BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Tell Riley
|
|
|
Joe Phone #: ###-####//added fire separation per Jim Sly at attic separation--ok//plans show exisitng door to remain-had them add self closing hinges//final complete per plans//
|
DOC - Permit Finaled | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PART |
Tell Riley
|
|
|
Joe Phone #: ###-####//smoke detectors, co detectors installed in basement--existing in upstairs//add self closing hinges to exisitng door//Joe will call in reinspection for door for AM//
|
BLD-Framing/Rough-in | 10/20/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Jim Sly
|
|
|
Framing Inspection to cover. Please call ###-#### or ###-#### to ensure contractor is onsite. Phone #: ###-#### Inspection requested via web by Jeremy Rausch LEFT NOTE....call me back about house/garage separation.
|
Routing Walk-In (Zoning) | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/1/2016 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2016 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/1/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/1/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/1/2016 | | DONE |
|
|
|
|
Application received | | 7/1/2016 | | | |
|
|
|
|