BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Call for garage code- Brett Phone #: ###-####
|
DOC - Permit Finaled | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 11/26/2019 | 11/26/2019 | 11/26/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PART |
Brandon Shaw
|
|
|
Temp Occ. is ok'd pending PW approval for driveway drainage, All Final appovals to be completed by 11Oct2019...
|
BLD-Conference | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | NR |
Tony Young
|
|
|
Cleve Phone #: ###-####,, needs hillside, fire sprinkler pass,, guardrail on upper deck openings less than 4", trades, blower door test results, fire caulking
|
BLD-Aging Inspection | 10/25/2018 | 10/25/2018 | 10/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/24/2018 | 10/24/2018 | 10/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/8/2018 | 6/8/2018 | 6/12/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/7/2018 | 6/7/2018 | 6/12/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/23/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####,, brace trusses,, ok to insulate
|
BLD-Wall cover | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | PASS |
Tony Young
|
|
|
Kevin-soffit Phone #: ###-####,, soffits ok to cover
|
BLD-Framing/Rough-in | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | NR |
Tony Young
|
|
|
Kevin-soffit Phone #: ###-####,, conf only,, needs trades
|
BLD-Wall Bracing | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PART |
Jim Storey
|
|
|
exterior shear wall to cover & fire soffits for WUI // Kevin Phone #: ###-#### walls exterior ok to cover soffits wrong light protection.
|
Telephone call | | | 12/4/2017 | | DONE |
|
|
|
Emailed the permit applicant informing them of the requirement to obtain a fire protection sprinkler permit. Email sent to steve@rothhomes.com.
Mr. Roth,
I am contacting you today regarding the project being constructed under BLD16-02440 which is required to be fire sprinklered in accordance with NFPA 13D. As of today’s date, 12/4/2017, the City of Boise Building Division has not received an application for the installation of the required fire protection system for this single family residence.
In order to avoid undue delay in final City Approval of this project, please ensure that your selected subcontractor obtains the required permit and approval of the fire protection system design etc.
Applications can be obtained at the City of Boise Planning and Development Services department, located on the 2nd floor at 150 north Capitol Blvd; or online.
|
BLD-Foundation | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | PASS |
Dave Hannah
|
|
|
wall // Mana Phone #: ###-####
|
BLD-Footing | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Tony Young
|
|
|
Mana Phone #: ###-####
|
PubWorks Subgrade Approval | 10/11/2017 | 10/20/2017 | 10/20/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PEND |
Tony Young
|
|
|
Mana Phone #: ###-####,, still need soils approval
|
BLD-Footing | 10/17/2017 | 10/18/2017 | 10/18/2017 | P | PEND |
Tony Young
|
|
|
Mana Phone #: ###-####,, front retyaining wall for driveway,, ok pending soils approval
|
BLD-Conference | 10/17/2017 | 10/18/2017 | 10/18/2017 | A | PART |
Tony Young
|
|
|
Cleve Phone #: ###-####,, frame ?s
|
BLD-Footing | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | NR |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Dave Hannah
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Brandon Shaw
|
|
|
Mana Phone #: ###-#### Phase III
|
BLD-Footing | 5/26/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Dave Hannah
|
|
|
Mana Phone #: ###-####
|
PubWorks Subgrade Approval | 5/26/2017 | 5/26/2017 | 5/26/2017 | | DONE |
Jason C. Taylor
|
|
|
**House and Downhill retaining wall***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | PART |
Tony Young
|
|
|
Sean Phone #: ###-####
|
BLD-Footing | 5/3/2017 | 5/4/2017 | 5/4/2017 | P | PASS |
Tony Young
|
|
|
Mana Phone #: ###-####
|
PubWorks Subgrade Approval | 5/4/2017 | 5/4/2017 | 5/4/2017 | | DONE |
Jason C. Taylor
|
|
|
***PORTION OF FOOTINGS ON WEST SIDE OF HOUSE/WALLS.***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PART |
Brandon Shaw
|
|
|
Mama Phone #: ###-#### First section of house
|
BLD-Foundation | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | NR |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PART |
Dave Hannah
|
|
|
Mana Phone #: ###-#### first section of house
|
PubWorks Subgrade Approval | 4/11/2017 | 4/11/2017 | 4/11/2017 | | DONE |
Jason C. Taylor
|
|
|
***Portions of footings on east side of residence**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
BLD-Foundation | 3/22/2017 | 3/23/2017 | 3/23/2017 | P | PART |
Dave Hannah
|
|
|
Mana Phone #: ###-#### one more section of retaing wall and back wall of house ok to place
|
BLD-Footing | 3/21/2017 | 3/22/2017 | 3/22/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, same,, soils ok now
|
BLD-Footing | 3/20/2017 | 3/21/2017 | 3/22/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, ok for designated areas per soils report
|
PubWorks Subgrade Approval | 3/22/2017 | 3/22/2017 | 3/22/2017 | | DONE |
Jason C. Taylor
|
|
|
**Portion of 3rd retaining wall and eastern portion of house foundation***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 3/17/2017 | 3/20/2017 | 3/20/2017 | P | CANC |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 1/30/2017 | 1/31/2017 | 1/31/2017 | A | PART |
Jim Sly
|
|
|
Wall // Mana Phone #: ###-#### Upper wall OK
|
BLD-Footing | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PART |
Tony Young
|
|
|
mana Phone #: ###-####,, ok to pour same as soil report
|
PubWorks Subgrade Approval | 1/26/2017 | 1/26/2017 | 1/26/2017 | | DONE |
Jason C. Taylor
|
|
|
****REMAINING PORTION OF UPPER WALL ***A letter from the applicant’s geotechnical engineer indicating that the retaining wall subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 1/9/2017 | 1/9/2017 | 1/9/2017 | P | PART |
Tony Young
|
|
|
Wall // Mana Phone #: ###-####,, retaining walls,, work in progress
|
BLD-Foundation | 12/30/2016 | 1/3/2017 | 1/3/2017 | A | NR |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PART |
Jim Storey
|
|
|
Sean Phone #: ###-#### place with si per form 310
|
BLD-Footing | 12/21/2016 | 12/22/2016 | 12/22/2016 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, cold weather provisions in place,, footings ok per the approved soils areas.. (retaining walls)
|
PubWorks Subgrade Approval | 12/22/2016 | 12/22/2016 | 12/22/2016 | | DONE |
Jason C. Taylor
|
|
|
***UPPER WALLS - MIDDLE WALL AND EAST HALF OF UPPER WALL ONLY****A letter from the applicant’s geotechnical engineer indicating that the retaining wall subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Telephone call | | | 10/24/2016 | | DONE |
|
|
|
called Roth Homes to let knw permit is ready-emailed the fees due to Steve
|
Issue PAID IN FULL permit | | | 10/24/2016 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2016 | | DONE |
|
|
|
talked to Breann at ACHD-she said no fees are due-impacts were paid in 1999
|
OVERRIDE | | | 10/21/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/6/2016 | | 10/21/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 7/22; plan check, hillside (will route to outsource), planning (appeal) **routed to outside structural 7/28
|
Routing - PLAN CHECK | 10/14/2016 | | 10/21/2016 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 10/14/2016 | | 10/14/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 10/7/2016 | | 10/14/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 10/7/2016 | | DONE |
|
|
|
received (3) plan sheets of; cross section 7.1, 7.4, 7.6 and details 7.7
|
Routing - PLANNING | 10/4/2016 | | 10/4/2016 | | PASS |
Celine Acord
|
|
|
per CFH16-00020, appeal denied 9-13-16
|
Routing Off Site - STRUCTURAL | 9/26/2016 | | 9/30/2016 | | PASS |
Tisha Gallop
|
|
|
see attached document
|
Routing PW Grading-Hillside | 9/26/2016 | | 9/28/2016 | | FAIL |
Jason C. Taylor
|
|
|
See email dated 9/28/2016. JCT
|
Telephone call | | | 9/26/2016 | | DONE |
|
|
|
called Action Courier to come pick up plans and take to AHJ Engineering
|
Plan resubmittals received | | | 9/23/2016 | | DONE |
|
|
|
resubmittals received 3 full sets of drawings-grading and draingage included-letter from Chris (Roth Homes)-app #310-ICC Report & engineering-took to Tisha
|
Plan resubmittals received | | | 9/22/2016 | | DONE |
|
|
|
(3) sets of grading resubmittals
|
Routing Off Site - STRUCTURAL | 7/29/2016 | | 8/12/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - FIRE | 7/21/2016 | | 7/22/2016 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans. This permit will require a life safety inspection from the pfd/fire inspector to confirm installation of the required turf grass at the south of the structure; as per CFH16-00020 requirements.
|
Routing - PLAN CHECK | 7/22/2016 | | 7/22/2016 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/22/2016 | | FAIL |
|
|
|
|
Routing - Erosion and Sediment | 7/20/2016 | | 7/21/2016 | | PASS |
Evan Jenkins
|
|
|
(site prep inspection and approval required prior to earth disturbance)
Permit for the construction of a new 4,770 sq. ft., two story (first story 1,836 sq. ft., second story 2,934 sq. ft.) single family dwelling with 3 bedrooms, 2 full bathrooms & 2 half bathrooms, approximately *** sq. ft. of covered patio/porch and a *** sq. ft. attached garage
|
Routing - MECHANICAL | 7/18/2016 | | 7/20/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/15/2016 | | 7/18/2016 | | FAIL |
Celine Acord
|
|
|
Appeal Received 7-18-16; Hold until P&Z Hearing date in Sept
|
Routing - PUBLIC WORKS | 7/15/2016 | | 7/15/2016 | | FAIL |
Rachael Beierle
|
|
|
SEE HILLSIDE
|
Routing PW Grading-Hillside | 7/8/2016 | | 7/15/2016 | | FAIL |
Jason C. Taylor
|
|
|
New grading plans are to be submitted next week. JCT
|
Routing PW Sewer Rating | 7/15/2016 | | 7/15/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 7/6/2016 | | 7/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/5/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2016 | | DONE |
|
|
|
|
Application received | | 7/5/2016 | | | |
|
|
|
|