BLD-Final | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | NR |
Dave Hannah
|
|
|
Eric Phone #: ###-#### needs co2 detectors on all levels
|
BLD-Energy code compliance | 9/12/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Dave Hannah
|
|
|
Chad Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2016 | 9/12/2016 | 9/13/2016 | A | PASS |
Dave Hannah
|
|
|
Call for access // Chad Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/19/2016 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 6/30/2016 | 6/30/2016 | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/30/2016 | | 7/6/2016 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2016 | | DONE |
|
|
|
called Eric- left message that permit is ready and fees due
|
Plan resubmittals received | | | 6/30/2016 | | DONE |
|
|
|
received one copy of upper level plan, main level plan, and basement plan- gave to Brian
|
Routing Walk-In (BLD) | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | FAIL |
Brian McGowan
|
|
|
Needed to size a header for the increased opening for the future egress window he wants to install. The header needs to carry a concrete garage floor, trusses, wall and ???
He said he has the original construction plans and will bring them in with the floor plan sketches, new window size, header call out.
BJM
|
Application received | | 6/28/2016 | | | |
|
|
|
|