3/2017 | 1/3/2017 | 1/3/2017 | | DONE |
Jason C. Taylor
|
|
|
**North and south residential footings***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 12/29/2016 | 12/29/2016 | 12/29/2016 | A | PART |
Tony Young
|
|
|
Request inspection after 11 Phone #: ###-#### Inspection requested via web by Ben Sears,, house footingsok pending soils apperoval
|
BLD-Foundation | 12/12/2016 | 12/12/2016 | 12/12/2016 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, planter retaining wall ok,, work in progress
|
BLD-Footing | 12/5/2016 | 12/5/2016 | 12/6/2016 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, planter ftgs per soils approval
|
PubWorks Subgrade Approval | 12/6/2016 | 12/6/2016 | 12/6/2016 | | DONE |
Jason C. Taylor
|
|
|
***Planter Wall Footing - East Side***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Phil Shearer
|
|
|
Request early inspection. Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Tony Young
|
|
|
Request early pm inspection. Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, north and east
|
BLD-Footing | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | NR |
Tony Young
|
|
|
Request a late morning inspection. Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 11/15/2016 | 11/15/2016 | 11/15/2016 | | DONE |
Jason C. Taylor
|
|
|
**NORTH WALL - NORTH AND EAST FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
BLD-Foundation | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 10/30/2016 | 10/31/2016 | 10/31/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears. South retaining wall footing only.
|
PubWorks Subgrade Approval | 10/31/2016 | 10/31/2016 | 10/31/2016 | | DONE |
Jason C. Taylor
|
|
|
**SOUTH SIDE WALL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, middle retaining wall footing ok,, work in progress
|
PubWorks Subgrade Approval | 10/28/2016 | 10/28/2016 | 10/28/2016 | | DONE |
Jason C. Taylor
|
|
|
**UPPER RETAINING WALL ON NW SIDE ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 10/14/2016 | 10/14/2016 | 10/14/2016 | P | PASS |
Phil Shearer
|
|
|
Request early inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PART |
Tony Young
|
|
|
Request earliest possible inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Foundation | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PART |
Tony Young
|
|
|
Request earliest possible inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
PubWorks Subgrade Approval | 10/11/2016 | 10/11/2016 | 10/11/2016 | | DONE |
Jason C. Taylor
|
|
|
**MIDDLE WALL ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PART |
Tony Young
|
|
|
Request 3 o''clock inspection Phone #: ###-#### Inspection requested via web by Ben Sears,, lower retaining wall footing ok
|
PubWorks Subgrade Approval | 10/7/2016 | 10/7/2016 | 10/7/2016 | | DONE |
Jason C. Taylor
|
|
|
**LOWEST RETAINING WALL ON WESTERN EDGE ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 9/21/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 8/3/2016 | 8/3/2016 | 9/21/2016 | | DONE |
David Ferguson
|
|
|
due 8/18 - plan review complete - need WUI details for flat roof membrane system.
|
Issue PAID IN FULL permit | | | 9/21/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2016 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 9/19/2016 | | 9/21/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/21/2016 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 9/19/2016 | | 9/19/2016 | | PASS |
David Ferguson
|
|
|
|
Routing PW Grading-Hillside | 9/13/2016 | | 9/16/2016 | | FAIL |
Jason C. Taylor
|
|
|
See note in eplan.
|
Routing - PLAN CHECK | 9/13/2016 | | 9/13/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing PW Grading-Hillside | 8/1/2016 | | 8/18/2016 | | FAIL |
Jason C. Taylor
|
|
|
Grading plans need revised as per CFH approval. See List uploade to grading plan in ePlan. JCT
|
1st review completed | | | 8/18/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 8/1/2016 | | 8/18/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - MECHANICAL | 8/1/2016 | | 8/3/2016 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 8/1/2016 | | 8/3/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 8/1/2016 | 8/4/2016 | 8/2/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 8/1/2016 | 8/1/2016 | 8/2/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access, hydrant proximity and defensible space. No comments required.
|
Routing - PUBLIC WORKS | 8/1/2016 | | 8/2/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/1/2016 | | 8/2/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 6742 sq. ft., two story (first story 3720 sq. ft., second story 1592 sq. ft., and basement 1430 sq. ft.) single family dwelling with 6 bedrooms, 4 bathrooms and 3 half bathrooms, approximately 209 sq. ft. of covered patio/porch and a 1136 sq. ft. attached garage per the approved plans,
|
Routing - PLANNING | 8/1/2016 | | 8/2/2016 | | PASS |
Celine Acord
|
|
|
CFH16-00040
|
Routing - Addressing | 8/1/2016 | | 8/1/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/1/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/27/2016 | | FAIL |
|
|
|
Plans were not 18x24 and uploaded wrong way, missing stair section, wall sections stating insulation, anchor bolts, missing rescheck and erosion narrative
|
Application received | | | 6/23/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 23 2016 12:46PM
|