Permanent Occupancy | | | 3/11/2019 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 3/8/2019 | 3/8/2019 | 3/8/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 3/6/2019 | 3/6/2019 | 3/6/2019 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 2/25/2019 | 2/25/2019 | 2/25/2019 | | PASS |
Jim Storey
|
|
|
Jason Blais ok'd ext req for 90 days from 1/4/19
|
Temporary Occupancy | 1/8/2019 | 4/8/2019 | 1/8/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd ext req for 90 days from 1/4/19
|
Temporary Occupancy | 1/7/2019 | 4/7/2019 | 1/7/2019 | | DONE |
Candy A. Nichols
|
|
|
was expired by mistake-temp c of o good through 1/4/19-
|
Telephone call | | | 1/7/2019 | | DONE |
|
|
|
called David to let know Temp C of O is expired-changed status from expired to TEMP-not sure why it was changed to EXP before the Temp date was here-David will email Jason Blais to extend this one out to match the other permits on this project
|
BLD-Aging Inspection | 12/24/2018 | 12/24/2018 | 12/24/2018 | | DONE |
Jim Storey
|
|
|
Jason Blais ok'd 90 day ext from 10/16/18
|
DOC - Permit Expired | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | PASS |
Jim Storey
|
|
|
Jason Blais ok'd 90 day ext from 10/16/18
|
BLD-Aging Inspection | 10/22/2018 | 10/22/2018 | 10/23/2018 | | PASS |
Jim Storey
|
|
|
|
Temporary Occupancy | 10/17/2018 | 1/15/2019 | 10/17/2018 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 10/17/2018 | 1/15/2019 | 10/17/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 90 day ext from 10/16/18
|
Telephone call | | | 10/15/2018 | | DONE |
|
|
|
called David to let know Temp C of O expires 10/6/16-left message for him to request an inspection if needed or to please call in his P&Z and PW inspection
|
BLD-Aging Inspection | 8/20/2018 | 8/20/2018 | 8/20/2018 | | PASS |
Jim Storey
|
|
|
|
Temporary Occupancy | 7/18/2018 | 10/16/2018 | 7/18/2018 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### cn made ok final ok no card on site.
|
BLD-Final | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | FAIL |
Jim Storey
|
|
|
Dave Phone #: ###-#### / c/n // max height egrees windows 44 inches uints 103/104/105/102// floor joist need resupported uints 101/102/104/105 at crawl access.
|
FIRE-Final Inspection | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place under sink cabinets with curent inspection tags, knox box is located by the fire sprinkler riser room. Final life fire safety inspection complete.
Dave Phone #: ###-####
|
BLD-Energy code compliance | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PART |
Jim Storey
|
|
|
Dave Phone #: ###-####joist bearing repair center unit west plm/ finsh air seal
|
BLD-Wall Bracing | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | CANC |
Jim Storey
|
|
|
Shear // Dave Phone #: ###-####
|
BLD-Aging Inspection | 9/8/2017 | 9/8/2017 | 9/14/2017 | | CANC |
Jim Storey
|
|
|
|
BLD-Foundation | 4/26/2017 | 4/27/2017 | 4/27/2017 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 4/25/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/8/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/7/2016 | | DONE |
|
|
|
***all requirments met 11-7-16 /CEV
need ACHD ***GC FORM WAS PLACED IN 8-3-16. RP done 11-7-16 blh***
|
Place hold on job | 11/7/2016 | | 11/7/2016 | | DONE |
Carlos Velazquez
|
|
|
DO NOT ISSUE WITHOUT BLD16-02420 TO BLD16-02430
|
Plan assigned to (CDM) | 7/14/2016 | 7/14/2016 | 11/3/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PUBLIC WORKS | 10/19/2016 | | 11/3/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing Off Site - STRUCTURAL | 10/19/2016 | | 11/3/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2016 | | DONE |
|
|
|
|
Routing PW Solid Waste | 9/26/2016 | | 11/3/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 9/26/2016 | | 11/3/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 10/19/2016 | | 11/3/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 10/19/2016 | | 10/21/2016 | | PASS |
Susan Riggs
|
|
|
|
Routing - Design Review | 10/19/2016 | | 10/19/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Sewer Design | 10/19/2016 | | 10/19/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing Off Site - STRUCTURAL | 9/23/2016 | | 10/7/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/23/2016 | | 10/7/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 9/23/2016 | | 10/6/2016 | | FAIL |
Susan Riggs
|
|
|
I can't sign off until they bond for the amenities. I spoke to applicant (Dave) on Monday and he said he was going to come in.
|
Routing PW Sewer Design | 9/26/2016 | | 10/6/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Include current Utility Drawings.
|
Routing - PLUMBING | 9/23/2016 | | 9/29/2016 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - Addressing | 9/23/2016 | | 9/26/2016 | | PASS |
Laura Hunter
|
|
|
3594 E Grand Forest Dr, Apt 101-106
|
Routing - PUBLIC WORKS | 9/23/2016 | | 9/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 9/23/2016 | | 9/26/2016 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 8/6/2016 | 8/9/2016 | 8/11/2016 | | PASS |
Stephanie Jensen
|
|
|
|
Routing Off Site - STRUCTURAL | 7/14/2016 | | 8/6/2016 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/6/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/14/2016 | | 8/6/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 7/14/2016 | | 7/21/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 7/14/2016 | | 7/19/2016 | | FAIL |
Bill VanDegrift
|
|
|
|
Routing - PLANNING | 7/14/2016 | | 7/19/2016 | | FAIL |
Susan Riggs
|
|
|
Common lot amenities shall be constructed of bonded for prior to the issuance of the first building permit for a residential structure.
The applicant stated he would relocate the air conditioning units for building A (3 & 4) to the rear or side of these two buildings and this has not been done.
|
Routing - Design Review | 7/14/2016 | | 7/19/2016 | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to provide an effective landscape barrier to the east and provide 9 street trees on Quamash Drive that are equally spaced. Also, the are required to provied 48 bicycle parking spaces wtih 12 of them being covered. A detail of the bike rack and the covering mechanism is required.
|
Routing - Erosion and Sediment | 7/14/2016 | | 7/19/2016 | | PASS |
Andy J. Long
|
|
|
|
Routing - FIRE | 7/14/2016 | 7/14/2016 | 7/18/2016 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Routing - PLANNING Land Div | 7/14/2016 | | 7/18/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 7/14/2016 | | 7/15/2016 | | FAIL |
Laura Hunter
|
|
|
Must have private streets for addressing
|
Routing - PUBLIC WORKS | 7/14/2016 | | 7/15/2016 | | FAIL |
Rachael Beierle
|
|
|
|
Intake Approval | | | 7/14/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 7/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 1 2016 1:45PM
|
First Notice | | 3/21/2019 | | | |
|
|
|
|