DOC - Permit Finaled | | | 12/7/2016 | | DONE |
|
|
|
|
BLD-Conference | 10/17/2016 | 10/18/2016 | 10/18/2016 | A | PASS |
Jim Storey
|
|
|
Please call Seth to schedule a final inspection. Possibly already completed but still showing open on PDS Online Phone #: ###-#### Inspection requested via web by Andrea Day
|
BLD-Conference | 10/14/2016 | 10/17/2016 | 10/17/2016 | P | DEFR |
Jim Storey
|
|
|
Please call Seth to schedule a final inspection. Possibly already completed but still showing open on PDS Online Phone #: ###-#### Inspection requested via web by Andrea Day out of time
|
Issue PAID IN FULL permit | | | 7/13/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/6/2016 | | |
|
|
|
|
Telephone call | | | 7/6/2016 | | DONE |
|
|
|
emailed Andrea that the permit is ready and how much is owed
|
Routing - Erosion and Sediment | 7/6/2016 | | 7/6/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP designated.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2016 | | DONE |
|
|
|
***all requirments met 7-13-16 /CEV
need sewer cap-bond on file
|
Telephone call | | | 7/5/2016 | | DONE |
|
|
|
emailed Andrea-we need he SWPPP plans or waiver letter before we can start the process
|
Application received | | 7/5/2016 | | | |
|
|
|
|