Fees Due Hold | 7/26/2016 | | 8/8/2016 | | DONE |
|
|
|
|
BLD-Final | 7/25/2016 | 7/25/2016 | 7/26/2016 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | PASS |
Jim Sly
|
|
|
|
Telephone call | | | 7/25/2016 | | DONE |
|
|
|
called Mike to let know there is still a fee due on this permit for changing the permit to demo of the whole home-left message on his phone that the amount needs paid before the bond can be released
|
BLD-Other | 7/11/2016 | 7/11/2016 | 7/12/2016 | P | DONE |
Bob Archibald
|
|
|
Mike-set bond for demolition Phone #: ###-####. $2500.00 demo bond required to remove remaining structure.
|
Meeting | | | 7/11/2016 | | DONE |
|
|
|
as per Bob A. ok to do other inspection to set bond. $2500.00 is the bond amount
|
BLD-Footing | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
OVERRIDE | | | 6/27/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/27/2016 | 6/27/2016 | 6/27/2016 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 6/27/2016 | 6/27/2016 | 6/27/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/27/2016 | | 6/27/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/27/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2016 | | DONE |
|
|
|
|
Application received | | 6/27/2016 | | | |
|
|
|
|