Permit Information
Permit NumberBLD16-02316
StatusFinaled
Name SUNRISE DEVELOPMENT LLC
Site Address 3327 E ECHO CT
Project NameLot 4 Block 8 El Paseo
Customer Number 
ePlanReviewYes
Description
WUI Zone A; **12/13/16 Plan modification to change pitch of roof and select window sizes, revised engineering submitted.//leg** Permit for the construction of a new 3182 sq. ft., (first story 2054 sq. ft, basement level 1128 sq. ft.) single family dwelling with 4 bedrooms, 2 bathrooms, 2 half bathrooms, approximately 370 sf. ft. of covered deck/porch and a 779 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1A/DA zoning and setbacks per planning.//leg ****A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/10/201710/10/201710/10/2017PPASS
DetailsBrandon Shaw
Justin Phone #: ###-####
DOC - Permit Finaled10/10/201710/10/201710/10/2017PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval10/9/201710/9/201710/9/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Aging Inspection10/5/201710/5/201710/5/2017 PART
DetailsBrandon Shaw
Work in progress
BLD-Aging Inspection10/4/201710/4/201710/5/2017 DEFR
DetailsBrandon Shaw
BLD-Wall cover5/23/20175/23/20175/23/2017PPASS
DetailsBrandon Shaw
Justin-interior shear wall Phone #: ###-####
CHANGE STATUS TO (ISS)  5/23/2017 DONE
was doc finaled by mistake-no final was done just the energy
BLD-Energy code compliance5/12/20175/12/20175/12/2017PPASS
DetailsBrandon Shaw
Justin Phone #: ###-####
DOC - Permit Finaled5/12/20175/12/20175/12/2017PPASS
DetailsBrandon Shaw
BLD-Framing/Rough-in5/10/20175/11/20175/11/2017APASS
DetailsBrandon Shaw
Justin Phone #: ###-####
BLD-Wall Bracing5/10/20175/11/20175/11/2017APASS
DetailsBrandon Shaw
Shear // Justin Phone #: ###-####
BLD-Aging Inspection5/3/20175/3/20175/10/2017 CANC
DetailsBrandon Shaw
BLD-Foundation5/9/20175/9/20175/9/2017PPASS
DetailsBrandon Shaw
Justin Phone #: ###-####
Conference with builder, all remaining hold downs in place, foundation (mud room/kitchen area) was poured in phases. Last phase was poured without inspection. OK to call for wall bracing inspection.
BLD-Foundation1/18/20171/18/20171/18/2017PNR
DetailsDave Hannah
Pat Phone #: ###-#### weather to cold and forms are frozen
BLD-Foundation1/17/20171/17/20171/18/2017PCANC
DetailsDave Hannah
Pat Phone #: ###-####
BLD-Foundation1/13/20171/13/20171/13/2017PCANC
DetailsPhil Shearer
Pat Phone #: ###-####
Extend Permit 90/180 days12/20/201612/20/201612/20/2016PPART
DetailsJim Storey
ok as noted
BLD-Footing12/20/201612/20/201612/20/2016PPART
DetailsJim Storey
Pat Phone #: ###-#### rebar in place apears ground is foozen 25 deg. 3;45 pm with blankes
BLD-Footing12/15/201612/16/201612/16/2016PFAIL
DetailsPhil Shearer
Jose Phone #: ###-####. Average daily temp below 20 deg.
PubWorks Subgrade Approval12/16/201612/16/201612/16/2016 DONE
DetailsJason C. Taylor
***porch, garage, and kitchen areas***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing12/15/201612/15/201612/15/2016PNR
DetailsPhil Shearer
Pat Phone #: ###-####
Telephone call  12/15/2016 DONE
Christine calledme - left message on my phone so i called her back-let her know what fees were due for the plan mod-told her it needed paid before the footing inspection can be done-left message on her phone
Telephone call  12/15/2016 DONE
called Pat to let know there is a fee due and needs to be paid before inspection can be done-left message on his cell-also call ###-#### and left a message on that phone
OVERRIDE  12/13/2016  
BLD-Footing12/13/201612/13/201612/13/2016PNR
DetailsPhil Shearer
Pat Phone #: ###-####
CHANGE STATUS TO (ISS)  12/13/2016 DONE
Routing - PLAN CHECK12/8/2016 12/13/2016 PASS
DetailsTisha Gallop
3 hrs plan review fee for plan modification
PLANS/APPL TAKEN TO FRONT DESK  12/13/2016 DONE
Permit Ready to Issue  12/13/2016 DONE
DO NOT RE-ISSUE
Plan assigned to (LEG) Tisha11/18/2016 12/13/2016 DONE
DetailsTisha Gallop
**plan modifiation 1st review 11/22; 2nd review 12/7
Plan resubmittals received  12/8/2016 DONE
Plan resubmittals received  12/7/2016 DONE
Routing - PLAN CHECK12/7/2016 12/7/2016 FAIL
DetailsTisha Gallop
Routing - PLAN CHECK11/22/2016 11/22/2016 FAIL
DetailsTisha Gallop
Routing - MECHANICAL11/22/2016 11/22/2016 PASS
DetailsTroy James
Routing - PLANNING11/22/2016 11/22/2016 PASS
DetailsJeff Lowe
Plan Modification Accepted  11/18/2016  
DetailsChristina Prado
Plan Mod to update roof framing & pitch
BLD-Footing11/10/201611/14/201611/14/2016APASS
DetailsPhil Shearer
Foundation walls
BLD-Foundation10/27/201610/27/201610/27/2016PPASS
DetailsPhil Shearer
BLD-Footing10/19/201610/19/201610/19/2016PNR
DetailsPhil Shearer
Pat Phone #: ###-####
PubWorks Subgrade Approval10/19/201610/19/201610/19/2016 DONE
DetailsJason C. Taylor
* FOOTINGS ONLY NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  9/8/2016 DONE
Inspection Record Card- Bld  9/8/2016 DONE
OVERRIDE  9/7/2016  
Permit Ready to Issue  9/7/2016 DONE
DetailsChristina Prado
All requirements met
Plan resubmittals received  9/6/2016 DONE
Routing - PLAN CHECK9/6/2016 9/6/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  9/6/2016 DONE
Plan assigned to (LEG) Tisha7/27/2016 9/6/2016 DONE
DetailsTisha Gallop
2nd review 8/24; L2 hillside (plan check)
Routing - PLAN CHECK8/19/2016 8/24/2016 FAIL
DetailsTisha Gallop
see changemarks
Routing PW Grading-Hillside8/19/2016 8/24/2016 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  8/22/2016 DONE
1st review completed  8/12/2016 FAIL
pending approval by PW Hillside Grading and Plan Check
Routing - PLAN CHECK7/27/2016 8/12/2016 FAIL
DetailsTisha Gallop
see changemarks in ePlan
Routing - PLANNING8/1/2016 8/2/2016 PASS
DetailsJeff Lowe
new sheet A1.0 shows compliant setbacks
Routing PW Grading-Hillside7/27/2016 8/1/2016 FAIL
DetailsJason C. Taylor
Per eplan changemarks. jct
Routing - Erosion and Sediment7/27/2016 7/29/2016 PASS
DetailsAndy J. Long
ESC narrative with site map approved. Valid RP and PD designated. Site preparation inspection is REQUIRED, call ###-#### or ###-####
Routing - PLANNING7/27/2016 7/29/2016 FAIL
DetailsJeff Lowe
Rear setback shall be minimum of 30-feet. Side setback shall be minimum of 10-feet.
Routing - FIRE7/27/20167/27/20167/28/2016 PASS
DetailsKatie Marron
This home has been evaluated for FD vehicle access and defensible space. East Birdsong street is being constructed behind this subdivision.
Routing - Addressing7/27/2016 7/28/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS7/27/2016 7/28/2016 PASS
DetailsRachael Beierle
NOTES TITLE OF TOWNHOME. CONFIRMED THIS IS CONSIDERED A SFD
Routing - MECHANICAL7/27/2016 7/28/2016 PASS
DetailsTroy James
Intake Approval  7/27/2016 FAIL
Jason Taylor has informed applicant that he needs grading plans to determine if a CFH is needed.
Plans ACCEPTED BY PLAN TECH  7/27/2016 DONE
Intake Approval  7/27/2016 PASS
Recd Pcfee & Taken To Pln CK  7/27/2016 DONE
Application received  6/23/2016 DONE
Application submitted via PDS Online on Jun 23 2016 5:05PM