Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-02412
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 8509 W POCONO ST
Project NameSilverCloud Apartments
Customer NumberBLD16-02408 - BLD16-02418
ePlanReview 
Description
(SILVERCLOUD APARTMENTS – BUILDING #3-1 – 4 APARTMENTS – TYPES C, B1, B1, C) (DRH16-00080) (PUD16-00003) (11 PERMITS ARE FILED UNDER BLD16-02408 IN EPLANREVIEW) The NFPA 13R fire sprinkler system is used for occupancy. To construct a 2 story apartment building having 4 side-by-side 2 story dwelling units. The dwelling units do not comply as townhomes as defined by the Boise City Code because there are no property lines between them and because the utilities are not separate. This building has a total floor area of about 7,646 square feet (4,429 square feet 1st story and 3,217 square feet 2nd story). Each dwelling unit has 2 stories. None of the dwelling units are required to comply as Type B dwelling units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior walls, exterior siding, shear walls, wood joist 2nd story floors, doors, windows, interior stairways, gas fireplaces, wood truss roof, roof coverings, millwork, and finishes. Engineered wood trusses are a deferred submittal item. Special Inspection is required for soils, shear walls, diaphragms, concrete, and post-installed anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval2/8/20192/8/20192/8/2019 DONE
DetailsTiffany Lowery
Permanent Occupancy  2/8/2019 DONE
Print Occupancy Form  2/5/2019 DONE
BLD-Aging Inspection1/14/20191/14/20191/15/2019 PEND
DetailsTony Young
Zoning Approval11/28/201811/28/201811/28/2018 DONE
DetailsAndrea Tuning
BLD-Aging Inspection11/12/201811/12/201811/13/2018 PEND
DetailsTony Young
Temporary Occupancy11/5/20182/3/201911/5/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 90 day Temp C of O from expiration date
Telephone call  10/30/2018 DONE
called Mike to let know temp c of o is going to expire 11/2/18-he will contact Jason Blais if another extention is required
BLD-Aging Inspection9/10/20189/10/20189/17/2018 PEND
DetailsTony Young
Temporary Occupancy8/8/201811/6/20188/8/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 90 day ext of temp c of o starting from 8/4/18
Telephone call  8/7/2018 DONE
Called Mike 8-6-18 to let know that he needs to extend his temp C of O-he will email Jason B
BLD-Aging Inspection7/9/20187/9/20187/9/2018 PEND
DetailsTony Young
Temporary Occupancy5/31/20188/29/20185/31/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd all 11 permits for Silve Cloud Apartments to have the same temp c of o expiration date
BLD-Aging Inspection5/7/20185/7/20185/8/2018 PEND
DetailsTony Young
Temporary Occupancy4/13/20187/12/20184/13/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd ext on the temp C of O
BLD-Final3/7/20183/8/20183/8/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Aging Inspection2/20/20182/20/20182/22/2018 PEND
DetailsTony Young
BLD-Final12/19/201712/19/201712/19/2017PPEND
DetailsJim Sly
See previous notes.
BLD-Aging Inspection12/18/201712/18/201712/19/2017 CANC
DetailsJim Sly
Temporary Occupancy12/7/20173/7/201812/7/2017 DONE
DetailsCandy A. Nichols
as per Jason Blais extension for temp c of o granted
BLD-Final10/17/201710/17/201710/18/2017PPART
DetailsTony Young
Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Mike McHargue
Temporary Occupancy10/18/20171/16/201810/18/2017 DONE
DetailsChristina Prado
FIRE-Final Inspection10/17/201710/17/201710/17/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, final life fire safety inspection passed/complete.
PubWorks Temp Occupancy Appr9/8/20179/8/20179/8/2017 DONE
DetailsTiffany Lowery
Zoning Approval Temp9/1/20179/1/20179/1/2017 DONE
DetailsAndrea Tuning
BLD-Wall Bracing7/10/20177/10/20177/10/2017PPASS
DetailsTony Young
Interior Sheer Inspection Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance6/27/20176/28/20176/28/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Wall cover6/26/20176/27/20176/27/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance6/26/20176/27/20176/27/2017APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Mike McHargue,, lots of wind,, blew out some areas,, ok after replacing
BLD-Framing/Rough-in6/22/20176/23/20176/23/2017APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Mike McHargue
FIRE-Sprinkler Rough-in6/23/20176/23/20176/23/2017PCANC
DetailsJim Page
Comments for Fire Sprinkler Tenting Inspection Under Permit FIR16-00790
BLD-Wall Bracing5/25/20175/25/20175/25/2017PPASS
DetailsMike Jordan
Exterior sheer inspection. Mid-late Afternoon if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Footing3/23/20173/24/20173/24/2017APASS
DetailsTony Young
Interior slab thickened footing Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance3/8/20173/8/20173/9/2017PPASS
DetailsTony Young
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance3/7/20173/8/20173/8/2017ACANC
DetailsTony Young
foundation insulation - mid to late morning if possible Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Energy code compliance3/7/20173/8/20173/7/2017PCANC
DetailsTony Young
Foundation Insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Foundation3/3/20173/6/20173/6/2017PPASS
DetailsTony Young
Manual Phone #: ###-####
BLD-Footing3/2/20173/2/20173/2/2017PPASS
DetailsMike Jordan
Dane Phone #: ###-####
Print Occupancy Form  3/1/2017 DONE
Issue PAID IN FULL permit  2/28/2017 DONE
Print Occupancy Form  2/28/2017 DONE
Extend Review Timeline  12/14/2016 DONE
1st approved extension per Adele. See documents
Place hold on job10/19/2016 12/12/2016 DONE
DetailsCandy A. Nichols
as per Jason B ok to pick one up at a time-must have the ACHD letter when they come in
Expiration Notice12/5/201612/27/201612/5/2016 DONE
DetailsBrittany Hill
Plan assigned to (CJW)7/13/20167/13/201610/18/2016 PASS
DetailsCarl Westfall
(1st done)
PLANS/APPL TAKEN TO FRONT DESK  10/18/2016 DONE
Permit Ready to Issue  10/18/2016 DONE
Needs; ACHD ***MET 10-19-16*** RP, GC Form, Revised Cert of Value
***PWK PERMITS ARE ALL WITH THE GRADING PERMITS PER BRIAN MURPHY**
Routing PW Sewer Design10/13/2016 10/17/2016 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage10/13/2016 10/13/2016 PASS
DetailsBrian Murphy
Routing - PLAN CHECK10/12/2016 10/13/2016 PASS
DetailsCarl Westfall
Approved structural
Routing Off Site - STRUCTURAL10/13/2016 10/13/2016 PASS
DetailsCarl Westfall
(Jan Welch)
Plan resubmittals received  10/12/2016 DONE
Plan resubmittals requested  10/4/2016 DONE
Routing Off Site - STRUCTURAL9/23/2016 10/4/2016 FAIL
DetailsCarl Westfall
(Jan Welch)
Routing - PLAN CHECK9/23/2016 10/4/2016 PEND
DetailsCarl Westfall
Waiting for the 3rd structural review to be completed
Routing - PUBLIC WORKS9/28/2016 9/28/2016 PASS
DetailsBrian Murphy
DRAINAGE ONLY
Plan Reviewer's activity  9/28/2016 DONE
Uploaded a lot of drawings that were Emailed
Routing PW Drainage9/23/2016 9/27/2016 FAIL
DetailsBrian Murphy
Routing PW Sewer Design9/23/2016 9/23/2016 FAIL
DetailsKyle S. Rosenmeyer
Currently reviewing sewer extension.
Plan resubmittals received  9/22/2016 DONE
Plan resubmittals requested  9/9/2016 DONE
Routing PW Drainage8/30/2016 9/9/2016 FAIL
DetailsBrian Murphy
Routing - PLAN CHECK8/30/2016 9/9/2016 PEND
DetailsCarl Westfall
Waiting for the 2nd structural review to be completed
Routing Off Site - STRUCTURAL8/30/2016 9/8/2016 FAIL
DetailsCarl Westfall
Jan Welch
Routing PW Sewer Design8/30/2016 9/8/2016 FAIL
DetailsKyle S. Rosenmeyer
Routing - PLANNING8/30/2016 9/7/2016 PASS
DetailsLeon Letson
Routing - MECHANICAL9/6/2016 9/6/2016 PASS
DetailsTroy James
Routing - MECHANICAL8/30/2016 9/2/2016 FAIL
DetailsTroy James
Routing - Design Review8/30/2016 9/2/2016 PASS
DetailsAndrea Tuning
Routing - PUBLIC WORKS8/30/2016 8/31/2016 PASS
DetailsRachael Beierle
Routing - Addressing8/30/2016 8/31/2016 PASS
DetailsLaura Hunter
Must have monuments clearly displayed at both entrances with all addresses mapped out
Routing PW Sewer Rating8/30/2016 8/31/2016 PASS
DetailsRachael Beierle
Plan resubmittals received  8/29/2016 DONE
Route to Impact Fee Review8/15/20168/18/20168/15/2016 PASS
DetailsStephanie Jensen
1st review completed  8/15/2016 DONE
Plan resubmittals requested  8/15/2016 DONE
Routing - PLAN CHECK7/13/2016 8/15/2016 FAIL
DetailsCarl Westfall
Telephone call  7/29/2016 DONE
Talked to James Glancey. Told him I would be out of the office until August 8. We still expect to meet the 6 month 1st review turnaround which would be August 22. Informed him about the structural review in the Agency Comments folder so his engineer could get started. Structural must be resolved before any footing and foundation permit could be issued.
Routing Off Site - STRUCTURAL7/13/2016 7/27/2016 FAIL
DetailsCarl Westfall
Jan Welch
Routing PW Drainage7/13/2016 7/21/2016 FAIL
DetailsBrian Murphy
Routing - MECHANICAL7/13/2016 7/20/2016 FAIL
DetailsTroy James
Routing - Design Review7/13/2016 7/19/2016 FAIL
DetailsAndrea Tuning
Provide 5 accessible parking spaces on the site. One of these spaces must be van accessible.
Provide 6 Class III trees on Bogart, 16 Class III trees on Pocono and 11 Class III trees on Goodyear.
Routing - PLUMBING7/13/2016 7/18/2016 PASS
DetailsBill VanDegrift
Routing - PLANNING7/13/2016 7/18/2016 PASS
DetailsBill VanDegrift
Routing - PLANNING Land Div7/13/2016 7/18/2016 PASS
DetailsTodd Tucker
Routing - Erosion and Sediment7/13/2016 7/18/2016 PASS
DetailsAndy J. Long
Routing PW Sewer Rating7/13/2016 7/15/2016 FAIL
DetailsRachael Beierle
Routing - Addressing7/13/2016 7/15/2016 FAIL
DetailsLaura Hunter
Must have private road names for addressing
Routing - PUBLIC WORKS7/13/2016 7/15/2016 FAIL
DetailsRachael Beierle
Routing - FIRE7/13/20167/13/20167/13/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing PW Sewer Design7/13/2016 7/13/2016 FAIL
DetailsKyle S. Rosenmeyer
Plans being reviewed under separate submittal to Public Works department for public sewer extension.
Routing PW Street Lights7/13/2016 7/13/2016 PASS
DetailsTom Marshall
Routing PW Solid Waste7/13/2016 7/13/2016 PASS
DetailsPeter J. McCullough
Intake Approval  7/12/2016 PASS
DetailsTim L. Woodard
Application received  7/1/2016 DONE
Application submitted via PDS Online on Jul 1 2016 10:12AM
First Notice 2/18/2019