VOIDED CHANGE STATUS | | | 6/14/2017 | | DONE |
|
|
|
Per Burl Ackerman work is not being done
|
Telephone call | | | 6/13/2017 | | DONE |
|
|
|
Spoke with Burl and he stated they are going to let the permit expire/void
|
Expiration Notice | 5/30/2017 | 6/20/2017 | 5/30/2017 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 1/18/2017 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Telephone call | | | 1/4/2017 | | DONE |
|
|
|
Spoke with Burl letting him know I never recieved an email requesting for a 180 day extension. He stated he would forward it to me, must have wrote the email down wrong
|
Telephone call | | | 12/22/2016 | | DONE |
|
|
|
Spoke with Burl informing him that this permit is going to expire on the 24th at 5pm. Gave him my email, the permit # and said to address the letter to Adele to request the 180 day extension.
|
BLD-Conference | 12/21/2016 | 12/21/2016 | 12/21/2016 | P | PEND |
Tony Young
|
|
|
PLEASE DO NOT VOID OR EXPIRE PERMIT. Just need to know if work is being done, permit is going to expire 12/24/16/// no work has been done..
|
Telephone call | | | 12/16/2016 | | DONE |
|
|
|
Left a message for Burl informing him that this permit is going to expire in 9 days and just need to know if the project is going to happen or if the permit needs to be voided. Also informed him that if he is just not ready to pick the permit up he is welcome to send in a request for a 180 day extension
|
Expiration Notice | 12/2/2016 | 12/23/2016 | 12/2/2016 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 10/27/2016 | | DONE |
|
|
|
GC Matt Brown in office with insultion question. Need air-impermeable insulation in contact with underside of roof deck and along blocing to create the envelope. Per ES report provide minimum thickness to qualify as air-impermeable insulation per IRC code is 3 inches. Can fill rest of rafter cavity with blow-in insulation to reach r-value needed.
|
OVERRIDE | | | 8/2/2016 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/2/2016 | | DONE |
|
|
|
all reuirements met
|
Plan assigned to (LEG) Tisha | 6/30/2016 | | 8/2/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 7/21; plan check, planning
|
Routing PW Grading-Hillside | 7/27/2016 | | 8/1/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING | 7/27/2016 | | 7/28/2016 | | PASS |
Jeff Lowe
|
|
|
|
Plan resubmittals received | | | 7/27/2016 | | DONE |
|
|
|
eplan
|
Routing - PLAN CHECK | 7/27/2016 | | 7/27/2016 | | PASS |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/21/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/30/2016 | | 7/21/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 6/30/2016 | | 7/13/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 7/8/2016 | 7/8/2016 | 7/8/2016 | | PASS |
Katie Marron
|
|
|
Documentation submitted that home will be fire sprinklered. Revised report attached to case.
|
Routing - Erosion and Sediment | 6/30/2016 | | 7/6/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Need to designate valid RP
|
Routing - FIRE | 6/30/2016 | 6/30/2016 | 7/5/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to applicant.
|
Routing - PLANNING | 6/30/2016 | | 7/5/2016 | | FAIL |
Jeff Lowe
|
|
|
rear patio is greater than one-foot above finished grade and extends into rear yard area
|
Routing - Addressing | 6/30/2016 | | 6/30/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/30/2016 | | 6/30/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 6/30/2016 | | 6/30/2016 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/30/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/30/2016 | | DONE |
|
|
|
|
Intake Approval | | | 6/29/2016 | | FAIL |
Christina Prado
|
|
|
Need ResCheck, R values on plans and stamped structural plans
|
Application received | | | 6/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2016 6:46PM
|