BLD-Final | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 10/9/2017 | 10/9/2017 | 10/9/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 10/5/2017 | 10/5/2017 | 10/5/2017 | | PART |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Aging Inspection | 10/4/2017 | 10/4/2017 | 10/5/2017 | | DEFR |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin-interior shear wall Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/23/2017 | | DONE |
|
|
|
was doc finaled by mistake-no final was done just the energy
|
BLD-Energy code compliance | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Shear // Justin Phone #: ###-####
|
BLD-Aging Inspection | 5/3/2017 | 5/3/2017 | 5/10/2017 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Foundation | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-#### Conference with builder, all remaining hold downs in place, foundation (mud room/kitchen area) was poured in phases. Last phase was poured without inspection. OK to call for wall bracing inspection.
|
BLD-Foundation | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | NR |
Dave Hannah
|
|
|
Pat Phone #: ###-#### weather to cold and forms are frozen
|
BLD-Foundation | 1/17/2017 | 1/17/2017 | 1/18/2017 | P | CANC |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | CANC |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
Extend Permit 90/180 days | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Jim Storey
|
|
|
ok as noted
|
BLD-Footing | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Jim Storey
|
|
|
Pat Phone #: ###-#### rebar in place apears ground is foozen 25 deg. 3;45 pm with blankes
|
BLD-Footing | 12/15/2016 | 12/16/2016 | 12/16/2016 | P | FAIL |
Phil Shearer
|
|
|
Jose Phone #: ###-####. Average daily temp below 20 deg.
|
PubWorks Subgrade Approval | 12/16/2016 | 12/16/2016 | 12/16/2016 | | DONE |
Jason C. Taylor
|
|
|
***porch, garage, and kitchen areas***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | NR |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
Telephone call | | | 12/15/2016 | | DONE |
|
|
|
Christine calledme - left message on my phone so i called her back-let her know what fees were due for the plan mod-told her it needed paid before the footing inspection can be done-left message on her phone
|
Telephone call | | | 12/15/2016 | | DONE |
|
|
|
called Pat to let know there is a fee due and needs to be paid before inspection can be done-left message on his cell-also call ###-#### and left a message on that phone
|
OVERRIDE | | | 12/13/2016 | | |
|
|
|
|
BLD-Footing | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | NR |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/13/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/8/2016 | | 12/13/2016 | | PASS |
Tisha Gallop
|
|
|
3 hrs plan review fee for plan modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/13/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE
|
Plan assigned to (LEG) Tisha | 11/18/2016 | | 12/13/2016 | | DONE |
Tisha Gallop
|
|
|
**plan modifiation 1st review 11/22; 2nd review 12/7
|
Plan resubmittals received | | | 12/8/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/7/2016 | | 12/7/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/22/2016 | | 11/22/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 11/22/2016 | | 11/22/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/22/2016 | | 11/22/2016 | | PASS |
Jeff Lowe
|
|
|
|
Plan Modification Accepted | | | 11/18/2016 | | |
Christina Prado
|
|
|
Plan Mod to update roof framing & pitch
|
BLD-Footing | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Phil Shearer
|
|
|
Foundation walls
|
BLD-Foundation | 10/27/2016 | 10/27/2016 | 10/27/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | NR |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 10/19/2016 | 10/19/2016 | 10/19/2016 | | DONE |
Jason C. Taylor
|
|
|
* FOOTINGS ONLY NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 9/8/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/7/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan resubmittals received | | | 9/6/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/6/2016 | | 9/6/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/27/2016 | | 9/6/2016 | | DONE |
Tisha Gallop
|
|
|
2nd review 8/24; L2 hillside (plan check)
|
Routing - PLAN CHECK | 8/19/2016 | | 8/24/2016 | | FAIL |
Tisha Gallop
|
|
|
see changemarks
|
Routing PW Grading-Hillside | 8/19/2016 | | 8/24/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 8/22/2016 | | DONE |
|
|
|
|
1st review completed | | | 8/12/2016 | | FAIL |
|
|
|
pending approval by PW Hillside Grading and Plan Check
|
Routing - PLAN CHECK | 7/27/2016 | | 8/12/2016 | | FAIL |
Tisha Gallop
|
|
|
see changemarks in ePlan
|
Routing - PLANNING | 8/1/2016 | | 8/2/2016 | | PASS |
Jeff Lowe
|
|
|
new sheet A1.0 shows compliant setbacks
|
Routing PW Grading-Hillside | 7/27/2016 | | 8/1/2016 | | FAIL |
Jason C. Taylor
|
|
|
Per eplan changemarks. jct
|
Routing - Erosion and Sediment | 7/27/2016 | | 7/29/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative with site map approved. Valid RP and PD designated. Site preparation inspection is REQUIRED, call ###-#### or ###-####
|
Routing - PLANNING | 7/27/2016 | | 7/29/2016 | | FAIL |
Jeff Lowe
|
|
|
Rear setback shall be minimum of 30-feet. Side setback shall be minimum of 10-feet.
|
Routing - FIRE | 7/27/2016 | 7/27/2016 | 7/28/2016 | | PASS |
Katie Marron
|
|
|
This home has been evaluated for FD vehicle access and defensible space. East Birdsong street is being constructed behind this subdivision.
|
Routing - Addressing | 7/27/2016 | | 7/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 7/27/2016 | | 7/28/2016 | | PASS |
Rachael Beierle
|
|
|
NOTES TITLE OF TOWNHOME. CONFIRMED THIS IS CONSIDERED A SFD
|
Routing - MECHANICAL | 7/27/2016 | | 7/28/2016 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 7/27/2016 | | FAIL |
|
|
|
Jason Taylor has informed applicant that he needs grading plans to determine if a CFH is needed.
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/27/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/27/2016 | | DONE |
|
|
|
|
Application received | | | 6/23/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 23 2016 5:05PM
|