Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-02330
StatusFinaled
Name DOWNEY CONSTRUCTION INC
Site Address 1812 S ABBS ST
Project Name 
Customer NumberDRH16-00089
ePlanReviewNo
Description
DRH16-00089; Permit for the construction of a new 1713 sq. ft., two story (first story 978 sq. ft., second story 735 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 145 sq. ft. of covered patio/porch and a 437 sq. ft. detached garage per the approved plans, engineering, ResCheck, ACCA report and any notations. R-1C zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/201612/1/201612/1/2016PPASS
DetailsJim Storey
Josh Phone #: ###-####
DOC - Permit Finaled12/1/201612/1/201612/1/2016PPASS
DetailsJim Storey
BLD-Energy code compliance8/31/20169/1/20169/1/2016APASS
DetailsJim Storey
Josh Phone #: ###-####
BLD-Framing/Rough-in8/30/20168/30/20168/31/2016PPASS
DetailsDave Hannah
Josh Phone #: ###-####
BLD-Wall Bracing8/22/20168/22/20168/22/2016PPASS
DetailsJim Storey
Josh// fire soffit and shear wall Phone #: ###-####
BLD-Wall Bracing8/19/20168/19/20168/19/2016PNR
DetailsJim Storey
jOSH Phone #: ###-#### no plans
BLD-Foundation7/14/20167/15/20167/15/2016PPASS
DetailsJim Storey
Matt Phone #: ###-####
BLD-Footing7/12/20167/13/20167/13/2016APASS
DetailsJim Storey
Matt Phone #: ###-####
BLD-Footing7/12/20167/12/20167/12/2016PDEFR
DetailsJim Storey
Matt Phone #: ###-####
OVERRIDE  7/7/2016  
Inspection Record Card- Bld  7/7/2016 DONE
Telephone call  7/7/2016 DONE
called Kevin to let know permits are ready and how much is owed
Issue PAID IN FULL permit  7/7/2016 DONE
Permit Ready to Issue  7/7/2016 DONE
All Met
Plan assigned to (LEG) Tisha6/24/2016 7/6/2016 DONE
DetailsTisha Gallop
7/7
Routing - PLAN CHECK6/29/2016 7/6/2016 PASS
DetailsTisha Gallop
1st review completed  7/6/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/6/2016 DONE
Case Summary (BLD)  7/6/2016 DONE
Routing - MECHANICAL6/27/2016 6/29/2016 PASS
DetailsTroy James
Routing - PLANNING6/24/2016 6/27/2016 PASS
DetailsAndrea Tuning
Plans have been redlined to require a 5-foot concrete sidewalk on Abbs Street and require a 20-foot front setback from Abbs Street.
Routing - Addressing6/24/2016 6/24/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/24/2016 6/24/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  6/24/2016 DONE
Intake Approval  6/24/2016 PASS
Recd Pcfee & Taken To Pln CK  6/24/2016 DONE
Application received 6/24/2016