BLD-Final | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
DOC - Permit Finaled | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/11/2017 | 1/12/2017 | 1/12/2017 | A | NR |
Jim Sly
|
|
|
Todd Phone #: ###-#### Need Mech final.
|
BLD-Energy code compliance | 11/2/2016 | 11/3/2016 | 11/3/2016 | A | PASS |
Jim Sly
|
|
|
Insulation // Todd Phone #: ###-####
|
BLD-Wall Bracing | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Wall Bracing | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | CANC |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | CANC |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | NR |
Jim Sly
|
|
|
Todd Phone #: ###-#### No inspections will be performed until erosion control corrections have been completed and approved. Notified Todd.
|
BLD-Wall Bracing | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | NR |
Jim Sly
|
|
|
Todd Phone #: ###-#### Just Checked garage front..........No nailing....Not ready.
|
BLD-Foundation | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Jim Sly
|
|
|
Manny Phone #: ###-####
|
BLD-Footing | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PASS |
Mike Jordan
|
|
|
Manny Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/12/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/12/2016 | | |
|
|
|
|
OVERRIDE | | | 8/11/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 6/28/2016 | 6/28/2016 | 8/11/2016 | | DONE |
Brian McGowan
|
|
|
Due 7-8 ePlan - FAIL - BWL for Wall Bracing need to be specified and calculations for the required amount of bracing need to be provided.
|
Routing - PLAN CHECK | 8/11/2016 | | 8/11/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/11/2016 | | DONE |
|
|
|
MET
|
1st review completed | | | 7/6/2016 | | FAIL |
Brian McGowan
|
|
|
BWL for Wall Bracing need to be specified and calculations for the required amount of bracing need to be provided.
|
Routing - PLAN CHECK | 6/27/2016 | | 7/6/2016 | | FAIL |
Brian McGowan
|
|
|
BWL for Wall Bracing need to be specified and calculations for the required amount of bracing need to be provided.
|
Routing - MECHANICAL | 6/27/2016 | | 6/30/2016 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 6/27/2016 | | 6/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Plan assigned to (LEG) Tisha | 6/27/2016 | | 6/28/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | | 6/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2016 3:29PM
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/27/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/27/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2016 | | 6/27/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 6/27/2016 | | 6/27/2016 | | PASS |
Jeff Lowe
|
|
|
Driveway edge needs to be 50-feet from public road intersection.
|